石化污水脫氮除磷工藝優(yōu)化與動力學(xué)研究
本文關(guān)鍵詞: 污水處理 脫氮除磷 硝化反應(yīng) A~2/O工藝 動力學(xué)模型 出處:《清華大學(xué)》2015年碩士論文 論文類型:學(xué)位論文
【摘要】:近年來,社會經(jīng)濟迅速發(fā)展提高了人民的生活水平,隨之而來的水體污染問題出現(xiàn)越來越嚴重的趨勢,已上升為全球關(guān)注的重要環(huán)境問題之一。氮鹽和磷鹽的排放是造成成水體富營養(yǎng)化的最主要原因,為防止水質(zhì)進一步惡化和有效改善環(huán)境質(zhì)量,污水中碳、氮、磷的去除成為污水處理技術(shù)的關(guān)鍵。目前,污水處理技術(shù)得到了長足的發(fā)展,每一種新技術(shù)新工藝的開發(fā)和應(yīng)用,都要建立在經(jīng)濟可行的前提下才能得到有效發(fā)揮和推廣。2011年,國家環(huán)境保護“十二五”規(guī)劃[4]對排放總量進行了具體部署和要求,對碳和氨態(tài)氮在五年內(nèi)的削減總量提出了強制性目標。隨著污水排放標準不斷嚴格和新環(huán)保法的實施,許多行業(yè)老污水處理廠都相繼完成了提標改造。為響應(yīng)國家節(jié)能減排、實行總量達標排放目標,更深入地分析脫氮除磷工藝對污染物的生物降解過程和達到優(yōu)化運行效果,本研究在相關(guān)基礎(chǔ)理論指導(dǎo)和前期研究的基礎(chǔ)上,對石化污水廠原生化處理脫氮工藝進行了必要的調(diào)整和改造。通過在生產(chǎn)實踐中優(yōu)化運行,對過程跟蹤采樣和計算分析,達到了既定的研究目標。主要結(jié)論如下:(1)通過調(diào)整工藝和優(yōu)化參數(shù)運行,系統(tǒng)對碳、氮、磷的去除率分別達到80%、80%、92.24%,實現(xiàn)了污染物質(zhì)去除和達標排放。(2)A~2/O脫氮除磷工藝的碳、氮、磷在系統(tǒng)的平衡比分別為97.82%、98.05%、96.19%,系統(tǒng)達到了長期穩(wěn)定運行的效果。(3)系統(tǒng)缺氧段前置和分段進水解決了碳源競爭和硝酸鹽影響釋磷的問題,保證了反硝化脫氮、厭氧釋磷、好氧生物硝化和好氧吸磷反應(yīng)的順利進行。(4)污水裝置的運行過程可通過長期數(shù)據(jù)積累和建立動力學(xué)模型進行水質(zhì)預(yù)測。階段性地對模型常數(shù)修訂提高模擬精度,服務(wù)于生產(chǎn)。
[Abstract]:In recent years, the rapid development of social economy has improved the standard of living of the people, followed by the problem of water pollution is becoming more and more serious. The discharge of nitrogen salt and phosphorus salt is the main cause of eutrophication. In order to prevent the further deterioration of water quality and improve the environmental quality effectively, carbon and nitrogen in sewage. Phosphorus removal has become the key of wastewater treatment technology. At present, sewage treatment technology has been greatly developed, each new technology and new technology development and application. In 2011, the 12th Five-Year Plan for National Environmental Protection. [(4) the specific arrangement and requirements of the total discharge amount are carried out, and the mandatory targets for the total reduction of carbon and ammonia nitrogen within five years are put forward. With the continuous tightening of the sewage discharge standards and the implementation of the new environmental protection law. Many old wastewater treatment plants in many industries have completed the upgrading of the standard. In order to respond to the national energy conservation and emission reduction, the total discharge target has been implemented. More in-depth analysis of nitrogen and phosphorus removal process on the biological degradation of pollutants and achieve optimal operation results, this study on the basis of relevant theoretical guidance and previous research. The process of denitrification for primary treatment in petrochemical wastewater treatment plant was adjusted and reformed. Through optimizing operation in production practice, process tracking sampling and calculation analysis were carried out. The main conclusions are as follows: 1) by adjusting the process and optimizing the operation parameters, the removal rate of carbon, nitrogen and phosphorus in the system has reached 80%, 80% and 92.24% respectively. The equilibrium ratio of carbon, nitrogen and phosphorus in the process of nitrogen and phosphorus removal of pollution material removal and discharge up to standard is 97.82% 98.05% and 96.19% respectively. The system has achieved the effect of long-term stable operation.) the anoxic stage of the system pre-and sub-feed to solve the problem of carbon source competition and nitrate influence phosphorus release, ensure denitrification nitrogen release, anaerobic phosphorus release. Aerobic biological nitrification and aerobic phosphorus uptake reaction. The operation process of sewage plant can be predicted by long-term data accumulation and dynamic model, and the simulation accuracy can be improved by modifying the model constant. Serve production.
