兆瓦級(jí)風(fēng)電齒輪箱故障監(jiān)測(cè)及分析
[Abstract]:China's wind power enterprises are working to realize the localization of megawatt-level wind power generation equipment, and promote the large-scale commercial development of the megawatt-level wind power generation technology in our country. As the core component of the megawatt-level wind power unit, the gear box plays an important role in the quality of the unit, The equipment casualty accident is of great significance. Based on the vibration diagnosis and the oil analysis, this paper makes a research on the fault monitoring and analysis of the megawatt-level wind power gearbox First of all, this paper discusses the research background of the performance of megawatt-level wind power gearbox, the present situation and the purpose and significance of the research, and then analyzes the common faults of the megawatt-level wind power gearbox, and sums up the mechanism of the vibration noise of the gear box and the meter of the meshing frequency. The evaluation index of the vibration noise and the standard for the detection of the gear box are established, and the theoretical basis for the selection, installation and failure analysis of the vibration monitoring system of the gear box is provided; and the integrated wind power gearbox on-line oil monitoring system detection means is also introduced. The system structure and basic parameters, mechanical structure and installation test requirements are required; at the same time, the vibration monitoring device of the megawatt-level wind power gearbox is selected, the characteristics of the device are analyzed, and the whole monitoring system is installed on the wind generating set to be tested Test. Make a small oil-way mechanism, and use the manual method to prepare different oil samples for testing. According to the three aspects of accuracy, repeatability and linearity, the comparative analysis of the collected data is carried out, so as to judge the reliability and accuracy of the system, and it is now installed to the accompanying gear box of the whole machine test stand of the wind power unit to carry out on-line measurement. Finally, the characteristics of the research on the fault detection system of the megawatt-level wind power gearbox and the preparation for the large-scale engineering application are analyzed, and the follow-up research work is provided. The on-line monitoring system for megawatt-level wind power gearbox in China is still in the experimental research stage and is really used in engineering practice. The research on the basic theory of the on-line monitoring system of the fault on-line monitoring system of the megawatt-level wind power gearbox, the active R & D monitoring sensor, the test equipment and the comprehensive information processing and analysis system are still the future oil monitoring research
