路域DEM數(shù)據(jù)變化區(qū)域標(biāo)定方法的探討
發(fā)布時(shí)間:2019-01-19 20:24
【摘要】:針對(duì)道路建設(shè)引起的路域DEM數(shù)據(jù)變化范圍的標(biāo)定問(wèn)題,該文探討了基于多源數(shù)據(jù)的標(biāo)定方法。該方法首先提取設(shè)計(jì)成果的外邊界作為核心變化區(qū),再根據(jù)該區(qū)域100m范圍內(nèi)道路建設(shè)前后的遙感影像提取出植被發(fā)生明顯變化的區(qū)域作為野外調(diào)查和建模處理的區(qū)域,并對(duì)該區(qū)域內(nèi)融合構(gòu)建的DEM數(shù)據(jù)和原有帶狀地形圖構(gòu)建的DEM數(shù)據(jù)進(jìn)行差異分析,求出最終的DEM數(shù)據(jù)變化區(qū)。以杭瑞高速畢都(畢節(jié)至都格)段為例開(kāi)展的實(shí)驗(yàn)研究表明,該文提出的方法可以精確地標(biāo)定因道路建設(shè)引起路域DEM數(shù)據(jù)的變化區(qū)域,可直接用于DEM數(shù)據(jù)增量的采編與更新操作。
[Abstract]:This paper discusses the calibration method based on multi-source data in view of the calibration problem of the range of DEM data change caused by road construction. In this method, the outer boundary of the design results is first extracted as the core change area, and then, according to the remote sensing images before and after the road construction within 100 m of the region, the area where the vegetation changes obviously is extracted as the field investigation and modeling area. The difference between the DEM data fused in the region and the DEM data constructed by the original zonal topographic map is analyzed, and the final DEM data variation area is obtained. The experimental study on the section of Beidu (Bijie to Duge) in Hangrui Expressway shows that the method proposed in this paper can accurately calibrate the changing region of DEM data caused by road construction. Can be directly used for DEM data increment collection and update operation.
【作者單位】: 長(zhǎng)沙理工大學(xué)交通運(yùn)輸工程學(xué)院;貴州省交通規(guī)劃勘察設(shè)計(jì)研究院股份有限公司;
【基金】:貴州省交通運(yùn)輸廳科技計(jì)劃項(xiàng)目(2015-121-022) 湖南省科技廳重點(diǎn)研發(fā)計(jì)劃項(xiàng)目(2016SK2023)
【分類(lèi)號(hào)】:P208
[Abstract]:This paper discusses the calibration method based on multi-source data in view of the calibration problem of the range of DEM data change caused by road construction. In this method, the outer boundary of the design results is first extracted as the core change area, and then, according to the remote sensing images before and after the road construction within 100 m of the region, the area where the vegetation changes obviously is extracted as the field investigation and modeling area. The difference between the DEM data fused in the region and the DEM data constructed by the original zonal topographic map is analyzed, and the final DEM data variation area is obtained. The experimental study on the section of Beidu (Bijie to Duge) in Hangrui Expressway shows that the method proposed in this paper can accurately calibrate the changing region of DEM data caused by road construction. Can be directly used for DEM data increment collection and update operation.
【作者單位】: 長(zhǎng)沙理工大學(xué)交通運(yùn)輸工程學(xué)院;貴州省交通規(guī)劃勘察設(shè)計(jì)研究院股份有限公司;
【基金】:貴州省交通運(yùn)輸廳科技計(jì)劃項(xiàng)目(2015-121-022) 湖南省科技廳重點(diǎn)研發(fā)計(jì)劃項(xiàng)目(2016SK2023)
【分類(lèi)號(hào)】:P208
【相似文獻(xiàn)】
相關(guān)期刊論文 前8條
1 高鵬;金永煥;王景田;宋鑄福;曹艷萍;周海城;;長(zhǎng)白山自然保護(hù)區(qū)道路使用對(duì)路域植物和土壤的影響[J];生態(tài)科學(xué);2012年05期
2 尹鯤鵬;;結(jié)合合淮阜環(huán)境保護(hù)監(jiān)理工作實(shí)施情況探討高速公路路域生態(tài)環(huán)境保護(hù)[J];科技資訊;2011年04期
3 唐s,
本文編號(hào):2411720
本文鏈接:http://sikaile.net/kejilunwen/dizhicehuilunwen/2411720.html
最近更新
教材專(zhuān)著