關(guān)于農(nóng)村配電臺(tái)區(qū)的智能化研究

發(fā)布時(shí)間:2018-02-27 18:03

  本文關(guān)鍵詞: 智能配電臺(tái)區(qū) 智能配電終端 三相不平衡治理 無功補(bǔ)償 低壓配電自動(dòng)化 出處:《山東大學(xué)》2014年碩士論文 論文類型:學(xué)位論文


【摘要】:智能臺(tái)區(qū)建設(shè)是智能電網(wǎng)建設(shè)的基礎(chǔ)。但目前配電臺(tái)區(qū)設(shè)備自動(dòng)化程度較低,不滿足智能電網(wǎng)建設(shè)需要。為了適應(yīng)農(nóng)村用電發(fā)展和用電可靠性、電能質(zhì)量的新要求,需要對(duì)配電臺(tái)區(qū)進(jìn)行改造,以適應(yīng)電網(wǎng)智能化愿景。 本文分析國(guó)內(nèi)外研究現(xiàn)狀,從負(fù)荷變化、供需矛盾、新能源接入等方面論述了農(nóng)村智能配電臺(tái)區(qū)建設(shè)的必要性和重要意義。對(duì)智能配電臺(tái)區(qū)的功能實(shí)現(xiàn)進(jìn)行研究和分析,對(duì)智能臺(tái)區(qū)統(tǒng)一數(shù)據(jù)平臺(tái)和配電智能終端技術(shù)進(jìn)行介紹,指出現(xiàn)有技術(shù)在三相不平衡治理、低壓自動(dòng)化等方面存在的不足。針對(duì)這些問題提出臺(tái)區(qū)三相不平衡治理、低壓自動(dòng)化、無功補(bǔ)償、智能臺(tái)區(qū)運(yùn)維等重要技術(shù)方案。重點(diǎn)提出一種利用相間負(fù)荷調(diào)整型二級(jí)漏電保護(hù)器調(diào)整三相不平衡負(fù)荷的新技術(shù)。智能二級(jí)漏保安裝在配電臺(tái)區(qū)低壓?jiǎn)蜗嚯娫碩接處,在智能配變終端的控制下實(shí)現(xiàn)自動(dòng)調(diào)整,一個(gè)配電臺(tái)區(qū)的智能變終端控制該臺(tái)區(qū)全部的智能二級(jí)漏保。智能二級(jí)漏保通訊模塊采用有線或無線方式,與智能配變終端進(jìn)行電流信息與指令的傳遞。智能配變終端收到各智能二級(jí)漏保運(yùn)行電流后,進(jìn)行臺(tái)區(qū)三相負(fù)載電流計(jì)算,得出三相不平衡度。當(dāng)智能變終端計(jì)算三相電流不平衡率值達(dá)到或超過設(shè)定值時(shí),根據(jù)設(shè)定數(shù)學(xué)運(yùn)算,確定各漏電保護(hù)器所帶單相負(fù)載是否需要調(diào)整,以及調(diào)相方案,命令指定智能二級(jí)漏保選相開關(guān)動(dòng)作,實(shí)現(xiàn)負(fù)載由負(fù)荷較重的相轉(zhuǎn)至負(fù)荷較輕的相,使得該低壓網(wǎng)絡(luò)的三相負(fù)荷始終處于接近最佳平衡的狀態(tài)。本文對(duì)該方案進(jìn)行了算法的模擬和驗(yàn)證。 本文提出的技術(shù)方案在居嶺莊臺(tái)區(qū)進(jìn)行了改造應(yīng)用,通過應(yīng)用前后效果對(duì)比,改造后在臺(tái)區(qū)三相負(fù)荷平衡、電壓合格率、供電可靠性方面有顯著提升。運(yùn)維人員實(shí)現(xiàn)了對(duì)臺(tái)區(qū)環(huán)境的遠(yuǎn)程監(jiān)控,效果明顯,實(shí)現(xiàn)了部分智能化功能。
[Abstract]:The construction of smart station area is the foundation of the construction of smart grid. But at present, the automation degree of the equipment in the distribution station area is low, which does not meet the needs of the smart grid construction. In order to meet the new requirements of rural power development and reliability, power quality, It is necessary to transform the distribution station area to meet the intelligent vision of power grid. This paper analyzes the current research situation at home and abroad, discusses the necessity and significance of the construction of rural intelligent radio station area from the aspects of load change, contradiction between supply and demand, and new energy access, and studies and analyzes the function realization of intelligent distribution station area. This paper introduces the unified data platform and intelligent terminal technology of intelligent station, points out the shortcomings of the existing technology in the aspects of three-phase unbalanced treatment and low-voltage automation, and puts forward the three-phase unbalanced treatment of station area. Low voltage automation, reactive power compensation, This paper puts forward a new technology to adjust the unbalance load of three-phase by using the phase-to-phase load adjusting two-stage leakage protector. The intelligent two-stage leakage protection is installed at the T junction of the low-voltage single-phase power supply in the distribution station area. Under the control of the intelligent distribution transformer terminal, the intelligent transformer terminal in a distribution station area controls all the intelligent secondary leakage protection in the station area. The intelligent secondary leakage protection communication module adopts wired or wireless mode. The intelligent distribution transformer terminal carries on the current information and instruction transmission with the intelligent distribution transformer terminal. After the intelligent distribution transformer terminal receives the operation current of each intelligent secondary leakage protection, it calculates the three-phase load current in the station area. When the intelligent terminal calculates that the unbalance rate of three-phase current reaches or exceeds the set value, according to the set mathematical operation, determines whether the single-phase load of each leakage protector needs to be adjusted, as well as the phase modulation scheme. The command specifies the operation of the intelligent two stage leakage phase selector switch to transfer the load from the heavier phase to the lighter one. The three-phase load of the low-voltage network is always close to the optimal balance. The algorithm is simulated and verified in this paper. The technical scheme put forward in this paper has been applied to the reconstruction of Julingzhuang Tai area. By comparing the effect before and after the application, the three-phase load balance and the qualified voltage rate are obtained after the retrofit. The reliability of power supply has been greatly improved. The operation and maintenance personnel have realized the remote monitoring and control of the environment of the station area, the effect is obvious, and some intelligent functions have been realized.
【學(xué)位授予單位】:山東大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TM727.1;TM76

