構皮灘拱壩,中文例句,英文例句
本文關鍵詞:大崗山拱壩壩基(肩)控制性巖體結構的系統(tǒng)工程地質研究,由筆耕文化傳播整理發(fā)布。
1.
Hydroelastic Model Test Research on Releasing Flood Vibration of Arch Dam for Goupitan Project
構皮灘拱壩壩身泄洪振動水彈性模型試驗研究
2.
Joints Grouting Construction Technology of Arch Dam in Goupitan Hydropower Station
構皮灘水電站拱壩接縫灌漿施工技術
3.
Analysis of Deformation Effect from Weak Intermediate Beds to Goupitan High Arch Dam;
軟弱夾層對構皮灘高拱壩變形影響分析
4.
The Research and Test of No-cover Consolidation Grout in 27# Dam Segment of Goupitan Hydropower Station;
構皮灘水電站27#壩段無蓋重固結灌漿試驗研究
5.
Experimental Study on Non-Cover-Weight Grouting at Bank-slope Monolith of Goupitan Hydropower Station
構皮灘水電站岸坡壩段無蓋重灌漿試驗研究
6.
Study on the Temperature Field of Ertan Arch Dam in the First Impounding Period and Its Effect on the Structure of the Dam;
二灘水電站初期蓄水拱壩溫度場及對大壩結構特性作用與影響研究
7.
Appraisal on Supervision Work of Arch Dam Works of Ertan Hydropower Project;
二灘水電站拱壩工程監(jiān)理工作后評估
8.
Clough, R. W., "Reservoir Interaction Effect on the Dynamic Response of Arch Dams", Proceedings of US-PRC Bilateral Workshop on Earthquake Engineering. Vol. 1, August, 1982, Harbin, China.
張楚漢、王綦正,緊水灘拱壩動力分析,拱壩技術(中國拱壩情報網(wǎng)刊物),1985年三期.
9.
Consolidation Grouting Test in Non Concrete Layer Foundation in Dam Section on Bank Slope of Goupitan Hydropower Station
淺析構皮灘水電站岸坡壩段無蓋重固結灌漿試驗
10.
Overload Research of Topography Asymmetry on Baihetan Arch Dam
地形不對稱對白鶴灘拱壩超載能力的影響研究
11.
Modal parameter identification of Ertan arch dam from strong earthquake records
基于強震記錄的二灘拱壩模態(tài)參數(shù)識別
12.
Sensibility Analysis on Influence of Deformation Modulus Variation for Ertan Arch Dam Foundation on Dam Stress
二灘拱壩基礎變形模量變化對壩體應力影響的敏感性分析
13.
Study about the Deformation Properties of the Columnar Joints Basalts for the Foundation of the High Arch Dam of Baihetan Hydropower Station Jinsha River;
金沙江白鶴灘水電站高拱壩壩基柱狀節(jié)理玄武巖變形特性研究
14.
Safety Analysis and Simulation of Flood Discharge of High Arch Dam and Counter-arch Plunge Pool;
高拱壩及反拱水墊塘結構泄洪安全分析與模擬
15.
Engineering Geological Feasibility Study of High Arch Dam Construction at Baihetan Hydropower Station, Jinsha River;
金沙江白鶴灘水電站高拱壩建設工程地質適宜性研究
16.
Analysis on Forced Behavior of High Arch Dam s Outlet Bearing Structure;
高拱壩泄洪孔支承結構工作性態(tài)分析
17.
Study of RCC Arch Dam Structure of Longshou Hydropower Project;
龍首水電站碾壓混凝土拱壩結構研究
18.
Study on Systematical Engineering Geology of Controlling Rock Mass Structure in Dagangshan Arch Dam Foundation;
大崗山拱壩壩基(肩)控制性巖體結構的系統(tǒng)工程地質研究
本文關鍵詞:大崗山拱壩壩基(肩)控制性巖體結構的系統(tǒng)工程地質研究,由筆耕文化傳播整理發(fā)布。
本文編號:215531