海上風(fēng)電場(chǎng)運(yùn)行維護(hù)系統(tǒng)
[Abstract]:With the rapid development of offshore wind power industry, the requirements for operation and maintenance of offshore wind power units are constantly improved, and the mode of operation and management of offshore wind farms is relatively backward, which makes the overall operating expenses high and seriously restricts the healthy development of the wind power industry. This paper presents a research method of large-scale equipment operation and maintenance system which is suitable for wind power industry. On the basis of summarizing the special requirements and existing problems of the operation and maintenance of wind farms at home and abroad, this paper expounds the positioning of the operation and maintenance system of offshore wind farms, the key problems to be solved and the innovative work contents. The overall framework of the system is designed, the business functions of each subsystem and their relations are analyzed, the two key technologies of (BOM) and maintenance workflow are discussed, and the software system is developed and verified in the enterprise.
【作者單位】: 清華大學(xué)自動(dòng)化系;
【基金】:國(guó)家“八六三”高技術(shù)項(xiàng)目(2012AA051707)
【分類號(hào)】:TM614
【參考文獻(xiàn)】
相關(guān)期刊論文 前2條
1 程曜安;張力;劉英博;莫欣農(nóng);;大型復(fù)雜裝備MRO系統(tǒng)解決方案[J];計(jì)算機(jī)集成制造系統(tǒng);2010年10期
2 陳雪峰;李繼猛;程航;李兵;何正嘉;;風(fēng)力發(fā)電機(jī)狀態(tài)監(jiān)測(cè)和故障診斷技術(shù)的研究與進(jìn)展[J];機(jī)械工程學(xué)報(bào);2011年09期
【共引文獻(xiàn)】
相關(guān)期刊論文 前10條
1 敖堂波;催兆俊;杜珊珊;;轉(zhuǎn)爐傾動(dòng)機(jī)械軸承振動(dòng)狀態(tài)監(jiān)測(cè)系統(tǒng)的設(shè)計(jì)[J];安徽工業(yè)大學(xué)學(xué)報(bào)(自然科學(xué)版);2012年01期
2 田釗;程曜安;劉英博;趙炯;張力;;工作流應(yīng)用數(shù)據(jù)生命周期模型的提取方法[J];計(jì)算機(jī)集成制造系統(tǒng);2011年08期
3 楊濤;任永;劉霞;黃樹紅;高偉;;風(fēng)力機(jī)葉輪質(zhì)量不平衡故障建模及仿真研究[J];機(jī)械工程學(xué)報(bào);2012年06期
4 龔劍波;黃民翔;孫飛飛;;基于GO法的含分布式電源的配電系統(tǒng)可靠性評(píng)估[J];電力系統(tǒng)保護(hù)與控制;2012年16期
5 陳曉磊;徐小力;吳國(guó)新;;物聯(lián)網(wǎng)架構(gòu)下風(fēng)力發(fā)電機(jī)組遠(yuǎn)程狀態(tài)監(jiān)測(cè)系統(tǒng)設(shè)計(jì)[J];機(jī)械研究與應(yīng)用;2012年06期
