大柳塔礦區(qū)分布式地下水庫數(shù)值模擬及優(yōu)化調(diào)度
本文關(guān)鍵詞: 分布式地下水庫 庫容~水位關(guān)系曲線 涌水量 聯(lián)合調(diào)度 優(yōu)化調(diào)度 出處:《清華大學(xué)》2015年碩士論文 論文類型:學(xué)位論文
【摘要】:晉陜蒙寧甘地區(qū),富集了全國65%的煤炭;但是,該地區(qū)僅占有全國3.9%的水資源量。水資源匱乏,已經(jīng)成為該地區(qū)可持續(xù)發(fā)展的主要限制因素。針對水資源不足與生產(chǎn)發(fā)展的矛盾,神東集團(tuán)創(chuàng)新采用分布式地下水庫工程,將采煤礦井涌水儲(chǔ)存于彼此聯(lián)通的采空巷道及上三帶巖體中的空隙空間里,同時(shí)完成凈化和循環(huán)使用。為實(shí)現(xiàn)地下水庫水資源的合理高效利用,需建立地下水庫數(shù)值模擬與優(yōu)化調(diào)度方法,這是本文研究的核心。本文取得以下成果:(1)確定水庫庫容~水位關(guān)系曲線,這是地下水庫水資源規(guī)劃研究的基礎(chǔ)。按照分層累積方法采用0V??V公式,并借助Excel軟件中的查找函數(shù),確定分布式地下水庫的庫容~水位關(guān)系曲線。蓄水位達(dá)7m時(shí),對應(yīng)的計(jì)算庫容為235.18×104 m3,與實(shí)測數(shù)據(jù)約為230×104 m3基本吻合。(2)建立地下水庫的地下水?dāng)?shù)值模擬模型,預(yù)測礦區(qū)的涌水量,為聯(lián)合調(diào)度提供基礎(chǔ)數(shù)據(jù)。借助GMS軟件的MODFLOW模塊工具,建立了分布式地下水庫的數(shù)值模擬模型,先根據(jù)已有多年日均涌水量、多年日均降雨量反推水力傳導(dǎo)系數(shù),再進(jìn)行多年各月份日均涌水量的預(yù)測。接著,根據(jù)2008~2012年的實(shí)測涌水量數(shù)據(jù),構(gòu)建GM(1,1)數(shù)學(xué)模型預(yù)測2013~2020年間的礦區(qū)涌水量以進(jìn)行校對。對比兩種模型的預(yù)測結(jié)果,結(jié)合實(shí)際數(shù)據(jù)進(jìn)行修正,得出礦區(qū)多年各月的日均涌水量。(3)進(jìn)行地下水庫的聯(lián)合調(diào)度調(diào)試,得出合理的水庫日均可調(diào)水量,為礦區(qū)水量優(yōu)化調(diào)度提供數(shù)據(jù)。根據(jù)礦區(qū)的涌水量,進(jìn)行地下水庫的聯(lián)合調(diào)度調(diào)試,目標(biāo)是“經(jīng)過一個(gè)水文年水庫水位又恢復(fù)到起調(diào)水位”,得出確保地下水庫水位穩(wěn)定條件下可以日均供應(yīng)水量為11058 m3/d。分析調(diào)試結(jié)果,當(dāng)?shù)V區(qū)涌水高峰時(shí),各水庫的水位變化整體來看不劇烈,說明水庫的蓄水能力較強(qiáng)。(4)根據(jù)礦區(qū)的用水需求,按照供水量最少、成本最低的原則,運(yùn)用matlab中的linprog函數(shù)進(jìn)行整個(gè)礦區(qū)范圍內(nèi)的優(yōu)化調(diào)度。分析礦區(qū)水量供需關(guān)系,依據(jù)11058 m3/d調(diào)度安排地下水庫的水資源,少量凈化為生活用水,大部分處理后用于生產(chǎn)和工業(yè)方面,部分滿足生態(tài)用水;生活不足部分的水量,則由聯(lián)網(wǎng)自來水進(jìn)行補(bǔ)充。2015年~2020年需要從聯(lián)網(wǎng)自來水中調(diào)用的水量,分別為640 m3、929 m3、1191 m3、1574 m3、1796 m3、2039 m3。
[Abstract]:The Shanxi, Shaanxi, Mengning, Gansu and Gansu regions are rich in 65% of the country's coal; however, the region accounts for only 3.9% of the country's water resources. It has become the main limiting factor of sustainable development in this area. In view of the contradiction between water shortage and production development, Shendong Group innovates in adopting distributed underground reservoir project. In order to realize the rational and efficient utilization of groundwater resources of underground reservoir, coal mine gushing water is stored in the interlinked mined-out roadway and the void space in the rock mass of the upper third belt. It is necessary to establish numerical simulation and optimal operation method of underground reservoir, which is the core of this paper. In this paper, the following results are obtained: 1) the relation curve between reservoir capacity and water level is determined. This is the foundation of groundwater