房柱采空區(qū)下特厚煤層開采煤巖垮落特征相似模擬試驗研究
發(fā)布時間:2018-11-26 17:41
【摘要】:針對房柱采空區(qū)下特厚煤層開采覆巖垮落運移引起冒頂壓架的災(zāi)害問題,以斜溝煤礦13號煤層大采高放頂煤工作面為工程背景,運用相似模擬試驗,對房柱式采空區(qū)下特厚煤層開采覆巖垮落特征進(jìn)行分析。研究結(jié)果表明:底煤開采過程中有著明顯的頂煤初次垮落,直接頂初次垮落,基本穩(wěn)定在0.23 m(23 m)左右;進(jìn)出煤柱時,壓力較大,圍巖破碎嚴(yán)重,且可能與老采區(qū)裂隙帶貫通造成突水、瓦斯突出等事故。研究結(jié)果可為了類似條件下覆巖垮落規(guī)律提供依據(jù)和參考。
[Abstract]:In view of the disaster problem caused by overburden collapse migration caused by overburden collapse and migration in Fangzhu goaf, taking No. 13 coal seam top caving face of Jiaogou Coal Mine as engineering background, similar simulation test is used. The characteristics of overburden caving in thick coal seam mining under the roof pillar goaf are analyzed. The results show that there are obvious top coal caving and direct top coal caving in the process of bottom coal mining, which is basically stable at about 0.23 m (23 m); When entering and leaving the coal pillar, the pressure is high, the surrounding rock is broken seriously, and the water inrush and gas outburst may occur through the fracture zone of the old mining area. The results can provide basis and reference for the law of overburden collapse under similar conditions.
【作者單位】: 太原理工大學(xué)采煤工藝研究所;中國礦業(yè)大學(xué)(北京)煤炭資源與安全開采國家重點實驗室;
【基金】:國家自然科學(xué)基金資助項目(51404167) 中國博士后科學(xué)基金資助項目(2016M590151) 煤炭資源與安全開采國家重點實驗室開放基金項目(SKLCRSM14KFB08)
【分類號】:TD823.254
本文編號:2359201
[Abstract]:In view of the disaster problem caused by overburden collapse migration caused by overburden collapse and migration in Fangzhu goaf, taking No. 13 coal seam top caving face of Jiaogou Coal Mine as engineering background, similar simulation test is used. The characteristics of overburden caving in thick coal seam mining under the roof pillar goaf are analyzed. The results show that there are obvious top coal caving and direct top coal caving in the process of bottom coal mining, which is basically stable at about 0.23 m (23 m); When entering and leaving the coal pillar, the pressure is high, the surrounding rock is broken seriously, and the water inrush and gas outburst may occur through the fracture zone of the old mining area. The results can provide basis and reference for the law of overburden collapse under similar conditions.
【作者單位】: 太原理工大學(xué)采煤工藝研究所;中國礦業(yè)大學(xué)(北京)煤炭資源與安全開采國家重點實驗室;
【基金】:國家自然科學(xué)基金資助項目(51404167) 中國博士后科學(xué)基金資助項目(2016M590151) 煤炭資源與安全開采國家重點實驗室開放基金項目(SKLCRSM14KFB08)
【分類號】:TD823.254
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 楊雙鎖,康立勛,錢鳴高;直接頂循環(huán)垮落高度對其第一分層穩(wěn)定性的影響[J];太原理工大學(xué)學(xué)報;1999年02期
2 涂敏,謝廣祥;走向短壁水力采煤法頂板周期垮落規(guī)律的研究[J];煤炭科學(xué)技術(shù);2000年06期
3 涂敏,謝廣祥;走向短壁水力采煤頂板周期垮落規(guī)律研究[J];巖石力學(xué)與工程學(xué)報;2004年15期
4 王慶康,霍振奇;采場直接頂?shù)某醮慰迓湟?guī)律及其計算方法[J];礦山壓力;1987年01期
5 李忠義;;韓城礦區(qū)主采煤層長壁采面直接頂初次垮落步距的計算[J];陜西煤炭技術(shù);1989年04期
6 江萬剛;;松軟煤體垮落孔洞特征分析[J];煤礦安全;2014年02期
7 莊德林;李興尚;許家林;;垮落區(qū)注漿充填壓實特性的PFC~(2D)模擬試驗[J];采礦與安全工程學(xué)報;2008年01期
8 閆少宏,樊運策,徐貴才;綜放回收率與煤巖垮落特征關(guān)系[J];礦山壓力與頂板管理;1998年04期
9 王作棠;辛林;付振坤;杜艷德;吳俊一;;較堅硬火成巖老頂損傷垮落步距的計算預(yù)測[J];煤炭工程;2010年07期
10 齊學(xué)勇,劉昊,李國君,丘其祥;大興礦S_1706運順巷道垮落原因分析[J];煤礦安全;2001年02期
,本文編號:2359201
本文鏈接:http://sikaile.net/kejilunwen/kuangye/2359201.html