6 孫自強(qiáng);陳長(zhǎng)征;谷艷玲;谷泉;;基于多重分形的風(fēng)力機(jī)主軸承故障診斷應(yīng)用[J];機(jī)械設(shè)計(jì)與制造;2013年01期
7 劉文霞;蔣程;張建華;王昕偉;于雷;劉德先;;一種用于序貫蒙特卡羅仿真的風(fēng)電機(jī)組多狀態(tài)可靠性模型[J];電力系統(tǒng)保護(hù)與控制;2013年08期
8 買買提熱依木·阿布力孜;;雙饋感應(yīng)風(fēng)力發(fā)電系統(tǒng)電流控制策略研究[J];可再生能源;2013年07期
9 雷達(dá);鐘詩(shī)勝;;面向MRO的民航發(fā)動(dòng)機(jī)拆發(fā)日期預(yù)測(cè)系統(tǒng)[J];計(jì)算機(jī)集成制造系統(tǒng);2013年07期
10 畢小玉;田慕琴;宋建成;吝伶艷;鄭麗君;李傳揚(yáng);;主通風(fēng)機(jī)電動(dòng)機(jī)絕緣狀態(tài)監(jiān)測(cè)及故障診斷方法研究[J];工礦自動(dòng)化;2013年09期
相關(guān)博士學(xué)位論文 前10條
1 劉剛;基于產(chǎn)品形態(tài)的生命周期數(shù)據(jù)閉環(huán)管理研究[D];山東大學(xué);2012年
2 翁浩;機(jī)泵群無線監(jiān)測(cè)中數(shù)據(jù)壓縮與優(yōu)化傳輸技術(shù)研究[D];北京化工大學(xué);2013年
3 辛衛(wèi)東;風(fēng)電機(jī)組傳動(dòng)鏈振動(dòng)分析與故障特征提取方法研究[D];華北電力大學(xué);2013年
4 劉洋;多維規(guī)劃的復(fù)雜產(chǎn)品模塊化設(shè)計(jì)關(guān)鍵技術(shù)研究[D];武漢理工大學(xué);2013年
5 徐剛;基于光纖傳感的機(jī)械設(shè)備動(dòng)態(tài)監(jiān)測(cè)關(guān)鍵技術(shù)研究與應(yīng)用[D];武漢理工大學(xué);2013年
6 李媛;中國(guó)戰(zhàn)略性新興產(chǎn)業(yè)的成長(zhǎng)機(jī)制與實(shí)證研究[D];南開大學(xué);2013年
7 李國(guó)正;基于RAMS的地鐵列車車載設(shè)備維修策略與故障診斷研究[D];北京交通大學(xué);2013年
8 陶大軍;發(fā)電電動(dòng)機(jī)靜止變頻器起動(dòng)強(qiáng)迫換流階段若干問題研究[D];哈爾濱理工大學(xué);2013年
9 郭捷;模塊化多電平換流器在HVDC應(yīng)用的若干關(guān)鍵問題研究[D];浙江大學(xué);2013年
10 孫自強(qiáng);基于混沌分形理論的大型風(fēng)電機(jī)械故障診斷研究[D];沈陽(yáng)工業(yè)大學(xué);2013年
【二級(jí)參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 肖運(yùn)啟;賈淑娟;;我國(guó)海上風(fēng)電發(fā)展現(xiàn)狀與技術(shù)分析[J];華東電力;2010年02期
2 耿其東;周海;;江蘇近海風(fēng)電現(xiàn)狀及其發(fā)展趨勢(shì)[J];華東電力;2010年11期
3 梅曉川;陳亞莉;;航空飛行器維修技術(shù)發(fā)展綜述[J];航空發(fā)動(dòng)機(jī);2009年06期
4 周艷榮;張巍;宋強(qiáng);;國(guó)內(nèi)外海上風(fēng)電發(fā)展現(xiàn)狀及海域使用中的有關(guān)問題分析[J];海洋開發(fā)與管理;2011年07期
5 王賢琳;張華;;基于馬爾柯夫過程的機(jī)電設(shè)備有效性模型[J];機(jī)電工程;2008年06期
6 喬穎;魯宗相;徐飛;王小海;侯佑華;朱長(zhǎng)勝;;風(fēng)電場(chǎng)集成監(jiān)控平臺(tái)的研究[J];電力系統(tǒng)保護(hù)與控制;2011年06期
7 付超;朱凌;王慧;王毅;石新春;;風(fēng)電場(chǎng)并網(wǎng)在線預(yù)警系統(tǒng)研究[J];電力系統(tǒng)保護(hù)與控制;2011年17期
8 王成;王志新;;基于無線局域網(wǎng)的大型海上風(fēng)電場(chǎng)遠(yuǎn)程監(jiān)控系統(tǒng)設(shè)計(jì)[J];機(jī)電一體化;2007年05期
