天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁(yè) > 科技論文 > 礦業(yè)工程論文 >

深井提升鋼絲繩疲勞及安全性分析

發(fā)布時(shí)間:2019-01-09 10:24
【摘要】:深井提升鋼絲繩的疲勞和安全性問(wèn)題直接關(guān)系著提升系統(tǒng)的可靠性,現(xiàn)在許多礦井的開(kāi)采深度已經(jīng)達(dá)到千米級(jí)別,但是鋼絲繩的實(shí)際使用時(shí)間在許多礦井反饋顯示都遠(yuǎn)小于《規(guī)程》要求的時(shí)間,經(jīng)常出現(xiàn)提前破壞不得不更換鋼絲繩的情形,這也給礦井生產(chǎn)帶來(lái)困擾,所以研究深井提升鋼絲繩的疲勞和安全性問(wèn)題,可以為解決深井提升鋼絲繩的使用時(shí)間短的問(wèn)題提供建議和指導(dǎo)。本文以多繩摩擦提升系統(tǒng)為研究對(duì)象,首先計(jì)算了立井提升系統(tǒng)中提升鋼絲繩的幾個(gè)關(guān)鍵點(diǎn)的應(yīng)力計(jì)算方法,然后分別對(duì)兩個(gè)提升高度具有典型意義的礦井的應(yīng)力作了數(shù)值計(jì)算。同時(shí)為了得到較為準(zhǔn)確的鋼絲繩的交變應(yīng)力結(jié)果,對(duì)礦井的不同工況條件下的交變應(yīng)力作了分析計(jì)算,得到在勻速工況下的到的交變應(yīng)力的幅值范圍是大于實(shí)際工況的應(yīng)力幅值范圍,所以它的結(jié)果可以代替實(shí)際工況來(lái)作應(yīng)力分析。在應(yīng)力分析的基礎(chǔ)上,對(duì)提升鋼絲繩作應(yīng)力疲勞分析,疲勞分析的過(guò)程分為危險(xiǎn)點(diǎn)的確定和交變應(yīng)力的幅值對(duì)疲勞壽命的影響。分析的結(jié)果顯示,在深井提升系統(tǒng)中,鋼絲繩的疲勞壽命較短,基本在半年到一年左右,而淺井的鋼絲繩能滿足設(shè)計(jì)要求的使用壽命;同時(shí)交變應(yīng)力的幅值大小也會(huì)影響鋼絲繩的疲勞壽命,當(dāng)應(yīng)力幅值越大,鋼絲繩疲勞壽命降低的越快;為讓深井提升鋼絲繩的使用時(shí)間更長(zhǎng),采取降低提升容器載重的辦法,實(shí)現(xiàn)了對(duì)深井提升鋼絲繩的使用時(shí)間的延長(zhǎng)。提升鋼絲繩的安全性問(wèn)題一直是鋼絲繩的設(shè)計(jì)選型的關(guān)注問(wèn)題,我國(guó)傳統(tǒng)的鋼絲繩的選型上的安全系數(shù)的計(jì)算方法被普遍認(rèn)為偏大,因此對(duì)國(guó)內(nèi)和歐盟的鋼絲繩的選型設(shè)計(jì)的方法作了分析,得出《規(guī)程》中的安全系數(shù)存在很大的余量區(qū)間,國(guó)外在鋼絲繩的選型上主要是考慮鋼絲繩的性能和使用的工況來(lái)選擇,而不是采用傳統(tǒng)的安全系數(shù)方法來(lái)選型。所以借鑒國(guó)外的經(jīng)驗(yàn)提出新安全系數(shù)取值計(jì)算方法。
[Abstract]:The fatigue and safety problems of deep shaft hoisting rope are directly related to the reliability of the hoisting system. Now the mining depth of many mines has reached the kilometer level. However, the actual service time of the wire rope in many mines is much less than the time required by the regulations, and it often occurs that the wire rope has to be replaced in advance of the damage, which also brings trouble to the mine production. Therefore, the research on the fatigue and safety of deep shaft hoisting rope can provide advice and guidance for solving the problem of short service time of deep shaft hoisting wire rope. In this paper, the multi-rope friction hoisting system is taken as the research object. Firstly, the stress calculation method of several key points of hoisting wire rope in shaft hoisting system is calculated. Then the stresses of two typical hoisting heights are numerically calculated. At the same time, in order to get more accurate results of alternating stress of wire rope, the alternating stress of mine under different working conditions is analyzed and calculated. It is obtained that the amplitude range of the alternating stress under uniform working condition is larger than that of the actual condition, so its result can replace the actual working condition for the stress analysis. On the basis of stress analysis, the stress fatigue analysis of hoisting wire rope is carried out. The process of fatigue analysis is divided into the determination of dangerous point and the influence of the amplitude of alternating stress on fatigue life. The analysis results show that the fatigue life of wire rope is short, which is about half a year or so in deep shaft hoisting system, while the service life of shallow well wire rope can meet the design requirement. At the same time, the amplitude of alternating stress will also affect the fatigue life of wire rope. The larger the stress amplitude is, the faster the fatigue life of wire rope will be reduced. In order to prolong the service time of deep shaft hoisting wire rope, the method of reducing the load of lifting vessel is adopted to prolong the use time of deep well hoisting wire rope. The safety problem of lifting wire rope has always been the concern of the design and selection of wire rope. The traditional calculation method of safety factor on the selection of wire rope in our country is generally considered to be too large. Therefore, the selection and design method of steel wire rope in China and the European Union is analyzed, and it is concluded that there is a very large margin in the safety factor in the Code. In foreign countries, the selection of wire rope is mainly based on the performance of wire rope and the operating conditions, rather than the traditional method of safety factor. Therefore, a new calculation method of safety factor is put forward based on the experience of foreign countries.
【學(xué)位授予單位】:安徽理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TD532

