天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁(yè) > 科技論文 > 電力論文 >

熱電機(jī)組電功率限值計(jì)算方法及其在節(jié)能調(diào)度中的應(yīng)用

發(fā)布時(shí)間:2018-03-26 09:17

  本文選題:熱電機(jī)組 切入點(diǎn):電功率上下限 出處:《哈爾濱工業(yè)大學(xué)》2014年碩士論文


【摘要】:在風(fēng)力資源豐富的“三北”地區(qū),由于冬季寒冷,熱負(fù)荷需求大,電網(wǎng)中熱電機(jī)組比重大。隨著風(fēng)力發(fā)電的迅速發(fā)展,冬季時(shí)水電機(jī)組的枯水期、熱電機(jī)組的供暖期、風(fēng)電機(jī)組的大發(fā)期以及風(fēng)電的反調(diào)峰特性相互疊加,導(dǎo)致“三北”地區(qū)電網(wǎng)低谷調(diào)峰非常困難、棄風(fēng)現(xiàn)象時(shí)有發(fā)生。 常規(guī)機(jī)組(純凝機(jī)組和熱電機(jī)組)的強(qiáng)迫出力過(guò)大是造成棄風(fēng)的根本原因,而熱電機(jī)組的最小電功率過(guò)高又是常規(guī)機(jī)組強(qiáng)迫出力過(guò)大的主要原因。由此可見(jiàn),在保證機(jī)組安全運(yùn)行的前提下,準(zhǔn)確建立熱電機(jī)組電功率上下限與抽汽量之間的關(guān)系,降低熱電機(jī)組最小電功率,對(duì)減小電網(wǎng)棄風(fēng)、提高風(fēng)電利用率具有重要意義。 論文首先在詳細(xì)研究單抽、雙抽熱電機(jī)組汽輪機(jī)工況圖的基礎(chǔ)上,分別建立了各邊界限制工況線的方程式,分析了抽汽工況線變化時(shí)的輸出電功率變化,并通過(guò)對(duì)各條邊界限制工況線方程式的聯(lián)立求解,分別建立了單抽、雙抽熱電機(jī)組輸出電功率上下限與抽汽量的函數(shù)關(guān)系。 論文針對(duì)現(xiàn)有調(diào)度模型將熱電機(jī)組電功率上下限設(shè)為定值,經(jīng)常引起風(fēng)電棄風(fēng)這一問(wèn)題,基于已經(jīng)建立的熱電機(jī)組電功率上下限與抽汽量的函數(shù)關(guān)系,構(gòu)建了含熱電、火電和風(fēng)電機(jī)組,且熱電機(jī)組電功率上下限隨抽汽量變化而變化的新型節(jié)能調(diào)度模型。該模型目標(biāo)函數(shù)為優(yōu)先接納風(fēng)電,在保證棄風(fēng)最少的前提下使煤耗量最小。 然后,論文針對(duì)新型節(jié)能調(diào)度模型中等式約束條件較多,且有不定不等式約束這一特殊問(wèn)題,對(duì)現(xiàn)有的粒子群算法加以改進(jìn)。改進(jìn)后的粒子群算法將工業(yè)熱負(fù)荷平衡、采暖熱負(fù)荷平衡與電負(fù)荷平衡進(jìn)行了優(yōu)先級(jí)分級(jí),同時(shí)加入了負(fù)荷平衡約束預(yù)判、粒子下一位置預(yù)判和循環(huán)限時(shí)部分。實(shí)際優(yōu)化過(guò)程則分為兩步:先判斷是否會(huì)產(chǎn)生棄風(fēng),并預(yù)估棄風(fēng)量;然后計(jì)算煤耗量最少時(shí)的熱、電負(fù)荷優(yōu)化分配。 最后,論文編制了新型節(jié)能調(diào)度模型改進(jìn)粒子群法求解的程序,,并通過(guò)實(shí)例計(jì)算,與常規(guī)調(diào)度模型的對(duì)比分析,證明了本文調(diào)度模型能充分挖掘熱電機(jī)組調(diào)峰潛力、提高風(fēng)電利用率,具有較好的節(jié)能效果。
[Abstract]:In the "Sanbei" region with abundant wind power resources, due to the cold winter, the large demand for heat load and the large proportion of thermoelectric units in the power grid, with the rapid development of wind power generation, the low water period of hydropower units and the heating period of thermal power units in winter, Due to the superposition of the wind turbine and the anti-peak-shaving characteristics of wind power, it is very difficult to adjust the peak at the bottom of the "Sanbei" power grid, and the phenomenon of abandoning wind occurs from time to time. The excessive forced force of conventional units (pure condensing units and thermoelectric units) is the fundamental cause of the abandonment of air, and the high minimum electric power of the heat generating units is the main reason for the excessive forced output forces of the conventional units. On the premise of ensuring the safe operation of the units, the relationship between the upper and lower limits of electric power and the extraction capacity of the thermal power units is established accurately, and the minimum power of the thermal power units is reduced, which is of great significance to the reduction of the abandoned wind in the power grid and the improvement of the utilization rate of wind power. Firstly, on the basis of the detailed study on the working condition diagram of single and double extraction steam turbine, the equations of each boundary restricted working condition line are established, and the output electric power changes when the extraction working condition line changes are analyzed. By solving the equations of each boundary limit working condition line, the functional relationship between the output power upper and lower limits and the extraction capacity of single and double extraction units is established respectively. Aiming at the problem that the upper and lower limits of electric power of thermal power units are set to a certain value by the existing dispatching models, this paper often causes the problem of wind power abandonment. Based on the established functional relationship between the upper and lower limits of power and the extraction capacity of thermal power generating units, the thermoelectric power is constructed. A new energy-saving scheduling model for thermal power and wind turbine, and the upper and lower limits of electric power of thermal power units vary with the extraction capacity. The objective function of the model is to accept wind power first and to minimize coal consumption under the premise of ensuring the minimum abandoned wind. Then, aiming at the special problem that there are many equality constraints and uncertain inequality constraints in the new energy-saving scheduling model, the existing particle swarm optimization algorithm is improved. The improved particle swarm optimization algorithm balances the industrial heat load. The heating heat load balance and electric load balance are classified first, and the load balance constraint prediction is added, the next position prediction and the cycle time limit part of the particle are added. The actual optimization process is divided into two steps: first, to determine whether the abandoned wind will occur. The optimal distribution of heat and electricity load is calculated when the coal consumption is minimum. Finally, the program of improved particle swarm optimization method for new energy-saving dispatching model is developed, and the comparison between this model and the conventional scheduling model proves that the scheduling model can fully tap the peak shaving potential of thermal power units. Improving the utilization ratio of wind power has better energy-saving effect.
【學(xué)位授予單位】:哈爾濱工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TM621