9 王之華;王志新;;大型風(fēng)力發(fā)電機(jī)組狀態(tài)監(jiān)測(cè)與控制技術(shù)研究[J];機(jī)電一體化;2008年11期
10 劉東升,王建民,孫家廣;工程更改管理的設(shè)計(jì)與實(shí)現(xiàn)[J];計(jì)算機(jī)集成制造系統(tǒng)-CIMS;2001年07期
相關(guān)重要報(bào)紙文章 前1條
1 趙華;[N];中國(guó)質(zhì)量報(bào);2011年
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 Martin Junginger;Andre Faaij;Wim C.Turkenburg;呂斌;;海上風(fēng)電場(chǎng)降低成本前景分析[J];上海電力;2007年04期
2 張毅強(qiáng);沈津;;漳浦六鰲海上風(fēng)電場(chǎng)建設(shè)可行性淺探[J];能源與環(huán)境;2009年02期
3 ;我國(guó)首座海上風(fēng)電場(chǎng)并網(wǎng)發(fā)電[J];云南電力技術(shù);2009年05期
4 埃文·施瓦茲;;美國(guó)最大海上風(fēng)電場(chǎng)為何難產(chǎn)?[J];科技創(chuàng)業(yè);2011年Z1期
5 邊曉燕;尹金華;符楊;;海上風(fēng)電場(chǎng)運(yùn)行維護(hù)策略優(yōu)化研究[J];華東電力;2012年01期
6 王毅;劉志鵬;王靖;余小明;張宇;;東海海上風(fēng)電場(chǎng)的運(yùn)行管理實(shí)踐與成果[J];電力與能源;2012年01期
7 ;海上風(fēng)電場(chǎng)有利于海洋生物多樣性[J];技術(shù)與市場(chǎng);2012年08期
8 胡榮;劉露;黃玲玲;符楊;;計(jì)及運(yùn)行維護(hù)的海上風(fēng)電場(chǎng)可靠性研究[J];上海電力學(xué)院學(xué)報(bào);2013年01期
9 ;世界最大海上風(fēng)電場(chǎng)運(yùn)行[J];電站輔機(jī);2013年03期
10 徐龍博;李煜東;汪少勇;楊莉;;海上風(fēng)電場(chǎng)數(shù)字化發(fā)展設(shè)想[J];電力系統(tǒng)自動(dòng)化;2014年03期
相關(guān)會(huì)議論文 前10條
1 王毅;劉志鵬;周彬;余小明;張宇;;海上風(fēng)電場(chǎng)運(yùn)行管理的實(shí)踐與探討[A];新形勢(shì)下長(zhǎng)三角能源面臨的新挑戰(zhàn)和新對(duì)策——第八屆長(zhǎng)三角能源論壇論文集[C];2011年
2 ;西-北歐海上風(fēng)電場(chǎng)投資成本統(tǒng)計(jì)[A];《電站信息》2009年第1期[C];2009年
3 葛燕;朱錫昶;李巖;;海上風(fēng)電場(chǎng)風(fēng)機(jī)支撐結(jié)構(gòu)防腐蝕對(duì)策[A];第十四屆中國(guó)海洋(岸)工程學(xué)術(shù)討論會(huì)論文集(下冊(cè))[C];2009年
4 黃維平;;我國(guó)海上風(fēng)電場(chǎng)開發(fā)面臨的機(jī)遇和挑戰(zhàn)及解決方案[A];第二屆全國(guó)海洋能學(xué)術(shù)研討會(huì)論文集[C];2009年
5 王鳳云;王輝;;國(guó)內(nèi)外海上風(fēng)電場(chǎng)現(xiàn)狀及其基礎(chǔ)設(shè)施研究[A];第十三屆中國(guó)科協(xié)年會(huì)第13分會(huì)場(chǎng)-海洋工程裝備發(fā)展論壇論文集[C];2011年
6 江建軍;;淺析海上風(fēng)電場(chǎng)運(yùn)維安全管理的特殊性[A];中國(guó)農(nóng)業(yè)機(jī)械工業(yè)協(xié)會(huì)風(fēng)能設(shè)備分會(huì)2013年度論文集(上)[C];2013年
7 方濤;黃維學(xué);;大型海上風(fēng)電機(jī)組的運(yùn)輸、安裝和維護(hù)的研究[A];中國(guó)農(nóng)業(yè)機(jī)械工業(yè)協(xié)會(huì)風(fēng)能設(shè)備分會(huì)2013年度論文集(上)[C];2013年
8 江建軍;;淺析海上風(fēng)電場(chǎng)運(yùn)維安全管理的特殊性[A];2013電力行業(yè)信息化年會(huì)論文集[C];2013年
