基于負荷均衡準則的產(chǎn)業(yè)集群制造資源優(yōu)化配置研究
[Abstract]:The clustering of similar manufacturing resources in the same region is one of the remarkable characteristics of industrial clusters. The corresponding allocation of resources determines the operational efficiency of clusters. Therefore, this paper discusses how to strengthen the guidance and planning of cluster enterprises, introduce a low cost and suitable resource allocation model for small and medium-sized enterprises, so as to effectively organize and integrate manufacturing resources and improve the utilization ratio of manufacturing resources in clusters. It is of positive significance. Based on cluster theory, enterprise capability theory, agile manufacturing theory, resource dependence theory and resource modeling method, this paper takes the industrial cluster of small and medium-sized enterprises in Zhejiang Province as the research object. Multiple supplier order allocation decision under the National Natural Science Foundation Project "production load rate equilibrium criteria" (No. 70871062) and Zhejiang Natural Science Foundation Project "equipment load Parameter Measurement based on working current of Manufacturing Cluster" Funded by Technical Research (No. Y1080429), This paper studies the optimal allocation strategy of manufacturing resources in industrial clusters based on load balance, constructs a manufacturing resource information model for supplier manufacturing cells, and establishes a manufacturing resource information model based on supplier production, aiming at improving the utilization ratio of manufacturing resources in clusters. The task allocation mechanism which takes into account the interests of the supplier and the utility of the manufacturer can provide the decision basis for the overall optimization of the supply chain and the sustainable development of the cluster. Firstly, according to the characteristics of manufacturing resources in industrial clusters, this paper proposes to organize and manage manufacturing resources in clusters with manufacturing cells as the basic unit, and further gives the attribute description of manufacturing cells, and constructs the information model of manufacturing cell resources. On this basis, a multi-criteria and multi-level comprehensive performance evaluation system of manufacturing cells is established. The comprehensive performance evaluation results of manufacturing cells are obtained by using entropy method and AHP method. Load rate equilibrium is the basic criterion for optimal allocation of cluster manufacturing resources. In this paper, the load rate of manufacturing cell is analyzed based on capacity ontology, and the description and expression of load rate and its equilibrium are given. Furthermore, the mechanism of load rate in resource allocation is discussed separately. In this paper, the agility of cluster order response and the utilization of cluster manufacturing resources under load rate equilibrium criterion are discussed in detail to illustrate the validity and feasibility of load rate equilibrium criterion in cluster manufacturing resource allocation. The optimal allocation of cluster manufacturing resources should begin with the task decomposition. This paper presents the process of optimizing cluster manufacturing resource allocation based on load rate equilibrium criterion, and points out that the core of this problem is the task allocation based on load rate equilibrium. A multi-objective task allocation model is constructed to optimize the allocation of manufacturing resources and take account of the interests of orders at the same time. The genetic algorithm is used to solve the model, which verifies the validity of the model.
【學位授予單位】:寧波大學
【學位級別】:碩士
【學位授予年份】:2011
【分類號】:TH166
【參考文獻】
相關期刊論文 前10條
1 徐亞明;產(chǎn)業(yè)集群——浙江民營中小企業(yè)核心競爭力[J];商業(yè)研究;2005年16期
2 張翠華;朱宏;馬林;;基于JIT采購的訂單分配問題模型及仿真應用[J];東北大學學報;2006年11期
3 廖偉智,孫林夫;網(wǎng)絡化資源配置中的制造資源模型研究[J];電子科技大學學報;2005年05期
4 余強;張海盛;梁麗;;基于能力的制造資源模型研究[J];工程設計學報;2006年01期
5 古天龍;一類資源分配問題的DEDS模型[J];系統(tǒng)工程;1993年04期
6 常玉;董秋玲;;基于模糊綜合評價法的集群企業(yè)合作伙伴選擇[J];工業(yè)工程;2006年05期
7 田新時;一種以負荷為中心的生產(chǎn)管理系統(tǒng)[J];管理工程學報;1994年02期
8 許一敏;馬士華;;基于瓶頸負荷的BTO供應鏈響應時間優(yōu)化[J];管理學報;2009年04期
9 夏向陽;劉杰;;EGS環(huán)境下的訂單分配優(yōu)化分析[J];工業(yè)工程與管理;2007年02期
10 周珂;呂民;王剛;任秉銀;;制造任務分解與制造單元級資源配置協(xié)同優(yōu)化[J];哈爾濱工業(yè)大學學報;2009年11期
相關會議論文 前1條
1 譚躍雄;林強;陳學章;;基于柔性的企業(yè)制造系統(tǒng)資源配置分析及應用[A];第九屆中國管理科學學術年會論文集[C];2007年
相關博士學位論文 前1條
1 屈喜龍;區(qū)域網(wǎng)絡化制造中的資源管理及其優(yōu)化配置技術研究[D];西南交通大學;2006年
相關碩士學位論文 前1條
1 潘曉輝;基于ASP模式的網(wǎng)絡化制造資源建模及優(yōu)化配置方法研究[D];大連理工大學;2005年
,本文編號:2186572
本文鏈接:http://sikaile.net/kejilunwen/jixiegongcheng/2186572.html