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 張銀地;;SMARTPRO MACS系統(tǒng)在八鋼熱電的應(yīng)用[J];冶金動(dòng)力;2005年06期

2 沈金山;;造紙企業(yè)熱電機(jī)組的選型和發(fā)電節(jié)能效益計(jì)算[J];能源工程;1992年03期

3 涂永福;;熱電機(jī)組節(jié)能挖潛之實(shí)踐[J];中國(guó)設(shè)備工程;2008年01期

4 李俊峰,李志祥,郭雪瑞;雙抽風(fēng)循環(huán)硫化床熱電機(jī)組汽輪發(fā)電機(jī)基座施工技術(shù)[J];內(nèi)蒙古石油化工;2005年06期

5 鐘史明;;江蘇省提高小熱電經(jīng)濟(jì)效益的幾條經(jīng)驗(yàn)[J];能源研究與利用;1989年05期

6 鄔春明;牟曉敏;程亮;田章超;;熱電機(jī)組遠(yuǎn)程無(wú)線監(jiān)測(cè)系統(tǒng)研究與設(shè)計(jì)[J];自動(dòng)化儀表;2013年06期

7 蔡桂琴;Wuppertal-Elberfeld電廠的常壓循環(huán)床沸騰爐熱電機(jī)組[J];發(fā)電設(shè)備;1987年03期

8 呂泉;陳天佑;王海霞;于汀;李群;湯偉;;配置儲(chǔ)熱后熱電機(jī)組調(diào)峰能力分析[J];電力系統(tǒng)自動(dòng)化;2014年11期