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 徐維華;多繩摩擦提升鋼絲繩的使用維護(hù)及更換[J];礦山機(jī)械;2000年12期

2 楊厚華;多層纏繞提升鋼絲繩的使用[J];煤礦機(jī)械;2000年12期

3 潘英;提升鋼絲繩中最大動(dòng)張力的計(jì)算公式[J];煤炭學(xué)報(bào);2000年S1期

4 李劍鋒;壓注油工藝在提升鋼絲繩維護(hù)中應(yīng)用效果好[J];煤礦機(jī)械;2001年09期

5 李劍鋒;壓注油工藝在提升鋼絲繩維護(hù)中的應(yīng)用[J];有色設(shè)備;2002年03期

6 王中華;煤礦提升鋼絲繩的應(yīng)用探討[J];煤礦機(jī)電;2003年03期

7 董信華,田文龍;煤礦提升鋼絲繩安全的技術(shù)研究[J];中國(guó)安全生產(chǎn)科學(xué)技術(shù);2005年03期

8 薛天山;立井提升鋼絲繩正確使用和維護(hù)方法[J];煤炭技術(shù);2005年08期

9 葉大干;闕勝利;崔建井;李武;;立井提升鋼絲繩更換施工技術(shù)[J];煤炭科技;2006年02期

10 宋彤菊;;淺談提高礦用提升鋼絲繩壽命的方法[J];科技情報(bào)開(kāi)發(fā)與經(jīng)濟(jì);2007年32期

相關(guān)會(huì)議論文 前7條

1 敖劍林;劉木林;金春和;文金萍;;延長(zhǎng)斜井主提升鋼絲繩使用壽命的綜合技術(shù)[A];2007年贛皖湘蘇閩五省煤炭學(xué)會(huì)聯(lián)合學(xué)術(shù)交流會(huì)論文集[C];2007年

