多電網(wǎng)調(diào)峰的水火核電力系統(tǒng)網(wǎng)間出力分配方法
[Abstract]:Under the platform of large power grid, it is an important way to reduce the peak-shaving pressure of China's power grid by optimizing the allocation of resources to multiple power grids by using high-quality power sources. Because a single power station or even a unit usually takes on the task of transmitting power to several provincial networks, and is constrained by different provincial (municipal) power grid loads, and so on, it is very difficult for the power station to respond to the demand of multi-grid load regulation at the same time. Under the background of East China Power Grid, three methods of power distribution between power stations with peak-shaving as the control target are proposed. The first two methods establish different quadratic programming models based on the strategy of unified evaluation and peak-valley segment evaluation of the residual load of power network. In method 3, the relative ranking strategy of load is introduced, and the magnitude of load in the load sequence is taken as the heuristic information, and the load distribution is carried out. The simulated dispatching of direct-shunting power stations in East China Power Grid shows that all the three methods can effectively solve the problem of power generation distribution between power systems and give satisfactory peak-shaving results for multi-grid.
【作者單位】: 大連理工大學(xué);國家電網(wǎng)華東電力調(diào)控分中心;
【基金】:國家杰出青年基金(51025934) 國家自然科學(xué)基金項目(51209031) 中國博士后科學(xué)基金(2013T60284,2012M520626)~~
【分類號】:TM73
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王現(xiàn)勛;梅亞東;段文輝;楊娜;;抽水蓄能電站運行優(yōu)化模型[J];水電自動化與大壩監(jiān)測;2008年02期
2 溫鵬,萬永華;聯(lián)合電力系統(tǒng)中直調(diào)電廠子系統(tǒng)電力的經(jīng)濟(jì)分配研究[J];電力系統(tǒng)自動化;1999年23期
3 劉擁軍;王亮;王強;武彬;;華東電網(wǎng)抽水蓄能電站電能計劃安排方式優(yōu)化算法[J];電力系統(tǒng)自動化;2009年03期
4 裴哲義;伍永剛;紀(jì)昌明;李國春;;跨區(qū)域水電站群優(yōu)化調(diào)度初步研究[J];電力系統(tǒng)自動化;2010年24期
5 范明天,張祖平,楊少勇,劉映尚;具有抽水蓄能電廠的多區(qū)域電網(wǎng)日經(jīng)濟(jì)調(diào)度研究[J];電網(wǎng)技術(shù);2000年08期
6 何光宇,王稹,裴哲義,雷曉蒙,舒印彪,周雙喜,郭家春,陳雪青;三峽電力系統(tǒng)調(diào)峰問題的研究[J];電網(wǎng)技術(shù);2003年10期
7 譚忠富;陳廣娟;乞建勛;馮義;劉達(dá);;基于電力資源優(yōu)化配置的發(fā)電側(cè)峰谷分時電價研究[J];電網(wǎng)技術(shù);2008年07期
8 韓冬;蔡興國;;綜合環(huán)境保護(hù)及峰谷電價的水火電短期優(yōu)化調(diào)度[J];電網(wǎng)技術(shù);2009年14期
9 張寧;周天睿;段長剛;唐曉軍;黃建軍;盧湛;康重慶;;大規(guī)模風(fēng)電場接入對電力系統(tǒng)調(diào)峰的影響[J];電網(wǎng)技術(shù);2010年01期
10 王永強;周建中;莫莉;張睿;張勇傳;;基于機(jī)組綜合狀態(tài)評價策略的大型水電站精細(xì)化日發(fā)電計劃編制方法[J];電網(wǎng)技術(shù);2012年07期
【共引文獻(xiàn)】
相關(guān)期刊論文 前10條
1 裴哲義;紀(jì)昌明;;中國水庫優(yōu)化調(diào)度的成就與展望[J];水電自動化與大壩監(jiān)測;2011年03期
2 舒凱;印奇;楊寧;俞海國;楊繼;冶莉娟;;青海電網(wǎng)水調(diào)自動化系統(tǒng)解決方案設(shè)計與實現(xiàn)[J];水電自動化與大壩監(jiān)測;2012年02期
3 唐海華;胡挺;梅亞東;王建軍;劉俊偉;;長江上游控制型梯級水庫群聯(lián)合補償效益分析[J];水電自動化與大壩監(jiān)測;2012年03期
4 盛大凱;胡君慧;仇衛(wèi)東;;推廣風(fēng)電場電氣系統(tǒng)典型設(shè)計 促進(jìn)電源電網(wǎng)協(xié)調(diào)發(fā)展[J];電力建設(shè);2011年05期
5 李剛;程春田;蔡建章;蔡華祥;;云南電網(wǎng)日調(diào)度計劃編制系統(tǒng)[J];大連理工大學(xué)學(xué)報;2006年01期
6 廖勝利;程春田;蔡華祥;蔡建章;吳東平;;改進(jìn)的火電調(diào)峰方式[J];電力系統(tǒng)自動化;2006年01期
7 方陳;夏清;孫欣;;考慮大規(guī)模風(fēng)電接入的發(fā)電機(jī)組檢修計劃[J];電力系統(tǒng)自動化;2010年19期
8 孫榮富;張濤;梁吉;;電網(wǎng)接納風(fēng)電能力的評估及應(yīng)用[J];電力系統(tǒng)自動化;2011年04期
9 王成福;梁軍;張利;牛遠(yuǎn)方;,
本文編號:2365790