元寶山露天礦卡車外排土場(chǎng)參數(shù)及建設(shè)發(fā)展程序優(yōu)化
本文選題:露天礦 + 卡車外排土場(chǎng)。 參考:《遼寧工程技術(shù)大學(xué)》2015年碩士論文
【摘要】:排土場(chǎng)參數(shù)及建設(shè)發(fā)展程序是影響露天礦排土工程安全和排土成本的重要因素,優(yōu)化排土參數(shù)和排土程序?qū)μ岣呗短斓V經(jīng)濟(jì)效益、確保安全生產(chǎn)具有重要意義。元寶山露天礦改河期間,為盡快實(shí)現(xiàn)內(nèi)排,加速降深,導(dǎo)致剝采比增加,現(xiàn)有排土機(jī)能力不足,急需建立新的卡車外排土場(chǎng),確保排土工程平穩(wěn)接續(xù)。本文采用技術(shù)經(jīng)濟(jì)比較法,選擇排土場(chǎng)合理位置;采用剛體極限平衡法,確定排土場(chǎng)穩(wěn)定幫坡角及最終排棄標(biāo)高;以排土場(chǎng)剝離運(yùn)輸功最小為目標(biāo),建立排土段高優(yōu)化模型,以排土總費(fèi)用現(xiàn)值最小為目標(biāo),建立排土程序優(yōu)化模型,優(yōu)化元寶山露天礦卡車外排土場(chǎng)參數(shù)及建設(shè)發(fā)展程序。本文研究成果可降低元寶露天礦生產(chǎn)成本、提高經(jīng)濟(jì)效益,確保改河期間排土工程平穩(wěn)接續(xù)。
[Abstract]:The parameters of dump and the procedure of construction and development are the important factors affecting the safety and cost of draining in open-pit mine. It is of great significance to optimize the parameters and procedures for improving the economic benefit and ensuring safe production of open-pit mine. During the reform period of Yuanbaoshan opencast mine, in order to realize the inner drainage as soon as possible, accelerate the depth reduction, lead to the increase of the stripping ratio, and the capacity of the existing dump machine is insufficient, it is urgent to establish a new dump outside the truck to ensure the smooth succession of the dumping project. In this paper, the reasonable position of the dump is chosen by the method of technical and economic comparison, the stable slope angle of the dump and the final dumping elevation are determined by the rigid body limit equilibrium method, and the optimal model of the dump height is established with the aim of minimizing the stripping and transporting work of the dump, and using the method of rigid body limit equilibrium to determine the slope angle of the dump and the final dumping elevation. With the aim of minimizing the present value of the total cost of dumping, an optimization model of dumping procedure is established to optimize the parameters of the dump outside the truck in Yuanbaoshan opencast mine and the construction and development program. The research results of this paper can reduce the production cost of Yuanbao opencast mine, improve the economic benefit and ensure the smooth succession of the draining project during the period of river diversion.
【學(xué)位授予單位】:遼寧工程技術(shù)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TD824.8
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 白潤(rùn)才;吳東海;劉光偉;曹博;白羽;;元寶山露天礦改河期間剝采工程接續(xù)方式[J];金屬礦山;2015年01期
2 蔡利平;李鋼;史文中;;增地節(jié)地型露天礦排土場(chǎng)優(yōu)化設(shè)計(jì)[J];煤炭學(xué)報(bào);2013年12期
3 劉光偉;白潤(rùn)才;付恩三;;SMCAD礦業(yè)工程軟件在露天煤礦的應(yīng)用[J];露天采礦技術(shù);2013年01期
4 周杰;馬丕梁;李紹臣;李偉;馬明;;黃土基底排土場(chǎng)排土參數(shù)的優(yōu)化[J];煤礦安全;2012年09期
5 陳光輝;李夕兵;董隴軍;李地元;劉新穎;;排土場(chǎng)與爆破荷載共同作用下的露天礦邊坡穩(wěn)定性分析[J];中國安全科學(xué)學(xué)報(bào);2012年05期
6 王培武;;露天礦排土場(chǎng)堆排方式探析[J];黃金;2012年01期
7 趙紅澤;張瑞新;秦建明;甄選;;安家?guī)X露天煤礦運(yùn)煤卡車通道水平優(yōu)化研究[J];中國礦業(yè)大學(xué)學(xué)報(bào);2011年06期
8 汪海濱;李小春;米子軍;白俊;王少泉;;排土場(chǎng)空間效應(yīng)及其穩(wěn)定性評(píng)價(jià)方法研究[J];巖石力學(xué)與工程學(xué)報(bào);2011年10期
9 韓流;舒繼森;孔雀;葛嘉婧;呂金星;;車輛荷載作用下的露天礦排土場(chǎng)穩(wěn)定性分析[J];礦山機(jī)械;2011年10期
10 石建勛;劉新榮;廖紹波;劉少煒;;礦區(qū)排土場(chǎng)堆載對(duì)邊坡穩(wěn)定性影響的分析[J];采礦與安全工程學(xué)報(bào);2011年02期
,本文編號(hào):1958594
本文鏈接:http://sikaile.net/kejilunwen/kuangye/1958594.html