百良旭升煤礦巷道支護(hù)參數(shù)優(yōu)化研究
[Abstract]:Based on the field test data and the finite difference simulation calculation, the related parameters of the original support design of the roadway are analyzed and evaluated based on the engineering background of the supporting roadway of No. 505 transport in Bailiangxusheng Coal Mine. On the basis of this, different roadway support schemes are put forward, the supporting parameters of different schemes are compared and analyzed, and the optimal support scheme is put forward. Its main work is as follows: 1. This paper analyzes and summarizes the action mechanism and design theory of anchor rod (cable), and based on the theory of self-stable invisible arch, deduces the parameter design formula of bolt (cable) supporting system. 2. By means of field monitoring and numerical simulation, the original support of 505 transportation along the channel is analyzed and evaluated. It is found that under the original support conditions, the surrounding rock deformation is obvious, the stress concentration phenomenon is serious, and the stability of surrounding rock can not be maintained. Based on the theory of self-stable stealthy arch, the related parameters of the original support scheme are optimized, and two sets of contrast schemes are put forward according to the engineering analogy method. The three schemes are calculated and analyzed by using FLAC3D simulation software, and the optimal support scheme is determined from the point of view of supporting effect, and the optimized scheme is applied to the design of roadway support. The field monitoring shows that the new support system can effectively improve the ability of resisting deformation and failure of surrounding rock, which is helpful to give full play to the bearing capacity of surrounding rock of roadway and can meet the requirements of engineering. The contents and achievements of this paper provide important reference value for the design of roadway support in the future, enrich and develop the design theory of bolt (cable) support, and have important guiding significance for the design of bolt (cable) support.
【學(xué)位授予單位】:西安科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TD353
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 鞠文君;;煤礦巷道支護(hù)動(dòng)態(tài)信息設(shè)計(jì)法[J];中國(guó)安全科學(xué)學(xué)報(bào);2006年02期
2 張路亭;;關(guān)于煤礦巷道支護(hù)技術(shù)的探究[J];產(chǎn)業(yè)與科技論壇;2011年08期
3 王軍;;淺析數(shù)值模擬在煤礦巷道支護(hù)設(shè)計(jì)中的應(yīng)用[J];科技資訊;2013年08期
4 楊仁樹;馬鑫民;李清;張軍;白曉生;王茂源;;煤礦巷道支護(hù)方案專家系統(tǒng)及應(yīng)用研究[J];采礦與安全工程學(xué)報(bào);2013年05期
5 周榴寶;;我國(guó)煤礦巷道支護(hù)機(jī)械化現(xiàn)狀與發(fā)展[J];煤礦機(jī)械;1991年06期
6 郗澤松;;煤礦巷道支護(hù)類型研究[J];內(nèi)蒙古煤炭經(jīng)濟(jì);2014年04期
7 孔祥義;神東孫家溝煤礦巷道支護(hù)模擬實(shí)驗(yàn)[J];煤礦安全;2004年04期
8 王軍號(hào);孟祥瑞;;可視化煤礦巷道支護(hù)設(shè)計(jì)專家系統(tǒng)的開發(fā)研究[J];煤炭工程;2010年05期
9 冉茂權(quán);;淺談煤礦巷道支護(hù)新技術(shù)[J];科技風(fēng);2011年06期
10 靳瑞;賈東修;;煤礦巷道支護(hù)[J];黑龍江科技信息;2012年33期
相關(guān)會(huì)議論文 前3條
1 張文明;;數(shù)值模擬永勝煤礦巷道支護(hù)設(shè)計(jì)[A];第三屆全國(guó)煤礦機(jī)械安全裝備技術(shù)發(fā)展高層論壇暨新產(chǎn)品技術(shù)交流會(huì)論文集[C];2012年
2 康紅普;王金華;林健;;煤礦巷道支護(hù)技術(shù)的研究與應(yīng)用[A];全國(guó)大型煤炭企業(yè)綜采技術(shù)發(fā)展成果集[C];2010年
3 肖福坤;;煤礦巷道支護(hù)智能決策系統(tǒng)[A];中國(guó)軟巖工程與深部災(zāi)害控制研究進(jìn)展——第四屆深部巖體力學(xué)與工程災(zāi)害控制學(xué)術(shù)研討會(huì)暨中國(guó)礦業(yè)大學(xué)(北京)百年校慶學(xué)術(shù)會(huì)議論文集[C];2009年
相關(guān)重要報(bào)紙文章 前1條
1 謝正義 王永舜;我國(guó)煤礦巷道支護(hù)技術(shù)取得重大突破[N];安徽經(jīng)濟(jì)報(bào);2003年
相關(guān)碩士學(xué)位論文 前3條
1 郭林生;百良旭升煤礦巷道支護(hù)參數(shù)優(yōu)化研究[D];西安科技大學(xué);2015年
2 王文杰;岱莊生建煤礦巷道支護(hù)決策系統(tǒng)研究[D];山東科技大學(xué);2005年
3 劉芳媛;孫村煤礦巷道支護(hù)技術(shù)經(jīng)濟(jì)分析[D];山東科技大學(xué);2011年
,本文編號(hào):2384201
本文鏈接:http://sikaile.net/kejilunwen/kuangye/2384201.html