resources planning and research. ? V formula, and with the help of the search function in Excel software, the relation curve between storage capacity and water level of distributed underground reservoir is determined. The corresponding calculated reservoir capacity is 235.18 脳 104m3, which is basically consistent with the measured data of 230 脳 104m3.) the numerical simulation model of underground reservoir is established to predict the inflow of water in the mining area and to provide basic data for joint operation. With the help of the MODFLOW module tool of GMS software, the numerical simulation model of underground water is established. A numerical simulation model of distributed underground reservoir is established. First, according to the annual average daily water inflow and the average daily rainfall, the hydraulic conductivity coefficient is inversely pushed, and then the daily average water inflow is forecasted for many years and months. Based on the measured water discharge data from 2008 to 2012, a mathematical model is constructed to predict the water inflow in mining area from 2013 to 2020 for proofreading. The results of the two models are compared and corrected with the actual data. It is concluded that the daily average water inflow of each month for many years in the mining area is adjusted jointly with the underground reservoir, and the reasonable daily water quantity of the reservoir can be adjusted, which provides the data for the optimal regulation of the water quantity in the mining area, according to the water discharge of the mining area, The goal of joint operation and adjustment of underground reservoir is to "restore the water level to the starting and adjusting water level after a hydrological year", and get the average daily water supply of 11058 m3 / d under the condition that the groundwater level is stable. When the water gushing peak in mining area, the change of water level of each reservoir is not sharp on the whole, which shows that the water storage capacity of the reservoir is strong. (4) according to the water demand of mining area, according to the principle of minimum water supply and lowest cost, The linprog function in matlab is used to optimize the operation of the whole mining area. The relationship between supply and demand of water in mining area is analyzed. According to the 11058 m3 / d regulation, the water resources of underground reservoir are arranged, a small amount of water is purified into domestic water, and most of the treatment is used in production and industry. The amount of water needed to be transferred from the connected tap water from 2015 to 2020 is 640m ~ (3n) 929 m ~ (3) ~ 1191 m ~ (3) N ~ (1 191) m ~ (374) ~ 1 796 m ~ (3) C ~ (3) ~ (3) ~ 2 039 m ~ (3), respectively.
