合成氣壓縮機(jī)高負(fù)荷適應(yīng)性技術(shù)研究和改造
[Abstract]:With the rapid development of China's industry, ammonia as an important raw material of industry and ammoniation feed, its role is increasingly prominent. Therefore, each synthetic ammonia enterprise is increasing the synthetic ammonia production of this enterprise. On the basis of the original equipment, it is necessary to make the equipment run at high load to increase the production of synthetic ammonia. Whether the original equipment can adapt to the high load production demand becomes the key factor of the ammonia synthesis enterprise's high load production. This paper mainly aims at a series of problems in the process of high load operation of the synthetic ammonia plant in the chemical fertilizer business unit of Baling Branch of China Petroleum and Chemical Co., Ltd., the core equipment of the plant, the syngas compressor, has exposed a series of problems. Especially when the production capacity of synthetic ammonia is more than 1200 tons / day, there is a big deviation between the design parameters of the system and the running data. Through collecting and sorting out the data of the failure of the synthetic gas compressor in the enterprise when the production load is high, the problem is that there is a big deviation between the system design parameters and operation data. Statistics and site survey. The main causes of equipment failure are analyzed, and the corresponding improvement measures are put forward according to each reason. Finally, the local modification and process optimization are carried out and verified by experiments. The main contents of this paper are as follows: (1) the revamping process of synthetic ammonia plant and process in Baling Petrochemical Company is described in detail. The development of synthetic ammonia process at home and abroad and the research status of syngas compressor are summarized. (2) the problems in the process of operation of syngas compressor are summarized by causal analysis method, and these problems are divided into three types: process problems, equipment problems and monitoring problems. (3) aiming at the problem that the syngas compressor can not adapt to the high load operation, the process route is adjusted, and the inlet pressure, the synthesis tower and the high and high pressure turbine are adjusted accordingly. (4) the equipment problems of syngas compressor, such as medium pressure steam balance, surface cooling vacuum system, coupling joint fracture, coupling failure and so on, are deeply analyzed and studied, and the corresponding improvement measures are put forward. (5) to upgrade the condition monitoring system of syngas compressor unit and the integrated control and interlock protection system (ITCC) of large unit, and to update the diagnosis system and speed regulation system.
【學(xué)位授予單位】:湖南大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TQ113.251
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 顧春偉;山口和夫;長(zhǎng)島利夫;;離心壓氣機(jī)不穩(wěn)定特性的研究[J];動(dòng)力工程;2006年02期
2 丁亮;王彤;谷傳綱;;合成氣壓縮機(jī)循環(huán)段流動(dòng)性能分析[J];工程熱物理學(xué)報(bào);2012年06期
3 殷文華;羅英奇;吳巍;伍毅;曾凡華;李克兵;郜豫川;;變壓吸附技術(shù)在合成氨行業(yè)的應(yīng)用和發(fā)展[J];低溫與特氣;2015年01期
4 李瑞祥;;合成氨催化劑研究的新進(jìn)展[J];化工管理;2015年07期
5 孫原慶;周海鵬;鄧水平;;合成氣壓縮機(jī)的擴(kuò)能改造[J];安徽化工;2013年04期
6 韓紅梅;;我國合成氨工業(yè)進(jìn)展評(píng)述[J];化學(xué)工業(yè);2010年09期
7 趙月剛;;4V-9S型合成氣壓縮機(jī)運(yùn)行故障分析及改進(jìn)[J];流體機(jī)械;2012年09期
8 劉化章;;合成氨工業(yè):過去、現(xiàn)在和未來——合成氨工業(yè)創(chuàng)立100周年回顧、啟迪和挑戰(zhàn)[J];化工進(jìn)展;2013年09期
9 于寶;周倜;宋巍;楊佳奇;;合成氨裝置一段轉(zhuǎn)化爐外伸段母材泄漏原因分析[J];煉油與化工;2015年01期
10 牛斌;楊昭君;王有;;合成氨裝置合成氣壓縮機(jī)干氣密封系統(tǒng)的應(yīng)用[J];化肥設(shè)計(jì);2013年01期
相關(guān)博士學(xué)位論文 前1條
1 高闖;離心壓縮機(jī)無葉擴(kuò)壓器失速與系統(tǒng)喘振先兆分析研究[D];上海交通大學(xué);2011年
相關(guān)碩士學(xué)位論文 前1條
1 朱永江;離心壓縮機(jī)穩(wěn)定性評(píng)價(jià)與失穩(wěn)故障診斷研究[D];北京化工大學(xué);2012年