9 方濤;黃維學(xué);;大型海上風(fēng)電機(jī)組的運(yùn)輸、安裝和維護(hù)的研究[A];中國(guó)農(nóng)機(jī)工業(yè)協(xié)會(huì)風(fēng)能設(shè)備分會(huì)《風(fēng)能產(chǎn)業(yè)》(2013年第7期)[C];2013年
10 楊建軍;;大型海上風(fēng)電場(chǎng)開發(fā)對(duì)電氣設(shè)計(jì)的挑戰(zhàn)[A];2010年度電氣學(xué)術(shù)交流會(huì)議論文集[C];2010年
相關(guān)重要報(bào)紙文章 前10條
1 伊能;聚焦世界首座大型海上風(fēng)電場(chǎng)[N];中國(guó)電力報(bào);2006年
2 通訊員 蔡慧 記者 賀耀堂;在連投資建設(shè)海上風(fēng)電場(chǎng)[N];連云港日?qǐng)?bào);2009年
3 班瑋;德國(guó)首個(gè)海上風(fēng)電場(chǎng)正式并網(wǎng)發(fā)電[N];中國(guó)石化報(bào);2010年
4 李新;丹麥建成世界最大海上風(fēng)電場(chǎng)[N];中國(guó)船舶報(bào);2010年
5 李積軒;韓國(guó)將耗資82億美元建大型海上風(fēng)電場(chǎng)[N];中國(guó)冶金報(bào);2010年
6 記者 徐舉;8個(gè)海上風(fēng)電場(chǎng)落戶莊河花園口[N];大連日?qǐng)?bào);2012年
7 張文藝 張惠敏;六鰲海上風(fēng)電場(chǎng)完成規(guī)劃編制[N];閩南日?qǐng)?bào);2013年
8 通訊員 張占奎 記者 劉津;海上風(fēng)電場(chǎng)送電系統(tǒng)與并網(wǎng)關(guān)鍵技術(shù)研究及應(yīng)用課題啟動(dòng)[N];國(guó)家電網(wǎng)報(bào);2013年
9 勵(lì)漪;首個(gè)大型海上風(fēng)電場(chǎng)示范項(xiàng)目啟動(dòng)[N];人民日?qǐng)?bào);2007年
10 王玲;全力推進(jìn)海上風(fēng)電場(chǎng)項(xiàng)目建設(shè)[N];威海日?qǐng)?bào);2008年
相關(guān)博士學(xué)位論文 前2條
1 何大清;基于直流串聯(lián)的海上風(fēng)電場(chǎng)及其控制[D];上海交通大學(xué);2013年
2 王國(guó)強(qiáng);基于VSC-HVDC海上風(fēng)電場(chǎng)并網(wǎng)控制研究[D];上海交通大學(xué);2012年
相關(guān)碩士學(xué)位論文 前10條
1 陳寧;大型海上風(fēng)電場(chǎng)集電系統(tǒng)優(yōu)化研究[D];上海電力學(xué)院;2011年
2 李杰;海上風(fēng)電場(chǎng)的電網(wǎng)接入技術(shù)研究[D];安徽理工大學(xué);2011年
3 丁揚(yáng);海上風(fēng)電場(chǎng)應(yīng)用輕型直流輸電技術(shù)研究[D];沈陽(yáng)工業(yè)大學(xué);2012年
4 譚任深;海上風(fēng)電場(chǎng)集電系統(tǒng)的優(yōu)化設(shè)計(jì)[D];華南理工大學(xué);2013年
5 王梟龍;海上風(fēng)電場(chǎng)集電系統(tǒng)可靠性評(píng)估[D];華南理工大學(xué);2014年
6 孫君洋;大型海上風(fēng)電場(chǎng)內(nèi)部匯集網(wǎng)拓?fù)浣Y(jié)構(gòu)研究與設(shè)計(jì)[D];上海交通大學(xué);2014年
7 黎皓;基于可靠性理論的海上風(fēng)電場(chǎng)運(yùn)維研究[D];華北電力大學(xué);2014年
8 詹鵬;大型海上風(fēng)電場(chǎng)的混合多端直流并網(wǎng)技術(shù)研究[D];華中科技大學(xué);2013年
9 陳楠;海上風(fēng)電場(chǎng)升壓站電氣設(shè)計(jì)及其可靠性評(píng)估[D];華南理工大學(xué);2011年
10 黃子龍;風(fēng)電建模及海上風(fēng)電場(chǎng)并網(wǎng)規(guī)劃原則研究[D];華南理工大學(xué);2013年
,本文編號(hào):2442819
本文鏈接:http://sikaile.net/kejilunwen/dianlilw/2442819.html