厚煤層殘煤復(fù)采工作面巷道支護(hù)技術(shù)研究
[Abstract]:Coal is a non-renewable resource and plays an irreplaceable role in our country's economic and social life. With the rapid mining of high quality coal seams for many years, coal resources have been nearly exhausted, and how to recover the remaining coal resources to the maximum extent has naturally been put on the agenda of research. After laggard strip mining on thick coal seam of Hufeng coal industry, there is a large amount of high quality coal resources left behind. It is of great significance to improve the recovery rate of coal mine by remining the residual coal resources. When mining this part of coal resources, the roadway is more difficult to support than the common roadway because of the serious surrounding rock fragmentation. Therefore, it is of great practical significance to study the suitable supporting methods under the surrounding rock conditions for the safe and efficient production of coal mines. According to the special failure situation of roadway surrounding rock in thick coal seam of Hufeng coal industry, this paper adopts field investigation and numerical simulation research method, according to the characteristics of surrounding rock failure. According to the analysis of rock pressure behavior law and surrounding rock pressure state of roadway surrounding rock under this kind of condition, the support of roadway surrounding rock in working face is designed reasonably, and the numerical simulation effect of each scheme is compared. Determine the best support mode and give the support parameters: (1) when the roof of the old goaf does not fall over the mining roadway: I steel shed support, the row distance is 700 mm; (2) when the roof of the old goaf collapses above the mining roadway, the short bolt I-steel shed is used to support: a, when the thickness of the top coal is 1.2m, the length of the bolt is 1.0 m, and the interval between them is 900 mm 脳 900 mm; I-shaped steel shed, 700 mm;. B, when the thickness of top coal is 1.4 m, the length of anchor rod is 1.2 m, the length of anchor rod is 1.4 m, the length of bolt is 1.4 m, and the distance between row distance is 900 mm 脳 900 mm; I-shaped steel shed, when the distance between row distance is 900 mm 脳 900 mm;, the length of anchor rod is 1.4 m, and the distance between row distance is 900 mm 脳 900 mm;, when the thickness of top coal is 1. 6 m. (3) when the coal pillar is met above the mining roadway, it is a long bolt bolting wire mesh support mode, and the length of the roof bolt is 2500 mm 脳 900 mm; cable length 8200 mm, the length of the roof bolt is 1900mm 脳 1500 mm. (3) when the coal pillar is met above the mining roadway, the length of the roof bolt is 2500 mm 脳 900 mm;.
【學(xué)位授予單位】:太原理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TD353
