房柱式開采條件下上覆巖層活動規(guī)律及上行開采可行性研究
[Abstract]:In this paper, based on the background of the study on the actual geological conditions and early production conditions of the flourishing coal mine, the field investigation and practice are adopted in this paper. Theoretical analysis and numerical analysis are used to study the activity of overlying strata under the condition of roof pillar mining in the lower coal seam, and on the basis of this, the influence of roof pillar mining on the upper coal seam is analyzed. The feasibility of upstream mining is demonstrated. In order to analyze the influence of different roof pillar mining in the lower coal seam on the activity law of overburden strata, based on the actual production situation of coal mine, the paper applies the principle of orthogonal analysis to consider the mining width. The influence of main factors, such as retaining width, on the stability of coal pillar and the active deformation of overlying strata, the numerical simulation of mining and retention ratio, and the influence of two factors, such as mining width, on the roof pillar mining of coal seam 12, are discussed. On the basis of this, numerical simulation is carried out on the upper 9 coal seam by step excavation, and the mining and retention ratio in the upper coal seam is studied in the lower coal seam, the roof pillar mining and the upper coal seam up mining. The influence of mining width and other factors on the deformation of roof pillar and its overlying strata. The main research results are as follows: 1. When the mining retention ratio is in the range of 1 / 2 to 2, the mining width remains constant, and the larger the mining retention ratio, the easier the stress is to concentrate on the coal pillar, the worse the stability of the pillar, the less stable the pillar, the wider the mining width (the wider the coal pillar is left), the better the stability of the pillar is. Strong bearing capacity. In the mining process of upper coal seam, the influence of secondary mining will further affect the stability of coal pillar, which is affected by the leading supporting pressure, and the pillar in the state of ultimate stability is easy to collapse. 2. After the roof pillar mining in the lower coal seam, the stress forms alternating distribution between the "pressurized zone" and the "pressure relief zone", which causes the overburden strata to produce varying degrees of active deformation, and when the mining / retention ratio is within 1 / 2 to 2, the mining width remains unchanged and the mining / retention ratio is smaller. The more obvious the stress alternating distribution is, the easier the wave is in the wide mining, and the larger the mining width is, the more obvious the wave is. Under the influence of leading support pressure, the secondary mining of upper coal seam will further aggravate the alternating distribution and further develop the wave. 3. Through theoretical analysis and numerical simulation calculation, the fracture zone of No. 9 coal seam in Xingxing Coal Mine after mining in the lower coal seam can be formed on the balance rock layer without the staggered step. Coal seam No. 9 can be mined in the upper part of the roof pillar goaf of No. 12 coal seam.
【學(xué)位授予單位】:太原理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TD823
【參考文獻】
相關(guān)期刊論文 前10條
1 郭厚亮;;近距離煤層群采空區(qū)上覆煤層復(fù)采技術(shù)[J];礦業(yè)安全與環(huán)保;2008年S1期
2 王成;杜澤生;張念超;錢德雨;;上行開采頂板煤巷圍巖穩(wěn)定性控制技術(shù)研究[J];采礦與安全工程學(xué)報;2012年02期
3 郭倉;譚志祥;李培現(xiàn);鄧喀中;;基于FLAC~(3D)的條帶開采煤柱穩(wěn)定性分析[J];現(xiàn)代礦業(yè);2012年02期
4 馮國瑞;王鮮霞;康立勛;;A probe into“mining technique in the condition of floor failure”for coal seam above longwall goafs[J];Journal of Coal Science & Engineering(China);2008年01期
5 付武斌;鄧喀中;張立亞;;房柱式采空區(qū)煤柱穩(wěn)定性分析[J];煤礦安全;2011年01期
6 于文佳;蔣志剛;;近距離煤層群上行開采技術(shù)[J];煤礦安全;2011年10期
7 劉洋;;長壁留煤柱支撐法開采煤柱設(shè)計流程[J];煤礦開采;2008年02期
8 劉增平;;房柱式采空區(qū)上部煤層上行開采可行性分析[J];煤礦開采;2012年02期
9 劉飛;馬華;丁言露;;礦山壓力及巖層控制原理[J];煤礦現(xiàn)代化;2011年01期
10 程新明;復(fù)雜地質(zhì)條件下上行開采的研究與實踐[J];煤炭科學(xué)技術(shù);2004年01期
本文編號:2258041
本文鏈接:http://sikaile.net/kejilunwen/kuangye/2258041.html