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 張春喜;李朝陽;;農(nóng)網(wǎng)智能化配電臺(tái)區(qū)建設(shè)[J];大眾用電;2012年03期

2 梁榮春;配電臺(tái)區(qū)未通過驗(yàn)收的原因及對(duì)策[J];農(nóng)電管理;2002年06期

3 張權(quán)銘;;鄉(xiāng)村電網(wǎng)配電臺(tái)區(qū)建設(shè)[J];農(nóng)村電氣化;2007年01期

4 王帥;張峰;;配電臺(tái)區(qū)改造及應(yīng)用[J];農(nóng)村電氣化;2011年01期

5 岳紅權(quán);吳仰宇;李玉成;;農(nóng)網(wǎng)智能化配電臺(tái)區(qū)建設(shè)的研究與探討[J];陜西電力;2011年04期

6 張春喜;李朝陽;韓善起;;農(nóng)網(wǎng)智能化配電臺(tái)區(qū)建設(shè)初探[J];農(nóng)村電工;2012年02期

7 戴秀標(biāo);秦立剛;;智能化配電臺(tái)區(qū)在山區(qū)建設(shè)應(yīng)用[J];農(nóng)村電氣化;2013年10期

8 盧峰;王震宇;沈駿;章堅(jiān)民;陳清泰;邢翼;劉笑園;;面向農(nóng)村電網(wǎng)的智能配電臺(tái)區(qū)及其應(yīng)用[J];上海電力學(xué)院學(xué)報(bào);2014年S1期

9 趙正友,曹志剛,管秋芬;農(nóng)村配電臺(tái)區(qū)安裝過程中應(yīng)注意的一些問題[J];農(nóng)村電氣化;1998年12期

10 王國(guó)強(qiáng);;農(nóng)網(wǎng)智能配電臺(tái)區(qū)建設(shè)與實(shí)施淺析[J];農(nóng)村電工;2013年05期

相關(guān)會(huì)議論文 前4條

1 匡少龍;王立新;;配電臺(tái)區(qū)的電量電費(fèi)分析對(duì)配電臺(tái)區(qū)經(jīng)濟(jì)運(yùn)行的啟示[A];華東六省一市電機(jī)(電力)工程學(xué)會(huì)輸配電技術(shù)研討會(huì)2006年年會(huì)論文集[C];2006年

2 陳雪蓮;廖敏;;贛州電網(wǎng)智能配電臺(tái)區(qū)通信方式探討[A];2013電力行業(yè)信息化年會(huì)論文集[C];2013年

3 陳雪蓮;廖敏;;贛州電網(wǎng)智能配電臺(tái)區(qū)通信方式探討[A];2013電力行業(yè)信息化年會(huì)論文集[C];2013年

4 張衛(wèi)東;;縣城配變臺(tái)區(qū)設(shè)計(jì)[A];第十五屆華東六省一市電機(jī)工程(電力)學(xué)會(huì)輸配電技術(shù)研討會(huì)論文集[C];2007年

相關(guān)重要報(bào)紙文章 前5條

1 羅斌;大悟城區(qū)公用配電臺(tái)區(qū)加裝“雙保險(xiǎn)”[N];中國(guó)電力報(bào);2005年

2 通訊員 羅斌;專用配電臺(tái)區(qū)預(yù)付費(fèi)計(jì)量裝置引來回頭客[N];中國(guó)電力報(bào);2006年

3 劉俊!●T楠;新鄉(xiāng)將對(duì)2770個(gè)配電臺(tái)區(qū)進(jìn)行治理[N];國(guó)家電網(wǎng)報(bào);2013年

4 記者 李莉;為工程順利實(shí)施創(chuàng)造良好條件[N];周口日?qǐng)?bào);2008年

5 李文華;滎陽農(nóng)網(wǎng)完善工程竣工[N];國(guó)家電網(wǎng)報(bào);2009年

相關(guān)碩士學(xué)位論文 前3條

1 高甲勇;關(guān)于農(nóng)村配電臺(tái)區(qū)的智能化研究[D];山東大學(xué);2014年

2 邢鴻峰;無線配電臺(tái)區(qū)電能采控系統(tǒng)的設(shè)計(jì)[D];內(nèi)蒙古大學(xué);2012年

3 劉衛(wèi)兵;農(nóng)村智能配電臺(tái)區(qū)典型建設(shè)方案研究[D];華北電力大學(xué);2012年

,

本文編號(hào):1543737

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/dianlilw/1543737.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶1696a***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com