白鶴灘水電站施工供水系統(tǒng)規(guī)劃設(shè)計(jì)
[Abstract]:The construction of water supply system of Baihetan Hydropower Station during construction is one of the earliest projects to start construction of hydropower station, and it is the key to select water intake structure according to the characteristics of local water source. This paper focuses on the selection of different water intake methods and water intake structures according to the characteristics of different water sources, which ensures the continuous and smooth construction of the water intake capacity and engineering of the whole water supply system. At the same time, it can also be used as a reference for the selection and design of water intake structure of similar hydropower station water supply system.
【作者單位】: 長(zhǎng)江三峽技術(shù)經(jīng)濟(jì)發(fā)展有限公司;
【分類號(hào)】:TV752;TV54
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張成穩(wěn);曾廳余;宗德孝;居志剛;;白鶴灘水電站建設(shè)期氣象保障服務(wù)思考[J];云南大學(xué)學(xué)報(bào)(自然科學(xué)版);2012年S2期
2 張為民,徐建強(qiáng),計(jì)金華;金沙江白鶴灘水電站工程建設(shè)時(shí)機(jī)的選擇[J];水力發(fā)電;2003年06期
3 ;金沙江白鶴灘水電站開工[J];云南水力發(fā)電;2011年06期
4 周雙超;;張楚漢院士稱:白鶴灘水電站綜合技術(shù)指標(biāo)居世界前列[J];四川水力發(fā)電;2006年04期
5 ;白鶴灘水電站施工總布置規(guī)劃復(fù)核報(bào)告通過審查[J];水利水電施工;2010年04期
6 金珍宏;;白鶴灘水電站運(yùn)行期能耗指標(biāo)計(jì)算分析[J];水利規(guī)劃與設(shè)計(jì);2013年04期
7 劉振中;黎細(xì)波;張婷;;半預(yù)制式界樁在白鶴灘水電站建設(shè)征地界樁測(cè)設(shè)中的應(yīng)用[J];大壩與安全;2012年04期
8 于雷;;白鶴灘水電站明挖工程爆破降塵試驗(yàn)方案研究[J];科技與企業(yè);2013年22期
9 金珍宏;;白鶴灘水電站施工期能耗量分析方法[J];水利水電技術(shù);2012年11期
10 ;白鶴灘水電站圓筒形調(diào)壓室開挖支護(hù)專題報(bào)告咨詢會(huì)議在北京召開[J];四川水力發(fā)電;2013年02期
相關(guān)會(huì)議論文 前1條
1 陳鋼;馮真秋;;白鶴灘水電站1000MW機(jī)組設(shè)計(jì)方案[A];大型水輪發(fā)電機(jī)組技術(shù)論文集[C];2008年
相關(guān)重要報(bào)紙文章 前10條
1 《金沙江報(bào)道》記者 周雙超;白鶴灘水電站綜合技術(shù)指標(biāo)居世界前列[N];涼山日?qǐng)?bào)(漢);2006年
2 陸林康 石興普;白鶴灘水電站成為中國(guó)第二大水電站[N];涼山日?qǐng)?bào)(漢);2007年
3 張?zhí)齑?白鶴灘水電站籌建工作啟動(dòng)[N];云南日?qǐng)?bào);2008年
4 本報(bào)記者 宋e,
本文編號(hào):2480412
本文鏈接:http://sikaile.net/kejilunwen/dianlilw/2480412.html