臨潼污水處理廠二期工程工藝設(shè)計(jì)研究
發(fā)布時(shí)間:2018-05-31 12:05
本文選題:污水水質(zhì) + 厭氧-缺氧-好氧活性污泥法工藝 ; 參考:《長(zhǎng)安大學(xué)》2015年碩士論文
【摘要】:本文以臨潼污水處理廠二期工程工藝設(shè)計(jì)為研究對(duì)象,通過(guò)對(duì)污水處理廠一期工程實(shí)際運(yùn)行水質(zhì)、水量、主要處理設(shè)備和污染物處理效果等統(tǒng)計(jì)與實(shí)際監(jiān)測(cè)分析,確定了二期工程設(shè)計(jì)規(guī)模和水質(zhì)指標(biāo),對(duì)比選擇推薦的工藝方案進(jìn)行了參數(shù)選取和主要水處理構(gòu)筑物工藝設(shè)計(jì)計(jì)算、工程投資估算和處理成本分析。得到主要結(jié)果如下:(1)通過(guò)對(duì)臨潼污水處理廠實(shí)際運(yùn)行水量統(tǒng)計(jì)和取樣監(jiān)測(cè)分析,結(jié)合污水廠服務(wù)區(qū)的發(fā)展與排水管網(wǎng)建設(shè)情況,運(yùn)用累計(jì)頻率分析的方法,確定二期工程設(shè)計(jì)規(guī)模為2.5×104m3/d;(2)統(tǒng)計(jì)分析污水廠一期工程實(shí)際運(yùn)行的水質(zhì)數(shù)據(jù),結(jié)合現(xiàn)場(chǎng)采樣檢測(cè)數(shù)據(jù),取定保證率為90%,進(jìn)水水質(zhì)確定為BOD5:150mg/L,COD:300 mg/L,SS:150 mg/L,NH3-N:30 mg/L,TN:40 mg/L,TP:4.5mg/L。(3)通過(guò)工藝比選,確定污水廠二期工程采用厭氧-缺氧-好氧活性污泥法工藝。二期的污泥處理與一期分開(kāi)新建,確定采用濃縮—消化—脫水—干化—集中外運(yùn)的處理工藝流程。(4)二期工程采用(3)中的污水和污泥處理工藝,水價(jià)最后確定為為1.4元每噸。污水廠二期擴(kuò)建工程的建成投產(chǎn),將使每年排入渭河的污染負(fù)荷大幅度削減,有較好的環(huán)境和社會(huì)效益。
[Abstract]:This paper takes the process design of the second phase project of Lintong sewage treatment plant as the research object, through statistics and actual monitoring analysis on the actual running water quality, quantity of water, main treatment equipment and pollutant treatment effect of the first stage project of the sewage treatment plant. The design scale and water quality index of the second phase project are determined, and the parameter selection, the main water treatment structure process design calculation, the project investment estimation and the treatment cost analysis are carried out by comparing and selecting the recommended process plan. The main results are as follows: (1) through the statistics of the actual operation water quantity and sampling monitoring analysis of Lintong sewage treatment Plant, combined with the development of the service area of the sewage treatment Plant and the construction of the drainage pipe network, the accumulative frequency analysis method is used. To determine the design scale of the second phase project is 2.5 脳 10 4 m3 / d / 2) Statistics and analysis of the actual water quality data of the first stage project of the sewage treatment plant, combined with field sampling and testing data, taking the assurance rate of 90 and determining the influent water quality as BOD5: 150mg / L COD: 300 mg / L / L = 300 mg / L SSW 150 mg / L NH _ 3-N: 30 mg / L TNN / 40 mg / L TPw 4.5 mg / L / L. 3) through the process comparison. The anaerobic-anoxic-aerobic activated sludge process was adopted in the second phase of the wastewater treatment plant. The sludge treatment in the second phase is separated from the first stage, and the process flow of thickening, digestion, dewatering, drying and shipping is adopted. The treatment process of sewage and sludge is adopted in the second phase of the project. The water price is finally determined to be 1.4 yuan per ton. With the completion and commissioning of the second phase of the sewage treatment works, the pollution load discharged into the Weihe River every year will be greatly reduced, and it will have better environmental and social benefits.
【學(xué)位授予單位】:長(zhǎng)安大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:X703
【參考文獻(xiàn)】
相關(guān)期刊論文 前2條
1 黃寧俊;王社平;王小林;李建洋;劉丹松;鄭寧;杜銳;王建軍;;西安市第四污水處理廠工藝設(shè)計(jì)介紹[J];給水排水;2007年11期
2 ;西安市人民政府關(guān)于印發(fā)西安市渭河水污染防治綜合整治實(shí)施方案的通知[J];西安市人民政府公報(bào);2006年06期
,本文編號(hào):1959611
本文鏈接:http://sikaile.net/kejilunwen/huanjinggongchenglunwen/1959611.html
最近更新
教材專著