750kV雙回平行線路間感應(yīng)電壓和感應(yīng)電流的計(jì)算與實(shí)測研究
發(fā)布時(shí)間:2018-03-12 21:46
本文選題:平行線路 切入點(diǎn):感應(yīng)電壓 出處:《高壓電器》2014年12期 論文類型:期刊論文
【摘要】:應(yīng)用EMTP對(duì)750 k V長距離檢修狀況下平行線路間感應(yīng)電壓和電流的計(jì)算,并進(jìn)行實(shí)測,著重研究了檢修線路接地?cái)?shù)量對(duì)感應(yīng)電壓和感應(yīng)電流的影響。結(jié)果表明:檢修線路的接地?cái)?shù)量與感應(yīng)電壓關(guān)系不大,與感應(yīng)電流有很大關(guān)系;當(dāng)在檢修線路作業(yè)點(diǎn)工作時(shí),除了線路兩端變電站接地和作業(yè)點(diǎn)接地外,還需合理的布置作業(yè)段兩端臨時(shí)接地線。
[Abstract]:The inductive voltage and current between parallel lines under the condition of long distance overhaul of 750kV are calculated by EMTP and measured. The influence of the number of grounding on inductive voltage and inductive current is studied. The results show that the number of grounding is not related to inductive voltage, but to inductive current. In addition to grounding at both ends of the line substation and operation point, it is necessary to arrange the temporary ground wires at both ends of the working section reasonably.
【作者單位】: 新疆電力科學(xué)研究院;
【分類號(hào)】:TM751
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李斌,曹榮江,,顧霓鴻;關(guān)于同桿雙回線檢修回路中接地開關(guān)開斷工況的研究[J];電網(wǎng)技術(shù);1995年01期
2 張文亮,谷定燮,方文弟,韓曉言;洪龍500kV帶高抗同桿雙回線路間的感應(yīng)作用研究[J];高電壓技術(shù);2002年02期
3 韓彥華;黃曉民;杜秦生;;同桿雙回線路感應(yīng)電壓和感應(yīng)電流測量與計(jì)算[J];高電壓技術(shù);2007年01期
4 胡丹暉;涂彩琪;蔣偉;柴雅靜;;500kV同桿并架線路感應(yīng)電壓和電流的計(jì)算分析[J];高電壓技術(shù);2008年09期
5 王身麗;韓浩;翁永春;;500kV架空輸電線路感應(yīng)電仿真計(jì)算方法[J];湖北電力;2009年05期
6 盧波;;500kV福建與浙江加強(qiáng)聯(lián)網(wǎng)工程系統(tǒng)感應(yīng)電壓和電流問題研究[J];華東電力;2007年04期
7 王健;張嘉e