2 陳健強(qiáng);;礦井提升鋼絲繩防護(hù)措施和檢測(cè)方法淺析[A];2007年贛皖湘蘇閩五省煤炭學(xué)會(huì)聯(lián)合學(xué)術(shù)交流會(huì)論文集[C];2007年

3 甄陽(yáng)清;;煤礦井下提升鋼絲繩的損傷與防護(hù)[A];2003年度優(yōu)秀學(xué)術(shù)論文集——煤礦先進(jìn)生產(chǎn)技術(shù)交流會(huì)論文集[C];2003年

4 曹培玉;;斜井提升鋼絲繩的主要損傷及維護(hù)[A];山東省煤炭學(xué)會(huì)2006年年會(huì)論文集[C];2006年

5 曹小白;;斜井提升鋼絲繩的安全管理[A];煤礦安全與機(jī)械化——采、掘、運(yùn)裝備論文集[C];2006年

6 高文軍;劇元達(dá);崔立新;董信華;郝磊;胡龍兵;戴步貴;卞松瀚;祁顯貴;沈志祥;康宜華;林德偉;項(xiàng)曉峰;;基于物聯(lián)網(wǎng)的提升鋼絲繩在線檢測(cè)實(shí)時(shí)報(bào)警系統(tǒng)[A];電力行業(yè)信息化優(yōu)秀成果集2013[C];2013年

7 雨愛(ài)衛(wèi);;淺談礦井提升鋼絲繩斷絲定量檢測(cè)[A];開(kāi)灤礦區(qū)采礦技術(shù)與實(shí)踐文集[C];2009年

相關(guān)重要報(bào)紙文章 前1條

1 魏蕾;高層建筑屋頂旗桿的吊裝工藝[N];中華建筑報(bào);2000年

相關(guān)博士學(xué)位論文 前3條

1 曹國(guó)華;礦井提升鋼絲繩裝載沖擊動(dòng)力學(xué)行為研究[D];中國(guó)礦業(yè)大學(xué);2009年

2 寇保福;提升鋼絲繩力學(xué)性能及其調(diào)換繩技術(shù)研究[D];太原理工大學(xué);2015年

3 王紅堯;煤礦提升鋼絲繩在線檢測(cè)關(guān)鍵技術(shù)研究[D];中國(guó)礦業(yè)大學(xué);2009年

相關(guān)碩士學(xué)位論文 前10條

1 張敏;6×36WS+FC提升鋼絲繩性能研究[D];太原理工大學(xué);2016年

2 黃鎮(zhèn);提升鋼絲繩磨損特性研究[D];太原理工大學(xué);2016年

3 夏吉山;施工立井提升鋼絲繩耦合振動(dòng)及內(nèi)部鋼絲運(yùn)動(dòng)特性研究[D];中國(guó)礦業(yè)大學(xué);2016年

4 徐世俊;大型礦用挖掘機(jī)載荷統(tǒng)計(jì)與動(dòng)力學(xué)研究[D];東北大學(xué);2013年

5 江厚祥;深井提升鋼絲繩疲勞及安全性分析[D];安徽理工大學(xué);2017年

6 梁敏;摩擦提升系統(tǒng)提升鋼絲繩的振動(dòng)分析與試驗(yàn)研究[D];太原理工大學(xué);2015年

7 吳榮華;立井摩擦提升鋼絲繩張力平衡動(dòng)態(tài)特性及優(yōu)化研究[D];中國(guó)礦業(yè)大學(xué);2014年

8 李飛仙;礦井提升鋼絲繩監(jiān)測(cè)裝置研制及模擬分析[D];安徽理工大學(xué);2010年

9 劉鵬;提升鋼絲繩張力傳感器設(shè)計(jì)研究[D];安徽理工大學(xué);2013年

10 王望;斜井提升鋼絲繩防脫裝置的研究[D];太原理工大學(xué);2012年

,

本文編號(hào):2405496

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/kuangye/2405496.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶71e44***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com