【學(xué)位授予單位】:山東大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2012
【分類(lèi)號(hào)】:TM614;TH165.3
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;兆瓦級(jí)風(fēng)力發(fā)電機(jī)即將誕生[J];上海大中型電機(jī);2003年02期
2 楚崢;楊宏坤;劉吉輝;;兆瓦級(jí)風(fēng)力發(fā)電機(jī)組的安全策略[J];能源技術(shù);2009年01期
3 ;美國(guó)兆瓦級(jí)激光器試驗(yàn)取得重大進(jìn)展[J];航天工業(yè)管理;2000年06期
4 ;美軍開(kāi)發(fā)兆瓦級(jí)SiC新型固態(tài)電路功率開(kāi)關(guān)[J];電子對(duì)抗技術(shù);2002年06期
5 ;“兆瓦級(jí)垂直軸風(fēng)力發(fā)電機(jī)組研制項(xiàng)目系統(tǒng)參數(shù)優(yōu)化專題”項(xiàng)目通過(guò)國(guó)家發(fā)改委的中間評(píng)審[J];電力建設(shè);2008年08期
6 ;瓦軸百萬(wàn)獎(jiǎng)金重獎(jiǎng)科技創(chuàng)新者[J];機(jī)械工程師;2010年07期
7 ;稀土永磁兆瓦級(jí)風(fēng)力發(fā)電機(jī)組項(xiàng)目獲“2007年科技創(chuàng)新引導(dǎo)獎(jiǎng)勵(lì)資金”[J];稀土信息;2008年03期
8 宋加佳;晏紅文;郭知彼;;基于ANSYS的兆瓦級(jí)風(fēng)力發(fā)電機(jī)組機(jī)艙罩分析仿真[J];CAD/CAM與制造業(yè)信息化;2010年07期
9 劉勇;;兆瓦級(jí)風(fēng)力發(fā)電機(jī)組變槳距控制系統(tǒng)研究[J];電子技術(shù);2009年01期
10 楊磊;麥云飛;;兆瓦級(jí)風(fēng)力發(fā)電機(jī)組葉片設(shè)計(jì)[J];通用機(jī)械;2009年11期
相關(guān)會(huì)議論文 前10條
1 張占一;劉棟;應(yīng)懷樵;楊金福;;某兆瓦級(jí)發(fā)電機(jī)組噪聲故障分析[A];現(xiàn)代振動(dòng)與噪聲技術(shù)(第九卷)[C];2011年
2 王曉華;張興;;基于INTERBUS總線的兆瓦級(jí)風(fēng)電控制系統(tǒng)設(shè)計(jì)[A];全國(guó)第20屆計(jì)算機(jī)技術(shù)與應(yīng)用學(xué)術(shù)會(huì)議(CACIS·2009)暨全國(guó)第1屆安全關(guān)鍵技術(shù)與應(yīng)用學(xué)術(shù)會(huì)議論文集(下冊(cè))[C];2009年
3 陳澄;;UPR在兆瓦級(jí)風(fēng)電機(jī)機(jī)艙罩成型中的應(yīng)用[A];第四屆玻璃鋼復(fù)合材料市場(chǎng)和技術(shù)發(fā)展高層論壇論文集[C];2010年
4 高亞兵;王德文;彭瑞云;陳浩宇;楊紅;鄧樺;曹曉哲;王水明;趙梅蘭;崔雪梅;崔玉芳;陳建魁;;脈沖式兆瓦級(jí)高功率微波照射后狗某些生化指標(biāo)的改變[A];第五屆全國(guó)生物醫(yī)學(xué)體視學(xué)學(xué)術(shù)會(huì)議、第八屆全軍軍事病理學(xué)學(xué)術(shù)會(huì)議、第四屆全軍定量病理學(xué)學(xué)術(shù)會(huì)議論文匯編[C];2002年
5 袁包鋼;戴瑩;朱江平;;兆瓦級(jí)風(fēng)機(jī)主齒輪箱行星架的有限元分析[A];21世紀(jì)太陽(yáng)能新技術(shù)——2003年中國(guó)太陽(yáng)能學(xué)會(huì)學(xué)術(shù)年會(huì)論文集[C];2003年
6 肖加余;曾竟成;楊孚標(biāo);彭超義;楊軍;唐先賀;潘藝;曾鴻平;;兆瓦級(jí)復(fù)合材料風(fēng)電葉片的設(shè)計(jì)與制備研究[A];2009年度全國(guó)復(fù)合材料力學(xué)研討會(huì)論文集[C];2009年
7 周娟;馮學(xué)斌;彭超義;曾竟成;肖加余;;兆瓦級(jí)風(fēng)機(jī)葉片復(fù)合材料發(fā)展現(xiàn)狀[A];復(fù)合材料:創(chuàng)新與可持續(xù)發(fā)展(下冊(cè))[C];2010年
8 劉學(xué)忠;鐘力生;;兆瓦級(jí)風(fēng)力發(fā)電機(jī)絕緣的重復(fù)脈沖電老化壽命評(píng)定方法[A];2011中國(guó)電工技術(shù)學(xué)會(huì)學(xué)術(shù)年會(huì)論文集[C];2011年
9 鈕得祿;;兆瓦級(jí),S波段,超寬帶雙信道輸出回路的研究[A];中國(guó)電子學(xué)會(huì)第七屆學(xué)術(shù)年會(huì)論文集[C];2001年
