300MW機(jī)組脫硫系統(tǒng)能效分析及其優(yōu)化研究
本文選題:300MW機(jī)組 + 脫硫系統(tǒng); 參考:《華南理工大學(xué)》2015年碩士論文
【摘要】:從2003年以來(lái),我國(guó)環(huán)保工作取得了很大的成績(jī),但我國(guó)的能源結(jié)構(gòu)主要以煤炭為主,且能耗隨著國(guó)家經(jīng)濟(jì)發(fā)展而日趨上漲,導(dǎo)致了大氣污染物排放總量仍然高企。為此,《國(guó)家環(huán)境保護(hù)“十二五”規(guī)劃》提出主要污染物二氧化硫排放總量減少8%,燃煤火力發(fā)電廠綜合脫硫效率提高到93%以上要求。另一方面,我國(guó)各種能源儲(chǔ)藏量并不豐富,實(shí)際上石油和天然氣人均剩余可采儲(chǔ)量不足世界平均水平的10%,煤炭占比例多一些,但人均剩余可采儲(chǔ)量仍然達(dá)不到世界平均水平;為節(jié)約能源,國(guó)家從上世紀(jì)80年代開(kāi)始提出了節(jié)能發(fā)展的方針,開(kāi)始制定節(jié)能方面的法律和法規(guī),2000年之后,新《節(jié)約能源法》將“節(jié)能”定為我國(guó)的基本國(guó)策,節(jié)能工作已成為中國(guó)全員必須參與的事情。環(huán)保和節(jié)能都是基本國(guó)策,但在開(kāi)展過(guò)程中常常產(chǎn)生相矛盾,增加脫硫效率同時(shí)容易帶來(lái)能耗的增加,違反國(guó)家節(jié)能控制的大方向,同時(shí)增加發(fā)電企業(yè)生產(chǎn)成本,給發(fā)電企業(yè)經(jīng)營(yíng)帶來(lái)巨大的壓力。所以,在滿足國(guó)家減排要求的時(shí)候必須考慮節(jié)能優(yōu)化研究,爭(zhēng)取采用最節(jié)能的方式進(jìn)行環(huán)保提效改造和運(yùn)行。本文以某電廠300MW機(jī)組脫硫系統(tǒng)為研究對(duì)象,剖析系統(tǒng)構(gòu)成、分析影響系統(tǒng)能耗和脫硫效率的主要影響因素、研究節(jié)能和提高脫硫效率的途徑,對(duì)該機(jī)組按照國(guó)家環(huán)保要求提高脫硫效率改造方案進(jìn)行提效和節(jié)能協(xié)同優(yōu)化研究,并在改造后開(kāi)展了節(jié)能優(yōu)化運(yùn)行研究,取得了如下成果:(1)在提效改造前通過(guò)節(jié)能協(xié)同優(yōu)化研究,選定了能保證達(dá)到環(huán)保要求且最為節(jié)能的改造方案。改造實(shí)施后委托了權(quán)威第三方性能測(cè)試,結(jié)果表明:在負(fù)荷高于設(shè)計(jì)滿負(fù)荷值10%,入口SO2濃度高于設(shè)計(jì)值32%,同樣的石灰石消耗量的情況下,脫硫效率仍然達(dá)到了95.45%,比設(shè)計(jì)的91%脫硫效率高4.45%,也高于政府“十二五”規(guī)劃要求的93%。(2)在提效改造工程完成后,對(duì)脫硫系統(tǒng)進(jìn)行了節(jié)能優(yōu)化運(yùn)行研究,實(shí)施停運(yùn)部分漿液循環(huán)泵、停運(yùn)GGH低泄漏風(fēng)機(jī),以及停運(yùn)除霧器沖洗水泵方案。數(shù)據(jù)顯示:經(jīng)過(guò)節(jié)能優(yōu)化運(yùn)行后,每年最多可以節(jié)能電能2783168.25kW,如果按照每千瓦電能上網(wǎng)電價(jià)0.47元/千瓦時(shí)計(jì)算,則每年最多可以節(jié)省企業(yè)成本約1308089元。
[Abstract]:Since 2003, China has made great achievements in environmental protection work, but the energy structure of our country is mainly coal, and the energy consumption is increasing with the development of national economy, which leads to the high emission of atmospheric pollutants.Therefore, the 12th Five-Year Plan of National Environmental Protection proposed that the total emission of sulfur dioxide, a major pollutant, should be reduced by 8%, and the comprehensive desulfurization efficiency of coal-fired power plants should be raised to more than 93%.On the other hand, China is not rich in all kinds of energy reserves. In fact, the per capita remaining recoverable reserves of oil and natural gas are less than 10 percent of the world average, and the proportion of coal is more, but the per capita remaining recoverable reserves are still not up to the world average.In order to save energy, the state began to put forward the policy of energy conservation development in the 1980s, and began to formulate laws and regulations on energy conservation. After 2000, the new Energy Saving Law made "energy conservation" the basic national policy of our country.Energy-saving work has become the whole of China must participate in the matter.Environmental protection and energy