9 張利燕,?≌,馬東偉,柴玉成,陳巖;漏氫檢測(cè)裝置在200MW熱電機(jī)組上的應(yīng)用[J];河北電力技術(shù);2000年04期

10 尹錦虎;熱電機(jī)組疏水回收方法[J];節(jié)能;2003年07期

相關(guān)會(huì)議論文 前3條

1 涂永福;;熱電機(jī)組節(jié)能挖潛之實(shí)踐[A];中國(guó)設(shè)備工程專家代表會(huì)議論文集[C];2007年

2 黃奇峰;錢立軍;;網(wǎng)絡(luò)化能源計(jì)量在熱電管理信息系統(tǒng)中的應(yīng)用[A];2010江蘇省“能源計(jì)量與節(jié)能減排”論壇論文集[C];2010年

3 錢明毅;梁忠;;不銹鋼三維螺旋交叉換熱管在50MW熱電機(jī)組上的改造應(yīng)用[A];《電站信息》2012年第5期[C];2012年

相關(guān)重要報(bào)紙文章 前10條

1 記者 李虎成 通訊員 趙同增 鹿秀輝 代娟;孟電集團(tuán)熱電機(jī)組成功并網(wǎng)發(fā)電[N];河南日?qǐng)?bào);2010年

2 李文絢;大地基礎(chǔ)擬35.2億元投資熱電[N];中國(guó)證券報(bào);2007年

3 記者 李松戰(zhàn) 特約記者 劉小江;新電熱電機(jī)組可研報(bào)告獲通過(guò)[N];洛陽(yáng)日?qǐng)?bào);2009年

4 記者 王海平;大唐林州2×300MW級(jí)熱電機(jī)組工程開(kāi)工[N];安陽(yáng)日?qǐng)?bào);2009年

5 鹿秀輝;孟電集團(tuán)2×30萬(wàn)千瓦第一臺(tái)熱電機(jī)組一次點(diǎn)火成功并網(wǎng)發(fā)電[N];新鄉(xiāng)日?qǐng)?bào);2010年

6 劉煥杰 丁龍飛;滄州將建兩臺(tái)20萬(wàn)熱電機(jī)組[N];華北電力報(bào);2003年

7 記者 賴文忠 實(shí)習(xí)生 黃瓊芬;國(guó)內(nèi)最大熱電機(jī)組成功對(duì)外供熱[N];福建日?qǐng)?bào);2011年

8 本報(bào)記者 賈科華;小熱電成替罪“羔羊”[N];中國(guó)能源報(bào);2012年

9 李松戰(zhàn) 張謙;在新區(qū)建設(shè) 2×60萬(wàn)千瓦熱電機(jī)組[N];洛陽(yáng)日?qǐng)?bào);2009年

10 通訊員姚吉文;投資30億建2×350MW熱電機(jī)組[N];昌吉日?qǐng)?bào)(漢);2012年

相關(guān)碩士學(xué)位論文 前5條

1 許政強(qiáng);熱電機(jī)組電功率限值計(jì)算方法及其在節(jié)能調(diào)度中的應(yīng)用[D];哈爾濱工業(yè)大學(xué);2014年

2 王思寧;熱電機(jī)組參與東北電力市場(chǎng)競(jìng)爭(zhēng)的方案分析[D];華北電力大學(xué)(北京);2007年

3 禹超;母管制熱電機(jī)組負(fù)荷優(yōu)化分配方法研究[D];哈爾濱工業(yè)大學(xué);2011年

4 胡佳;基于合作博弈解的調(diào)峰成本補(bǔ)償研究[D];哈爾濱工業(yè)大學(xué);2013年

5 初曉明;熱電機(jī)組運(yùn)行性能監(jiān)測(cè)算法與監(jiān)控組態(tài)軟件研究開(kāi)發(fā)[D];山東大學(xué);2008年



本文編號(hào):1667274

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/dianlilw/1667274.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶a7c69***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com