道次間冷卻對厚板控制軋制變形行為的影響
發(fā)布時間:2018-02-11 17:10
本文關鍵詞: 厚板 控軋控冷 道次間冷卻 差溫軋制 變形滲透性 出處:《鋼鐵》2017年09期 論文類型:期刊論文
【摘要】:厚規(guī)格鋼板軋制中低壓縮比難以消除連鑄坯心部缺陷,容易引起厚規(guī)格鋼板性能波動。采用數(shù)值模擬和試驗研究相結合的方法,詳細分析了道次間強冷卻工藝對厚規(guī)格板坯溫度變化和軋制變形的影響規(guī)律。結果表明,采用道次間強制水冷的方式進行"溫控-形變"耦合控制,可以有效提高厚規(guī)格鋼板心部變形量,改善內(nèi)部質(zhì)量。對比分析可知,高溫粗軋階段采用道次間冷卻對鋼板心部變形影響較大;精軋階段進行道次間冷卻,對鋼板心部變形影響相對較小,同時將顯著提升道次軋制力。
[Abstract]:The low compression ratio of thick steel plate rolling is difficult to eliminate the defects in the center of continuous casting billet, and it is easy to cause the performance fluctuation of thick steel plate. The method of numerical simulation and experimental study is adopted. The influence of strong interpass cooling process on the temperature change and rolling deformation of thick slab is analyzed in detail. The results show that the coupling control of "temperature control and deformation" is carried out by means of forced water cooling between passes. The core deformation of thick steel plate can be increased effectively and the internal quality can be improved. The comparison and analysis show that interpass cooling at high temperature rough rolling stage has a great influence on the core deformation of steel plate. The effect on the center deformation of steel plate is relatively small, and the rolling force of pass will be increased significantly at the same time.
【作者單位】: 東北大學軋制技術及連軋自動化國家重點實驗室;
【基金】:國家重點研發(fā)計劃資助項目(2016YFB0300601,2016YFB0300602)
【分類號】:TG335.51
,
本文編號:1503568
本文鏈接:http://sikaile.net/kejilunwen/jiagonggongyi/1503568.html
最近更新
教材專著