【學(xué)位授予單位】:清華大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:X78
【相似文獻】
相關(guān)期刊論文 前10條
1 陳威;李曉梅;李博;;污水脫氮除磷工藝發(fā)展探討[J];黑龍江環(huán)境通報;2009年02期
2 張磊;張雁秋;王培廷;;兩種脫氮除磷工藝在實踐中的比較[J];水處理技術(shù);2010年10期
3 趙欣;;生物法脫氮除磷工藝特點分析[J];邯鄲職業(yè)技術(shù)學(xué)院學(xué)報;2006年01期
4 丁超;;序批式活性污泥法脫氮除磷工藝的分析與改進[J];市政技術(shù);2006年04期
5 張超;呂錫武;荊肇乾;曾蘇;;五箱一體化脫氮除磷工藝在示范工程中的應(yīng)用[J];環(huán)境污染與防治;2007年07期
6 雷俊俠;高智榮;;城市污水處理脫氮除磷工藝[J];廣東化工;2011年07期
7 楊志斌;黃勇;潘楊;;采用雙泥系統(tǒng)的廢水脫氮除磷工藝的研究現(xiàn)狀與進展[J];環(huán)境科學(xué)與管理;2006年06期
8 李澤政;;污水生物脫氮除磷工藝研究進展[J];廣東化工;2010年12期
9 董國日;;脫氮除磷工藝研究進展[J];大眾科技;2008年12期
10 鄒丹;邵林廣;柯國慶;;鄂州梁子島污水廠脫氮除磷工藝設(shè)計[J];建設(shè)科技;2008年14期
相關(guān)重要報紙文章 前1條
1 文吉;從區(qū)域出發(fā)保護城市水環(huán)境[N];中國建設(shè)報;2012年
相關(guān)碩士學(xué)位論文 前10條
1 賈玉翔;SBR處理城市廢水脫氮除磷工藝的研究[D];燕山大學(xué);2016年
2 喻朝飛;石化污水脫氮除磷工藝優(yōu)化與動力學(xué)研究[D];清華大學(xué);2015年
3 張超;多點交替進水五箱一體化脫氮除磷工藝的特性及機理研究[D];東南大學(xué);2006年
4 趙曉靚;膜—生物反應(yīng)器的脫氮除磷工藝研究[D];北京交通大學(xué);2007年
5 尚曉;電解脫氮除磷工藝在規(guī);B(yǎng)豬廢水處理中的應(yīng)用研究[D];上海交通大學(xué);2009年
6 孫明正;MBR脫氮除磷工藝特征及其膜污染控制研究[D];吉林大學(xué);2011年
7 林良琨;A/O同步脫氮除磷工藝試驗研究[D];廣州大學(xué);2011年
8 何新慧;雙SBR脫氮除磷工藝的啟動、特性試驗與動力學(xué)分析[D];西安建筑科技大學(xué);2006年
9 石瑾;MSBR污水脫氮除磷工藝試驗研究及工程應(yīng)用[D];同濟大學(xué);2007年
10 郭遠凱;城市污水Phoredox脫氮除磷工藝研究[D];廣東工業(yè)大學(xué);2005年
,本文編號:1453900
本文鏈接:http://sikaile.net/kejilunwen/huanjinggongchenglunwen/1453900.html