重物吊裝減振器的設計
發(fā)布時間:2018-01-06 02:22
本文關鍵詞:重物吊裝減振器的設計 出處:《機械設計與制造》2016年08期 論文類型:期刊論文
【摘要】:為了減小起重機、高樓電梯、煤礦升降機等用鋼絲繩起吊重物的動載荷,設計了重物吊裝減振器。在減振器的結構設計和起吊重物受力分析的基礎上,根據(jù)單自由度無阻尼彈簧質量系統(tǒng),計算鋼絲繩中的動張力、動張力比、最大張力、張力差等,再進行減振器的設計計算,給出了減振器的設計計算的算例。減振器只減小鋼絲繩中的動張力,且效果明顯。動張力比無極值點。較合適的減振器彈簧的剛度是在滿足減振器結構的要求下有較小的鋼絲繩的動張力比,且起吊重物不產生共振。
[Abstract]:In order to reduce the dynamic load of lifting heavy objects with wire rope for cranes, elevators and coal mine hoists, a shock absorber is designed, which is based on the structural design of shock absorbers and the analysis of the force of lifting heavy objects. According to the mass system of single degree-of-freedom undamped spring, the dynamic tension, dynamic tension ratio, maximum tension and tension difference in wire rope are calculated. An example of the design and calculation of the shock absorber is given. The damper only reduces the dynamic tension in the wire rope. The stiffness of the shock absorber spring is smaller than that of the wire rope under the requirements of the shock absorber structure, and the lifting weight does not produce resonance.
【作者單位】: 淮陰工學院交通工程學院;淮陰工學院生命科學與化學工程學院;
【基金】:江蘇省高校自然科學研究重大項目(12KJA460001) 江蘇省高校自然科學基金(12KJB460001)
【分類號】:TH21
【正文快照】: 1引言為了減小起重機、高樓電梯、煤礦升降機等用鋼絲繩起吊重物的動載荷,設計了重物吊裝減振器。在重物吊裝減振器的設計中,主要解決3個問題:(1)減振器的結構;(2)鋼絲繩中最大張力及彈簧的最佳剛度;(3)減振器的設計計算流程。重物吊裝減振器的設計與起吊重物的振動、鋼絲繩中
【相似文獻】
相關期刊論文 前1條
1 李和平,夏翔,吳霞;圓柱螺旋壓縮彈簧的設計計算[J];井岡山師范學院學報;2005年03期
,本文編號:1385907
本文鏈接:http://sikaile.net/kejilunwen/jixiegongcheng/1385907.html