Siemens給大型電力和海水淡化項(xiàng)目提供動力島設(shè)備
發(fā)布時間:2019-05-17 18:36
【摘要】:正據(jù)《Gas Turbine World》2015年11~12月報道,Siemins已經(jīng)接受了一個訂單,為在卡塔爾的具有成一體的海水淡化裝置的新的聯(lián)合循環(huán)電站提供動力島設(shè)備。具有2.5 GW總的發(fā)電功率和每天6億1千8百萬公升飲用水,該聯(lián)合循環(huán)電站將提供卡塔爾幾乎四分之一的裝機(jī)發(fā)電功率。它將保證足夠的電力和飲水供應(yīng),以便適應(yīng)季節(jié)性的波動和重大事件。
[Abstract]:According to < Gas Turbine World > reported from November to December 2015, Siemins has accepted an order to provide power island equipment for a new combined cycle power station with an integrated desalination unit in Qatar. With a total power generation of 2.5 GW and 618 million litres of drinking water per day, the combined cycle power station will provide almost 1/4 of Qatar's installed power. It will ensure an adequate supply of electricity and drinking water to adapt to seasonal fluctuations and major events.
【分類號】:P747;TM62
,
本文編號:2479318
[Abstract]:According to < Gas Turbine World > reported from November to December 2015, Siemins has accepted an order to provide power island equipment for a new combined cycle power station with an integrated desalination unit in Qatar. With a total power generation of 2.5 GW and 618 million litres of drinking water per day, the combined cycle power station will provide almost 1/4 of Qatar's installed power. It will ensure an adequate supply of electricity and drinking water to adapt to seasonal fluctuations and major events.
【分類號】:P747;TM62
,
本文編號:2479318
本文鏈接:http://sikaile.net/kejilunwen/haiyang/2479318.html
最近更新
教材專著