10 吳世展;;兆瓦級(jí)雙饋風(fēng)力發(fā)電機(jī)設(shè)計(jì)[A];重慶市電機(jī)工程學(xué)會(huì)2010年學(xué)術(shù)會(huì)議論文集[C];2010年
相關(guān)重要報(bào)紙文章 前10條
1 記者 李江濤 通訊員 張現(xiàn)利;我市3個(gè)省重大科技專項(xiàng)通過(guò)驗(yàn)收[N];洛陽(yáng)日?qǐng)?bào);2011年
2 記者 周月桂邋通訊員 周卓;湘電向風(fēng)電領(lǐng)軍企業(yè)邁進(jìn)[N];湖南日?qǐng)?bào);2008年
3 班健;打破國(guó)外風(fēng)機(jī)的壟斷地位[N];中國(guó)環(huán)境報(bào);2007年
4 申銀萬(wàn)國(guó);金風(fēng)科技(002202) 向下空間明顯大于投資機(jī)會(huì)[N];上海證券報(bào);2008年
5 記者 姚雯;國(guó)內(nèi)最大兆瓦級(jí)太陽(yáng)能電站在上海試運(yùn)行[N];中國(guó)高新技術(shù)產(chǎn)業(yè)導(dǎo)報(bào);2007年
6 劉昆明;追逐風(fēng)電業(yè)的誘人蛋糕[N];證券時(shí)報(bào);2007年
7 通訊員 仲文玉 記者 徐黎一;港城風(fēng)力發(fā)電葉片首次出口[N];連云港日?qǐng)?bào);2008年
8 張和平;1.5兆瓦風(fēng)電機(jī)組問(wèn)世[N];科技日?qǐng)?bào);2006年
9 徐瑞哲;太陽(yáng)能發(fā)電不再自成“孤島”[N];解放日?qǐng)?bào);2008年
10 任荃;無(wú)污染“電力銀行”在滬問(wèn)世[N];文匯報(bào);2008年
相關(guān)博士學(xué)位論文 前10條
1 單光坤;兆瓦級(jí)風(fēng)電機(jī)組狀態(tài)監(jiān)測(cè)及故障診斷研究[D];沈陽(yáng)工業(yè)大學(xué);2011年
2 趙丹平;風(fēng)力發(fā)電機(jī)組葉片模型氣動(dòng)載荷研究[D];內(nèi)蒙古農(nóng)業(yè)大學(xué);2009年
3 徐寶清;水平軸風(fēng)力發(fā)電機(jī)組風(fēng)輪葉片優(yōu)化設(shè)計(jì)研究[D];內(nèi)蒙古農(nóng)業(yè)大學(xué);2010年
4 郭洪澈;兆瓦級(jí)風(fēng)力發(fā)電機(jī)組變槳距系統(tǒng)控制技術(shù)研究[D];沈陽(yáng)工業(yè)大學(xué);2008年
5 吳宏鋼;風(fēng)力發(fā)電機(jī)組振動(dòng)檢測(cè)及噪聲評(píng)估研究[D];重慶大學(xué);2010年
6 張凱;兆瓦級(jí)Darrieus型立軸式風(fēng)力機(jī)氣動(dòng)性能評(píng)價(jià)和結(jié)構(gòu)動(dòng)特性研究[D];重慶大學(xué);2010年
7 劉軍;風(fēng)力發(fā)電機(jī)組控制策略優(yōu)化與實(shí)驗(yàn)平臺(tái)研究[D];重慶大學(xué);2011年
8 李俊;大型風(fēng)電機(jī)組整機(jī)及關(guān)鍵部件仿真分析與優(yōu)化設(shè)計(jì)研究[D];重慶大學(xué);2011年
9 王磊;海上風(fēng)電機(jī)組系統(tǒng)動(dòng)力學(xué)建模及仿真分析研究[D];重慶大學(xué);2011年
10 陳杰;變速定槳風(fēng)力發(fā)電系統(tǒng)控制技術(shù)研究[D];南京航空航天大學(xué);2011年
相關(guān)碩士學(xué)位論文 前10條
1 吳樹(shù)梁;兆瓦級(jí)風(fēng)電齒輪箱故障監(jiān)測(cè)及分析[D];山東大學(xué);2012年
2 劉冠麟;兆瓦級(jí)風(fēng)電機(jī)組風(fēng)力槳葉動(dòng)力學(xué)仿真與優(yōu)化研究[D];湖南大學(xué);2012年
3 焦華超;兆瓦級(jí)風(fēng)力機(jī)葉片氣動(dòng)特性分析[D];新疆大學(xué);2012年
4 潘虹;兆瓦級(jí)風(fēng)能發(fā)電機(jī)組葉片的動(dòng)態(tài)特性及響應(yīng)分析[D];新疆大學(xué);2012年
5 趙陽(yáng);兆瓦級(jí)變漿距風(fēng)力發(fā)電機(jī)組智能控制系統(tǒng)的研究[D];東華大學(xué);2011年
6 羅劍波;兆瓦級(jí)風(fēng)電機(jī)組最佳功率控制研究[D];蘭州交通大學(xué);2012年
7 牛麗瓊;兆瓦級(jí)風(fēng)力發(fā)電機(jī)組的建模與控制研究[D];華北電力大學(xué);2011年
8 蔡學(xué)靜;兆瓦級(jí)風(fēng)力發(fā)電機(jī)組形態(tài)與人機(jī)環(huán)境研究[D];沈陽(yáng)工業(yè)大學(xué);2007年
9 陳建偉;風(fēng)力發(fā)電機(jī)組暫態(tài)模型和穩(wěn)定性分析方法研究[D];鄭州大學(xué);2010年
10 張小科;風(fēng)力發(fā)電機(jī)組振動(dòng)在線監(jiān)測(cè)及故障診斷[D];華北電力大學(xué)(北京);2011年
,本文編號(hào):2481827
本文鏈接:http://sikaile.net/kejilunwen/jixiegongcheng/2481827.html