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 林衛(wèi)國(guó);;豐海煤礦老采區(qū)復(fù)采的技術(shù)管理[J];煤炭技術(shù);2006年03期
2 林科淵;;淺談豐海煤礦老采區(qū)復(fù)采存在的危險(xiǎn)及防范措施[J];能源與環(huán)境;2009年04期
3 張成勇;紀(jì)峰;宋丹;;水采區(qū)復(fù)采方法的研究與應(yīng)用[J];中小企業(yè)管理與科技(下旬刊);2010年02期
4 劉玉果;張磊鑫;王敏;;省外煤礦復(fù)采找煤技術(shù)的研究與應(yīng)用[J];山東煤炭科技;2010年04期
5 秦樹國(guó);;論資源整合礦井優(yōu)質(zhì)資源復(fù)采工藝[J];山西科技;2011年06期
6 王彪;苗文山;石棟;陳永坡;;舊區(qū)復(fù)采綜合技術(shù)研究[J];煤;2012年07期
7 鮑貴林;王勇;張樹立;;3層煤復(fù)采技術(shù)的研究與創(chuàng)新[J];內(nèi)蒙古煤炭經(jīng)濟(jì);2013年06期
8 許鍵;復(fù)采經(jīng)濟(jì)效益的采前估算[J];河北煤炭;1994年03期
9 焦士海;蘇鋒;;二層煤復(fù)采技術(shù)的研究與創(chuàng)新[J];中小企業(yè)管理與科技(上旬刊);2014年04期
10 孫可明,孫振海;木城澗礦底煤復(fù)采平面模擬試驗(yàn)研究[J];遼寧工程技術(shù)大學(xué)學(xué)報(bào)(自然科學(xué)版);2002年01期
相關(guān)會(huì)議論文 前10條
1 張志遠(yuǎn);李連富;張青山;;雙陽煤礦10號(hào)層煤多次反程序開采后復(fù)采研究[A];第四屆全國(guó)煤炭工業(yè)生產(chǎn)一線青年技術(shù)創(chuàng)新文集[C];2009年
2 左成豪;王加興;石龍飛;;八一煤礦北翼復(fù)采區(qū)防治水方法[A];山東煤炭學(xué)會(huì)2004年度優(yōu)秀學(xué)術(shù)論文集[C];2004年
3 周德琛;;雙陽煤礦10號(hào)層煤多次反程序開采后復(fù)采研究[A];中國(guó)煤炭學(xué)會(huì)水力采煤專業(yè)委員會(huì)2009年度學(xué)術(shù)交流會(huì)論文匯編[C];2009年
4 祁明峰;韓昌強(qiáng);辛東京;;百善煤礦復(fù)采技術(shù)研究與實(shí)踐[A];全國(guó)煤礦復(fù)雜難采煤層開采技術(shù)[C];2012年
5 吳正海;武毅;李保山;張楓林;;殘余煤安全復(fù)采技術(shù)研究與應(yīng)用[A];第七屆全國(guó)煤炭工業(yè)生產(chǎn)一線青年技術(shù)創(chuàng)新文集[C];2012年
6 王鴻云;;襄垣地區(qū)水力復(fù)采殘留煤的研究[A];中國(guó)煤炭學(xué)會(huì)水力采煤專業(yè)委員會(huì)2011年度學(xué)術(shù)交流會(huì)論文匯編[C];2011年
7 王岳;曹洪征;劉立忠;畢可福;;淺談老柞山金礦砂金復(fù)采[A];第六屆全國(guó)采礦學(xué)術(shù)會(huì)議論文集[C];1999年
8 段新江;孫鵬;張德利;;實(shí)施報(bào)廢水平階段煤柱復(fù)采創(chuàng)造新的經(jīng)濟(jì)增長(zhǎng)點(diǎn)[A];中國(guó)科協(xié)2004年學(xué)術(shù)年會(huì)第16分會(huì)場(chǎng)論文集[C];2004年
9 王興忠;;曲斗煤礦邊角塊段承包的管理改革措施淺議[A];2007年贛皖湘蘇閩五省煤炭學(xué)會(huì)聯(lián)合學(xué)術(shù)交流會(huì)論文集[C];2007年
10 王剛;;“大采長(zhǎng)小擴(kuò)大”復(fù)采設(shè)計(jì)在提高殘采資源回收率中的應(yīng)用[A];第四屆全國(guó)煤炭工業(yè)生產(chǎn)一線青年技術(shù)創(chuàng)新文集[C];2009年
相關(guān)重要報(bào)紙文章 前1條
1 本報(bào)記者 陳明;舊區(qū)復(fù)采讓老煤礦重獲新生[N];中國(guó)礦業(yè)報(bào);2011年
相關(guān)博士學(xué)位論文 前4條
1 焦雪峰;厚煤層舊采區(qū)復(fù)采礦壓規(guī)律及其應(yīng)用研究[D];太原理工大學(xué);2016年
2 陸剛;衰老礦井殘煤可采性評(píng)價(jià)與復(fù)采技術(shù)研究[D];中國(guó)礦業(yè)大學(xué);2010年
3 張小強(qiáng);厚煤層殘煤復(fù)采采場(chǎng)圍巖控制理論及其可采性評(píng)價(jià)研究[D];太原理工大學(xué);2015年
4 李春生;復(fù)采煤層充填開采方法及其地表下沉機(jī)理研究[D];中國(guó)礦業(yè)大學(xué)(北京);2013年
相關(guān)碩士學(xué)位論文 前8條
1 徐霏;厚煤層殘煤超高水材料充填復(fù)采關(guān)鍵技術(shù)研究[D];中國(guó)礦業(yè)大學(xué);2015年
2 劉大鵬;房柱殘煤工作面平行巷道復(fù)采的礦壓顯現(xiàn)規(guī)律研究[D];太原理工大學(xué);2014年
3 李超;復(fù)采工作面礦壓顯現(xiàn)規(guī)律及過冒頂區(qū)頂板斷裂特征研究[D];太原理工大學(xué);2016年
4 李蕾;厚煤層橫跨煤柱復(fù)采工作面礦壓顯現(xiàn)特征研究[D];太原理工大學(xué);2017年
5 劉廣金;積水老空區(qū)殘煤復(fù)采數(shù)值模擬研究[D];太原理工大學(xué);2015年
6 高春生;運(yùn)營(yíng)鐵路橋下復(fù)采技術(shù)研究與實(shí)踐[D];遼寧工程技術(shù)大學(xué);2005年
7 楊慶威;白皎煤礦余煤復(fù)采頂板控制及防滅火技術(shù)應(yīng)用[D];西安科技大學(xué);2013年
8 張文陽;厚煤層上分層巷柱開采區(qū)殘煤復(fù)采工作面礦壓特征的研究[D];太原理工大學(xué);2013年
,本文編號(hào):2382918
本文鏈接:http://sikaile.net/kejilunwen/kuangye/2382918.html