conservation are basic state policies, but in the process of development, there are often contradictions. Increasing desulfurization efficiency will easily bring about an increase in energy consumption at the same time, which violates the general direction of national energy conservation control and increases the production costs of power generation enterprises.It brings great pressure to power generation enterprises.Therefore, to meet the national emission reduction requirements, we must consider energy conservation optimization research, and strive to use the most energy-saving way to improve environmental protection and operation.This paper takes the desulfurization system of 300MW unit in a power plant as the research object, analyzes the composition of the system, analyzes the main factors affecting the energy consumption and desulfurization efficiency of the system, and studies the ways to save energy and improve the desulfurization efficiency.According to the requirements of national environmental protection, the improvement of desulphurization efficiency was carried out to improve the efficiency and the coordinated optimization of energy saving was carried out, and the optimized operation of energy saving was carried out after the revamping.The following results are obtained: 1) by means of energy saving cooperative optimization research before improving the efficiency, the transformation scheme which can guarantee the environmental protection and save energy is selected.After the transformation was carried out, an authoritative third party performance test was commissioned. The results show that when the load is higher than the design full load value 10, the inlet SO2 concentration is higher than the design value 32 and the limestone consumption is the same.The desulphurization efficiency is still 95.455.The desulfurization efficiency is 4.45% higher than the designed 91% desulphurization efficiency, and it is also higher than the government's "12th Five-Year Plan" plan (93.f2) after the completion of the efficiency improvement project, the energy saving optimization operation of the desulfurization system and the implementation of the suspended partial slurry circulating pump have been carried out.Outage GGH low-leakage fan, and stop-off demister washing pump scheme.The data show that the maximum energy saving power can be 2783168.25kW per year after optimized operation. If calculated according to the electricity price of 0.47 yuan / kilowatt hour per kilowatt-hour, the enterprise cost can be saved about 1308089 yuan per year at most.
【學(xué)位授予單位】:華南理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:X773
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 顧然;;鋼包脫硫用固體渣料成分的確定及提高脫硫率的措施[J];河北冶金;1990年05期
2 張晉斌;電站脫硫技術(shù)綜述[J];華北電力技術(shù);2000年07期
3 陳明智;利用粉煤灰脫硫技術(shù)綜述[J];粉煤灰;2002年05期
4 鄺素萍,馬文石,李偉善;脫硫技術(shù)現(xiàn)狀及前景展望[J];廣東化工;2002年01期
5 李登新,高晉生,孟繁玲;電化學(xué)脫硫的熱力學(xué)分析[J];煤炭學(xué)報(bào);2002年03期
