千米深井厚煤層開采的沖擊地壓危險性評價及卸壓技術研究
本文選題:沖擊地壓 + 危險性評價; 參考:《河北工程大學》2015年碩士論文
【摘要】:針對千米采深厚煤層的107工作面所面臨的沖擊地壓問題,本文依據(jù)滕東煤礦的地質構造及生產(chǎn)實際情況,在利用多因素分析法、數(shù)值模擬方法、比較分析法及微地震監(jiān)測技術等研究方法的基礎上,對有沖擊地壓危險性工作面進行前期的危險性評價和后期的防治技術研究,構建出一套適應于深井厚煤層的綜合防治沖擊地壓技術。首先,分別采用綜合指數(shù)法和可能性指數(shù)評價法評價其工作面發(fā)生沖擊地壓危險性的可能性,再利用多因素耦合的評價方法,分別對存在于107工作面的各個沖擊地壓影響因素的影響性進行分析,并劃分出工作面相應的危險區(qū)域的范圍及其危險程度的大小。其次,利用FLAC3D的數(shù)值模擬的方法建立107工作面的數(shù)值模型,研究其巷道布置前后和回采過程中應力的分布范圍和集中情況,旨在分析工作面回采過程中采動影響而導致的上部巖層變化情況,并研究其應力集中區(qū)域和數(shù)值大小的變化規(guī)律,為后期采取相應的防治措施提供參考。再次,采用比較分析的方法,依據(jù)工作面地質條件、回采技術和礦井實際情況,選擇采用大直徑鉆孔卸壓的防治沖擊地壓方法,并建立相應的數(shù)值模型,優(yōu)化出適合107工作面使用的鉆孔直徑、排間距和布置方式等技術參數(shù),進行合理化的布置,并采用鉆屑法驗證卸壓措施實施后的效果。最后,在回采過程中采用微震監(jiān)測的方法對“微震事件”進行監(jiān)測,并依據(jù)事件發(fā)生的范圍、數(shù)量及其能量,對107工作面可能發(fā)生的危險做到預警,并同時對前期的危險性評價結果進行驗證。
[Abstract]:According to the geological structure and actual production situation of Tendong Coal Mine, this paper makes use of multi-factor analysis method and numerical simulation method in view of the impact ground pressure problem faced by 107 working face in deep coal seam in kilometer mining, according to the geological structure and actual production situation of Tendong Coal Mine. On the basis of comparative analysis method and micro-seismic monitoring technology, the pre-risk evaluation and prevention technology of percussive face with rock burst are studied. A set of integrated rock burst prevention and control technology suitable for deep well thick coal seam was constructed. Firstly, comprehensive index method and possibility index method are used to evaluate the possibility of rock burst hazard in working face, and then multi-factor coupling evaluation method is used. The influencing factors of impact ground pressure in 107 working face are analyzed, and the range of the corresponding dangerous area and the magnitude of the dangerous degree of the working face are divided. Secondly, the numerical model of 107-face is established by using FLAC3D's numerical simulation method, and the distribution and concentration of stress before and after the roadway layout and in the mining process are studied. The purpose of this paper is to analyze the change of the upper strata caused by the influence of mining movement in the mining process of the working face, and to study the variation law of the stress concentration area and the numerical value, and to provide a reference for taking the corresponding prevention measures in the later stage. Thirdly, adopting the method of comparative analysis, according to the geological condition of working face, mining technology and the actual situation of mine, the method of preventing and controlling the impact ground pressure is selected and the corresponding numerical model is established. The technical parameters of drilling hole diameter, row spacing and layout mode suitable for 107 working face were optimized, and reasonable arrangement was carried out, and the effect of pressure relief measures was verified by drilling cuttings method. Finally, the microseismic monitoring method is used to monitor the "microseismic events" in the process of mining, and according to the range, quantity and energy of the events, the danger that may occur in the 107 working face can be forewarned. At the same time, the risk assessment results are verified.
【學位授予單位】:河北工程大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TD324
【參考文獻】
相關期刊論文 前10條
1 朱斯陶;姜福興;史先鋒;孫廣京;張志高;程祥萌;張浩;;防沖鉆孔參數(shù)確定的能量耗散指數(shù)法[J];巖土力學;2015年08期
2 顧合龍;王文;林東;;電磁輻射在沖擊地壓預測預報中的應用[J];煤炭技術;2015年08期
3 竇林名;鞏思園;劉鵬;丁恩杰;華鋼;何江;劉鵬;;礦震沖擊災害遠程在線預警平臺[J];煤炭科學技術;2015年06期
4 姜福興;姚順利;魏全德;張立明;王顏亮;;礦震誘發(fā)型沖擊地壓臨場預警機制及應用研究[J];巖石力學與工程學報;2015年S1期
5 齊慶新;歐陽振華;趙善坤;李宏艷;李曉璐;張寧博;;我國沖擊地壓礦井類型及防治方法研究[J];煤炭科學技術;2014年10期
6 姜福興;尹永明;朱權潔;李舒霞;于正興;;單事件多通道微震波形的特征提取與聯(lián)合識別研究[J];煤炭學報;2014年02期
7 楊月;潘一山;羅浩;李忠華;徐軍;;大直徑煤層鉆孔注水壓裂防治沖擊地壓數(shù)值模擬[J];遼寧工程技術大學學報(自然科學版);2014年04期
8 姜福興;尹永明;朱權潔;溫經(jīng)林;;基于微震監(jiān)測的千米深井厚煤層綜放面支架圍巖關系研究[J];采礦與安全工程學報;2014年02期
9 陳峰;潘一山;李忠華;王愛文;徐連滿;;利用鉆屑法對卸壓鉆孔措施效果的分析評價[J];巖土工程學報;2013年S2期
10 潘俊鋒;毛德兵;藍航;王書文;齊慶新;;我國煤礦沖擊地壓防治技術研究現(xiàn)狀及展望[J];煤炭科學技術;2013年06期
相關會議論文 前1條
1 候志鷹;;用鉆孔卸壓法解除煤柱沖擊地壓危險[A];礦山堅硬巖體控制學術討論會論文集[C];1991年