電力工程設(shè)計(jì)中電氣主接線方案評(píng)估研究
[Abstract]:According to the national economic development and the international strategic needs, the electric power design enterprises of our country have participated in many domestic and foreign electric power engineering projects. In the power engineering design, the main electrical wiring scheme directly determines the overall technical economy of the project. Therefore, it is very important for designers to evaluate the main electrical wiring scheme. Based on the existing research, this paper studies the evaluation of the main electrical wiring scheme of 110kV substation project, and presents a set of evaluation methods of the main electrical wiring scheme suitable for all kinds of electric power engineering design. First, according to the standard specification, the evaluation method applies the environment and the evaluation calculation style to the evaluation method localization: based on the electrical main wiring design stage available data, divided into three aspects of reliability, expansibility, economic evaluation of simple engineering calculation. Then, a set of evaluation method is given from three aspects of reliability, expansibility and economy. Selecting the appropriate equipment state model, pointing out the problems existing in the application of the three methods recommended by the existing research, the minimum cut set method, the network method and the Monte Carlo method, in the power engineering design, and locating them according to the evaluation method. The second order fault analysis method of traditional analytical method is improved, and a reliability evaluation method is presented. By analyzing the extensibility meaning of the scheme, the paper abstracts the extensibility evaluation including the extension construction time point evaluation and the extension construction blackout power loss evaluation. From these two aspects, a method of extension evaluation is presented. This paper points out the problems existing in the conventional economic evaluation method and the minimum cost method, improves the total investment calculation of the minimum cost method, introduces the calculation of the outage loss cost of the extension construction, and gives a economic evaluation method. Finally, the concrete evaluation process of the whole method is demonstrated by an example.
【學(xué)位授予單位】:華中科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TM645
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉月仙;;全過程細(xì)化管理 提高電力工程設(shè)計(jì)質(zhì)量[J];科學(xué)之友;2011年19期
2 黃增宏;;電力工程設(shè)計(jì)數(shù)字化移交的實(shí)施案例[J];高科技與產(chǎn)業(yè)化;2009年08期
3 丁濤;;電力系統(tǒng)規(guī)劃設(shè)計(jì)在電力工程設(shè)計(jì)中的應(yīng)用[J];黑龍江科技信息;2012年15期
4 張連江;;電力系統(tǒng)規(guī)劃設(shè)計(jì)在電力工程設(shè)計(jì)中的應(yīng)用[J];黑龍江科技信息;2012年32期
5 華軍;;電力系統(tǒng)規(guī)劃設(shè)計(jì)在電力工程設(shè)計(jì)中的應(yīng)用[J];科技與企業(yè);2013年05期
6 李文棟;;電力工程設(shè)計(jì)中電力系統(tǒng)規(guī)劃設(shè)計(jì)的應(yīng)用[J];旅游縱覽(下半月);2013年01期
7 劉棟鋼;;電力工程設(shè)計(jì)中電力系統(tǒng)規(guī)劃設(shè)計(jì)的應(yīng)用[J];科技傳播;2013年10期
8 馬建鋒;;電力系統(tǒng)規(guī)劃設(shè)計(jì)在電力工程設(shè)計(jì)中的應(yīng)用探計(jì)[J];中華民居(下旬刊);2013年09期
9 徐昌致;;電力工程設(shè)計(jì)中設(shè)總工作的要點(diǎn)和體會(huì)[J];電力建設(shè);1992年08期
10 孫玲玲;;電力工程設(shè)計(jì)中的節(jié)電問題[J];上海電力;2007年06期
相關(guān)重要報(bào)紙文章 前2條
1 記者 桑學(xué)勇 通訊員 饒浩文;黑龍江電力工程設(shè)計(jì)評(píng)審平臺(tái)投運(yùn)[N];中國(guó)電力報(bào);2011年
2 記者 嚴(yán)運(yùn)濤 通訊員 丁繼斌 沈聰;我省規(guī)劃再建5座火電站[N];湖北日?qǐng)?bào);2011年
相關(guān)碩士學(xué)位論文 前1條
1 李焱威;電力工程設(shè)計(jì)中電氣主接線方案評(píng)估研究[D];華中科技大學(xué);2015年
,本文編號(hào):2418297
本文鏈接:http://sikaile.net/kejilunwen/dianlilw/2418297.html