煤礦超高水充填設(shè)備參數(shù)化設(shè)計(jì)與虛擬裝配
[Abstract]:Coal is an important source of energy and raw materials for industrial production in China. As a kind of green and environmental protection mining technology, filling mining technology can effectively improve the coal mining rate of coal mines and realize the full utilization of resources. At the same time, can effectively protect the surrounding natural environment. The new super-high water filling mining technology can effectively guarantee the safety of "three down" mining, maximize the recovery of mineral resources, prolong mine mining life, at the same time protect underground, surface environment and reduce surface subsidence. Super-high-water filling technology has the characteristics of relatively simple process system, low pre-investment, good filling effect and so on. The application of ultra-high water filling technology mainly depends on the filling station built on the surface and the filling pipe through the mine, in which the high water filling station is the most important part. This paper mainly studies the super-high water filling project in Jizhong Energy Jiulong Mine. According to the engineering practice, the new design method is used to design and optimize the mechanical equipment used in the project. Firstly, the development status of filling mining technology is briefly introduced. The structure and equipment arrangement of super high water filling station are introduced with sample engineering, and the working flow of the equipment is expounded. Secondly, the principle of parameterized design and its development process are described, and the SolidWorks software used in this paper is introduced. By referring to the design drawings of the super high water filling station in Jiulong Mine, the parameterized model of the main equipment in the filling station is established by using the drawing function of the SolidWorks software, and the model base of the whole system parameterized design is constructed on this basis. The parameterized design of high water filling equipment is carried out by using the method of series parts design table, and the standardized design of non standard equipment is realized. The software assembly function is used to simulate the construction process of the filling station, to find the potential design problems, and to put forward the corresponding solutions. Finally, the equipment assembly order of the whole system is determined, which plays a guiding role in practical engineering.
【學(xué)位授予單位】:河北工程大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TD823.7
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張建公;郭科偉;張步勤;王桂梅;;充填膏體制備及泵送監(jiān)控系統(tǒng)設(shè)計(jì)及應(yīng)用[J];煤炭科學(xué)技術(shù);2013年09期
2 賈凱軍;馮光明;李風(fēng)凱;;礦用超高水充填材料制漿系統(tǒng)研究與應(yīng)用[J];山東科技大學(xué)學(xué)報(bào)(自然科學(xué)版);2011年06期
3 馮光明;王成真;李鳳凱;賈凱軍;;超高水材料袋式充填開采研究[J];采礦與安全工程學(xué)報(bào);2011年04期
4 馮光明;孫春東;王成真;周振;;超高水材料采空區(qū)充填方法研究[J];煤炭學(xué)報(bào);2010年12期
5 馮光明;丁玉;朱紅菊;柏建彪;;礦用超高水充填材料及其結(jié)構(gòu)的實(shí)驗(yàn)研究[J];中國(guó)礦業(yè)大學(xué)學(xué)報(bào);2010年06期
6 石建新;;高水膨脹材料充填采煤技術(shù)的研究與應(yīng)用[J];山東煤炭科技;2010年04期
7 成龍;張奕黃;施洪生;;基于VB的SolidWorks標(biāo)準(zhǔn)件庫(kù)的二次開發(fā)與實(shí)例[J];微計(jì)算機(jī)信息;2010年10期
8 高武;;實(shí)施矸石膏體充填采煤的探索與實(shí)踐[J];中國(guó)煤炭;2009年10期
9 趙會(huì)芳;崇凱;姜旭升;郭德響;;基于SolidWorks夾具通用件的參數(shù)化設(shè)計(jì)及實(shí)現(xiàn)[J];機(jī)床與液壓;2009年08期
10 郭海利;陳松;;淺談鋼貯倉(cāng)結(jié)構(gòu)設(shè)計(jì)要點(diǎn)[J];山西建筑;2009年12期
,本文編號(hào):2263451
本文鏈接:http://sikaile.net/kejilunwen/kuangye/2263451.html