大塔沖高濃度尾礦沉積規(guī)律及3號副壩穩(wěn)定性研究
本文選題:尾礦庫 + 高濃度; 參考:《昆明理工大學》2017年碩士論文
【摘要】:尾礦庫是礦山企業(yè)安全生產(chǎn)的重中之重,尾礦壩的穩(wěn)定狀況不僅僅關乎到礦山企業(yè)能否持續(xù)性生產(chǎn),也關系到周邊的生態(tài)環(huán)境,更關乎到下下游人民群眾生命財產(chǎn)安全。但是,隨著我國經(jīng)濟的飛速發(fā)展,采礦量也越來越多,采礦工業(yè)也得到了較大的發(fā)展,尾礦庫增容使用情況也越來越多。本文以大塔沖高濃度尾礦庫為研究對象,分析了堆積尾礦的沉積規(guī)律,運用有限元方法對尾礦庫不斷加高擴容的過程中的穩(wěn)定性進行分析,并運用不同的有限元軟件分析了尾礦庫不同工況下的二維、三維穩(wěn)定性,并得出以下幾點結論:(1)通過三次實驗數(shù)據(jù)對比分析,采用高濃度排礦方式時,堆積尾礦在固結程度、抗剪強度指標隨著時間變化都有提高的趨勢。(2)根據(jù)顆粒分析實驗數(shù)據(jù)可以得到大塔沖尾礦壩堆積尾礦顆粒粒徑較細,堆積尾礦主要是尾粉土,顆粒級配較好,堆積壩抗液化能力強。(3)根據(jù)實驗數(shù)據(jù)分析了大塔沖高濃度尾礦的沉積規(guī)律,在水平方向上和低濃度排礦方式的沉積規(guī)律相似;但是在垂直方向上采用高濃度排礦方式的沉積規(guī)律不太明顯。(4)運用MIDAS-GTS建立二維有限元模型,分析了不同工況下的浸潤線和堆積壩穩(wěn)定性。從結果可以看出,隨著壩體的加高,尾礦壩浸潤線增高,壩體安全系數(shù)下降。(5)運用MIDAS-GTS建立三維有限元模型,計算的浸潤線與二維計算的浸潤線幾乎相同。通過穩(wěn)定性分析的結果,當壩體加高7m、10.5m后正常時期的壩體可以滿足使用要求;但是,壩體加高7m、10.5m后洪水期的計算結果顯示不滿足使用要求,因此在尾礦壩使用過程中一定要注意壩體的排滲措施。
[Abstract]:Tailings reservoir is the most important part of safe production in mining enterprises. The stability of tailings dam is not only related to the sustainable production of mining enterprises, but also related to the surrounding ecological environment, but also to the safety of people's lives and property in the lower and lower reaches. However, with the rapid development of China's economy, the amount of mining is increasing, the mining industry has also been greatly developed, and the capacity and use of tailings reservoir has become more and more. This paper takes Data Chong high concentration tailings reservoir as the research object, analyzes the deposition law of the piled tailings, and analyzes the stability of the tailings reservoir during the process of increasing and expanding by using finite element method. The 2D and 3D stability of tailings under different working conditions is analyzed by using different finite element software. The following conclusions are drawn: (1) through the comparison and analysis of three times of experimental data, the consolidation degree of piled tailings is obtained when high concentration ore discharging method is adopted. The shear strength index has a tendency to increase with time. (2) according to the experimental data of particle analysis, it can be found that the particle size of Data Chong tailings dam is fine, the bulk tailings are mainly silt, and the particle gradation is better. (3) according to the experimental data, the deposition law of Data Chong high concentration tailings is analyzed, which is similar to that of low concentration discharge in horizontal direction. However, the deposition pattern of high concentration ore discharge in vertical direction is not obvious. (4) using MIDAS-GTS to establish a two-dimensional finite element model, the stability of infiltration line and stacking dam under different working conditions is analyzed. It can be seen from the results that with the increase of dam body, the seepage line of the tailings dam increases and the safety factor of the dam decreases. (5) using MIDAS-GTS to establish a three-dimensional finite element model, the calculated infiltration line is almost the same as that calculated in two dimensions. According to the results of stability analysis, the dam body in normal period can meet the requirements when the dam body is raised by 7 m or 10.5m, but the calculation results of flood water period after the height of 7 mm ~ (10. 5 m) show that the dam body does not meet the requirements of application. Therefore, it is necessary to pay attention to the seepage discharge measures during the use of tailings dam.
【學位授予單位】:昆明理工大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:TD926.4
【參考文獻】
相關期刊論文 前10條
1 劉超;劉文連;樊亞紅;;高濃度尾礦沉積規(guī)律研究[J];價值工程;2016年23期
2 趙德貴;陳小波;;高寒地區(qū)尾礦庫高濃度排放方式探索[J];包鋼科技;2014年06期
3 李瑞鴻;袁子有;李躍強;;尾礦高濃度堆存技術實踐[J];有色金屬(礦山部分);2014年01期
4 金佳旭;梁力;吳鳳元;郭文亮;董天文;;尾礦壩潰壩模擬及影響范圍預測[J];金屬礦山;2013年03期
5 陳建宏;鐘福生;楊珊;;基于有限元折減強度法與極限平衡法結合的巖質邊坡穩(wěn)定性分析[J];科技導報;2012年11期
6 張家明;徐則民;劉文連;;階梯地形對西昌昔格達組三維地基地震動影響[J];武漢理工大學學報(交通科學與工程版);2012年02期
7 敬小非;尹光志;魏作安;李小雙;王孟來;;尾礦壩垮塌機制與潰決模式試驗研究[J];巖土力學;2011年05期
8 尹光志;敬小非;魏作安;李小雙;蔣長寶;;尾礦壩潰壩相似模擬試驗研究[J];巖石力學與工程學報;2010年S2期
9 王向陽;楊浩基;林伊;;壩前稀釋解決高濃度尾礦堆壩的研究與應用[J];科技信息;2010年15期
10 孟俊倉;費維水;楊建江;劉文連;張壽云;周洋洋;;庫水位對尾礦壩體穩(wěn)定性影響的研究[J];科學技術與工程;2010年12期
相關會議論文 前1條
1 趙德貴;楊雪芳;張丹;;絮凝劑在膏體濃縮機中的實際應用[A];第四屆全國尾礦庫安全運行技術高峰論壇論文集[C];2011年
相關博士學位論文 前1條
1 郭振世;高堆尾礦壩穩(wěn)定性分析及加固關鍵技術研究[D];西安理工大學;2010年
相關碩士學位論文 前7條
1 肖霄;考慮滲透力的作用下尾礦壩穩(wěn)定性研究[D];昆明理工大學;2014年
2 董鳳強;滲流對尾礦壩穩(wěn)定性影響的分析[D];昆明理工大學;2011年
3 馬舒琪;用拱壩作尾礦庫初期壩的研究[D];昆明理工大學;2011年
4 易麗平;尾礦壩滲流穩(wěn)定性分析及監(jiān)測技術研究[D];中南大學;2010年
5 王世鵬;中小型尾礦庫壩體失穩(wěn)的危險源辨識[D];中南大學;2008年
6 王文星;尾礦壩穩(wěn)定性分析及安全對策的研究[D];中南大學;2007年
7 路美麗;尾礦壩滲流場的數(shù)值模擬及分析[D];大連理工大學;2002年
,本文編號:2115544
本文鏈接:http://sikaile.net/kejilunwen/kuangye/2115544.html