【學(xué)位授予單位】:清華大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TD74
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李寶蘭;楊紹南;;遼寧省第四系地下水庫勘察規(guī)劃[J];安全與環(huán)境工程;2009年01期
2 關(guān)延?xùn)|;;地下水庫在濱海地區(qū)水資源可持續(xù)利用中的應(yīng)用分析[J];西部探礦工程;2009年12期
3 杜尚海;蘇小四;呂航;何迪;;滹沱河地下水庫有效蓄水率研究[J];湖南科技大學(xué)學(xué)報(bào)(自然科學(xué)版);2010年01期
4 張林泉;姜文明;;遙感信息復(fù)合技術(shù)在黃水河地下水庫證論中的應(yīng)用[J];遙感技術(shù)與應(yīng)用;1991年02期
5 田原;魏守忠;;對天山山前地下水庫開發(fā)利用的認(rèn)識[J];地質(zhì)災(zāi)害與環(huán)境保護(hù);2008年04期
6 崔向新,何京麗,,王琪;充分利用呼和浩特市地下水庫加強(qiáng)旱澇洪堿綜合治理[J];內(nèi)蒙古農(nóng)牧學(xué)院學(xué)報(bào);1995年02期
7 李志杰,劉瑩;大連市龍河地下水庫施工流程優(yōu)化和安全保證分析[J];西部探礦工程;2005年05期
8 李濤;郭琳;李輝;刁輝;;臺蘭河山前水文地質(zhì)特征及地下水庫可行性分析[J];資源環(huán)境與工程;2011年05期
9 海來提·卡得爾;李濤;裴建生;;新疆臺蘭河地下水庫大流量抽水試驗(yàn)及參數(shù)計(jì)算[J];西部探礦工程;2012年05期
10 張勇;;基于層次分析法的滹沱河地下水庫脆弱性評價(jià)[J];化學(xué)工程與裝備;2013年04期
相關(guān)會(huì)議論文 前10條
1 李旺林;殷宗澤;;地下水庫的認(rèn)識和實(shí)踐[A];2004年水工專委會(huì)學(xué)術(shù)交流會(huì)議學(xué)術(shù)論文集[C];2004年
2 向華龍;;論天然地下水庫的開發(fā)和利用[A];中國水利學(xué)會(huì)2003學(xué)術(shù)年會(huì)論文集[C];2003年
3 李旺林;束龍倉;殷宗澤;;地下水庫設(shè)計(jì)理論初探[A];中國水利學(xué)會(huì)第二屆青年科技論壇論文集[C];2005年
4 楊正華;;地下水庫的建設(shè)與管理[A];水工滲流研究與應(yīng)用進(jìn)展——第五屆全國水利工程滲流學(xué)術(shù)研討會(huì)論文集[C];2006年
5 王蕓生;許貴森;譚龍章;;論天津市北部碳酸鹽巖地區(qū)修建地下水庫的可行性[A];中國地質(zhì)科學(xué)院文集(11)[C];1985年
6 王英得;;新疆石河子南山洼地地下水庫及開發(fā)利用建議[A];新疆水利學(xué)會(huì)獲獎(jiǎng)?wù)撐募?989-1998)[C];1999年
7 王邦賢;呂志濤;;利用地下水庫聯(lián)合調(diào)蓄水資源方案探討[A];河南地球科學(xué)通報(bào)2011年卷(下冊)[C];2011年
8 李守才;謝清蓮;;使水資源就地循環(huán)的新型地下水庫的構(gòu)思[A];2002年中國西北部重大工程地質(zhì)問題論壇論文集[C];2002年
9 沈兆武;皮愛如;周聽清;胡秀章;;地下水庫爆炸成形的實(shí)驗(yàn)研究[A];力學(xué)與西部開發(fā)會(huì)議論文集[C];2001年
10 王志華;韓永濤;;建設(shè)滹沱河沖洪積扇區(qū)地下水庫研究[A];中國水利學(xué)會(huì)第四屆青年科技論壇論文集[C];2008年
相關(guān)重要報(bào)紙文章 前10條
1 記者 馬俊;寧夏建設(shè)首座地下水庫[N];人民日報(bào)海外版;2009年
2 記者 達(dá)娃·梅朵;云南首個(gè)地下水庫年底開建[N];昆明日報(bào);2010年
3 本報(bào)記者 趙石星;“地下漏斗”將變身地下水庫[N];石家莊日報(bào);2012年
4 記者 趙石星;我市將在滹沱河上游建地下水庫[N];石家莊日報(bào);2012年
5 記者 郭軍 通訊員 王劍;我省啟動(dòng)地下水庫關(guān)鍵技術(shù)研究[N];陜西日報(bào);2014年
6 王建國 李國宏;重視無污染地下水庫建設(shè)[N];中國礦業(yè)報(bào);2004年
7 全國人大環(huán)資委委員原地質(zhì)礦產(chǎn)部副部長 張宏仁;關(guān)于 “地下水庫”[N];中國水利報(bào);2002年
8 本報(bào)記者 鄭北鷹;地下水庫——緩解缺水的新設(shè)施[N];光明日報(bào);2002年
9 王佳航;北方城市是否都需建地下水庫?[N];經(jīng)濟(jì)日報(bào);2002年
10 通訊員 張玉偉;老龍口地下水庫勘探工作啟動(dòng)[N];阿克蘇日報(bào);2007年
相關(guān)博士學(xué)位論文 前3條
1 戴長雷;地下水庫調(diào)控研究[D];吉林大學(xué);2006年
2 李治軍;北方沿海小流域河谷型地下水庫最優(yōu)庫容研究[D];吉林大學(xué);2008年
3 李旺林;松散介質(zhì)地下水庫設(shè)計(jì)理論研究[D];河海大學(xué);2006年
相關(guān)碩士學(xué)位論文 前10條
1 劉金玉;三澗堡地下水庫對地下水環(huán)境影響的研究[D];大連理工大學(xué);2015年
2 高巖堂;大柳塔礦區(qū)分布式地下水庫數(shù)值模擬及優(yōu)化調(diào)度[D];清華大學(xué);2015年
3 李鳳
本文編號:1504007