6 黃謙德;;爐內(nèi)增鈣脫硫若干問(wèn)題的探討[J];廣州環(huán)境科學(xué);2002年01期
7 王君成;;鎂脫硫工藝的應(yīng)用研究[J];馬鋼職工大學(xué)學(xué)報(bào);2002年03期
8 鐘毅,金峰,張鵬宇,曾漢才;模糊綜合評(píng)價(jià)在脫硫技術(shù)優(yōu)選中的應(yīng)用[J];電力環(huán)境保護(hù);2003年02期
9 毛健全,顧尚義,張啟厚,周茂基;對(duì)脫硫石灰?guī)r質(zhì)量要求初探[J];貴州地質(zhì);2003年04期
10 張林仙,劉遠(yuǎn)鵬;脫硫技術(shù)的發(fā)展概況[J];黃石高等專科學(xué)校學(xué)報(bào);2004年04期
相關(guān)會(huì)議論文 前10條
1 王亮;李春虎;侯影飛;魏曉斌;于英民;馮麗娟;;柴油氧化萃取脫硫工藝[A];中國(guó)化工學(xué)會(huì)2009年年會(huì)暨第三屆全國(guó)石油和化工行業(yè)節(jié)能節(jié)水減排技術(shù)論壇會(huì)議論文集(上)[C];2009年
2 劉鳳娟;蒼大強(qiáng);李春增;婁軍芳;;溫度對(duì)燒結(jié)脫硫影響的實(shí)驗(yàn)研究[A];第七屆全國(guó)工業(yè)爐學(xué)術(shù)年會(huì)論文集[C];2006年
3 張炳海;馮怒;陳金鳳;;脫硫系統(tǒng)運(yùn)行優(yōu)化及典型異常處理[A];第六屆電力工業(yè)節(jié)能減排學(xué)術(shù)研討會(huì)論文集[C];2011年
4 李斌;李聿軍;向華;張江萍;鄒節(jié)忠;劉江斌;;轉(zhuǎn)爐內(nèi)加錳鐵脫硫工藝的研究和實(shí)踐[A];2007年度泛珠三角十一省(區(qū))煉鋼連鑄年會(huì)論文專輯[C];2007年
5 強(qiáng)曉峰;;鎂法脫硫在燃油電廠的應(yīng)用[A];中國(guó)計(jì)量協(xié)會(huì)冶金分會(huì)2010年會(huì)論文集[C];2010年
6 胡輝;王文超;王珊珊;楊旗;陸僖;楊家寬;;鉛膏脫硫及其濾液中硫酸鈉回收利用的影響因素實(shí)驗(yàn)研究[A];中國(guó)環(huán)境科學(xué)學(xué)會(huì)2009年學(xué)術(shù)年會(huì)論文集(第二卷)[C];2009年
7 李強(qiáng)麟;;再議脫硫熟石膏質(zhì)量的控制[A];2009第四屆全國(guó)石膏生產(chǎn)與應(yīng)用技術(shù)交流大會(huì)暨展覽會(huì)論文集[C];2009年
8 董克平;;攀鋼西昌鋼釩脫硫工藝優(yōu)化與實(shí)踐[A];第十八屆(2014年)全國(guó)煉鋼學(xué)術(shù)會(huì)議論文集——S03:鐵水預(yù)處理[C];2014年
9 顧金芳;茅睿;林偉;;脫硫系統(tǒng)優(yōu)化運(yùn)行研究[A];第十屆中國(guó)科協(xié)年會(huì)論文集(二)[C];2008年
10 李秀忠;徐炳文;馬慶國(guó);;脫硫系統(tǒng)運(yùn)行可靠性的提高[A];全國(guó)火電300MW級(jí)機(jī)組能效對(duì)標(biāo)及競(jìng)賽第四十二屆年會(huì)論文集[C];2013年
相關(guān)重要報(bào)紙文章 前10條
1 本報(bào)記者 柳堯杰;電廠脫硫 非脫不可[N];萊蕪日?qǐng)?bào);2006年
2 梁約軍;氧氣頂吹轉(zhuǎn)爐煉鋼脫硫的理論與實(shí)踐[N];世界金屬導(dǎo)報(bào);2007年
3 記者 朱章安 通訊員 李紹衡;首個(gè)燒結(jié)脫硫項(xiàng)目衡鋼投運(yùn)[N];湖南日?qǐng)?bào);2009年
4 王少騰;氣動(dòng)脫硫系統(tǒng)運(yùn)行效率高[N];中國(guó)化工報(bào);2010年
5 解小如;與環(huán)境友好 讓世界更美[N];中國(guó)化工報(bào);2007年
6 李江濤 通訊員 韋建飛;脫硫率達(dá)95%以上[N];洛陽(yáng)日?qǐng)?bào);2007年
7 惠程華;全省最大脫硫減排項(xiàng)目近日開(kāi)工建設(shè)[N];甘肅日?qǐng)?bào);2008年
8 本報(bào)記者 李英姿;衡鋼“脫硫”環(huán)保技術(shù)好![N];衡陽(yáng)日?qǐng)?bào);2009年
9 費(fèi)慶勝 余志杰;福建三鋼燒結(jié)二期脫硫降本攻關(guān)效果顯著[N];中國(guó)冶金報(bào);2009年
10 鐘勇浜 黃慧錦;蒸餾裝置減頂氣脫硫率達(dá)99.99%[N];中國(guó)石化報(bào);2009年
相關(guān)博士學(xué)位論文 前1條
1 李艷平;循環(huán)流化床脫硫反應(yīng)器流動(dòng)特性的實(shí)驗(yàn)研究與數(shù)值模擬[D];天津大學(xué);2005年
相關(guān)碩士學(xué)位論文 前10條
1 劉強(qiáng);基于PKS的脫硫控制系統(tǒng)的設(shè)計(jì)與應(yīng)用[D];西安建筑科技大學(xué);2015年
2 丁圣亮;火電廠脫硫廢水蒸發(fā)工藝及對(duì)煙氣除塵脫硫的影響研究[D];西安建筑科技大學(xué);2015年
3 亢旭;微波脫硫?qū)捊姑好嘿|(zhì)影響的研究[D];中國(guó)礦業(yè)大學(xué);2015年
4 薛飛;功能化離子液體在油品脫硫中的應(yīng)用研究[D];新疆大學(xué);2015年
5 謝春雪;等離子體脫硫相關(guān)問(wèn)題分析及脫硫?qū)嶒?yàn)研究[D];武漢紡織大學(xué);2015年
6 易娟;電廠煙氣活性焦脫硫規(guī)律研究[D];華北電力大學(xué);2015年
7 梁國(guó)智;300MW機(jī)組脫硫系統(tǒng)能效分析及其優(yōu)化研究[D];華南理工大學(xué);2015年
8 趙常影;脫硫扒渣的組成特性與利用研究[D];東北大學(xué);2008年
9 鄧成平;重鋼新區(qū)焦?fàn)t煤氣脫硫工藝研究[D];重慶大學(xué);2007年
10 謝偉;廢鉛酸蓄電池鉛膏碳酸鹽化轉(zhuǎn)化脫硫及還原過(guò)程研究[D];安徽工業(yè)大學(xué);2011年
,本文編號(hào):1774058
本文鏈接:http://sikaile.net/kejilunwen/dianlilw/1774058.html