基于在線監(jiān)測(cè)系統(tǒng)的架空線路覆冰力學(xué)模型及其應(yīng)用

發(fā)布時(shí)間:2018-02-21 00:44

  本文關(guān)鍵詞: 覆冰 稱重法 風(fēng)偏角 傾斜角 影響因素 耐張塔 工程應(yīng)用 出處:《華南理工大學(xué)》2014年碩士論文 論文類型:學(xué)位論文


【摘要】:目前的輸電線路覆冰監(jiān)測(cè)技術(shù)大多基于稱重法原理進(jìn)行,該方法簡(jiǎn)單、直接、技術(shù)應(yīng)用相對(duì)成熟,因而被廣泛用于國(guó)內(nèi)的架空線路覆冰在線監(jiān)測(cè)系統(tǒng)中。南方電網(wǎng)輸電線路災(zāi)害(覆冰)預(yù)警系統(tǒng)雖然應(yīng)用了基于稱重法的直線塔覆冰計(jì)算模型,但對(duì)角度、拉力傳感器誤差及個(gè)數(shù)、垂直檔距等因素的影響規(guī)律未細(xì)致考慮,且沒(méi)有提出耐張塔的覆冰計(jì)算模型和考慮其模型各種因素的影響,造成覆冰監(jiān)測(cè)系統(tǒng)直線塔模型不完善,耐張塔無(wú)法監(jiān)測(cè)的問(wèn)題。 本論文首先介紹了南方電網(wǎng)輸電線路災(zāi)害(覆冰)預(yù)警系統(tǒng)的總體結(jié)構(gòu)及其存在的問(wèn)題。針對(duì)應(yīng)用于覆冰監(jiān)測(cè)系統(tǒng)原有的直線塔計(jì)算模型不完善問(wèn)題,,將直線塔計(jì)算模型細(xì)化為I串、雙I串、V串、雙V串和八字串等五種串型下的模型,對(duì)包括風(fēng)偏角及傾斜角、拉力傳感器誤差、垂直檔距和拉力傳感器個(gè)數(shù)等直線塔計(jì)算模型影響因素進(jìn)行了分析。針對(duì)覆冰監(jiān)測(cè)系統(tǒng)缺少耐張塔覆冰計(jì)算模型的問(wèn)題,本論文提出了耐張塔理論計(jì)算模型和簡(jiǎn)化計(jì)算模型,并分別對(duì)不同位置的張力、代表檔距和風(fēng)偏角三個(gè)因素對(duì)覆冰計(jì)算的影響進(jìn)行了不同覆冰工況下的研究,驗(yàn)證了簡(jiǎn)化計(jì)算模型。最后采用圖像與冰厚變化曲線對(duì)比分析的方法,驗(yàn)證了架空線路直線塔和耐張塔覆冰計(jì)算模型工程具有良好的應(yīng)用效果,并闡述了工程應(yīng)用中模型存在的問(wèn)題及解決方案。 在分析覆冰模型影響因素時(shí),由于模型的參數(shù)、不同電壓等級(jí)線路較多,設(shè)計(jì)條件下的導(dǎo)線張力及覆冰工況也多種多樣,導(dǎo)致不可能對(duì)所有情況進(jìn)行全部分析,因此得到的結(jié)論的一般性還有待進(jìn)一步提高。
[Abstract]:Most of the current ice monitoring techniques for transmission lines are based on the weighing method. This method is simple, direct, and its application is relatively mature. Therefore, it is widely used in the on-line monitoring system of overhead line icing in China. Although the transmission line disaster (icing) early warning system of Southern Power Grid applies the calculation model of linear tower icing based on weighing method, the angle of the system is analyzed. The influence of the error and number of tension sensors, vertical spacing and other factors are not considered carefully, and the calculation model of icing of tension tower is not put forward, and the influence of various factors on the model is considered, which results in the imperfect model of line tower of icing monitoring system. A problem that cannot be monitored by a tensioning tower. This paper first introduces the overall structure and existing problems of the transmission line disaster (icing) early warning system in Southern Power Grid, aiming at the imperfect calculation model of the linear tower used in the icing monitoring system. The calculation model of linear tower is divided into five types: I string, double I string V string, double V string and eight character string. The influence factors of linear tower calculation model, such as vertical distance and the number of tension sensors, are analyzed. In view of the lack of icing calculation model of tension tower in icing monitoring system, the theoretical calculation model and simplified calculation model of tension tower are put forward in this paper. The effects of three factors, namely tension at different positions, distance between wind and wind, on the calculation of icing are studied under different icing conditions, and the simplified calculation model is verified. Finally, the method of contrast analysis between image and ice thickness variation curve is adopted. It is verified that the calculation model engineering of overhead line tower and tension tower has good application effect, and the problems and solutions of the model in engineering application are expounded. When analyzing the influencing factors of the icing model, because of the parameters of the model, there are more lines with different voltage levels, the lead tension and icing conditions under the design conditions are also varied, which makes it impossible to analyze all the cases. Therefore, the generality of the conclusion needs to be further improved.
【學(xué)位授予單位】:華南理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TM752

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 蔣興良;;貴州電網(wǎng)冰災(zāi)事故分析及預(yù)防措施[J];電力建設(shè);2008年04期

2 邵瑰瑋;胡毅;王力農(nóng);易輝;;輸電線路覆冰監(jiān)測(cè)系統(tǒng)應(yīng)用現(xiàn)狀及效果[J];電力設(shè)備;2008年06期

3 黃新波;孫欽東;程榮貴;張冠軍;劉家兵;;導(dǎo)線覆冰的力學(xué)分析與覆冰在線監(jiān)測(cè)系統(tǒng)[J];電力系統(tǒng)自動(dòng)化;2007年14期

4 侯慧;尹項(xiàng)根;陳慶前;游大海;童光毅;邵德軍;;南方部分500kV主網(wǎng)架2008年冰雪災(zāi)害中受損分析與思考[J];電力系統(tǒng)自動(dòng)化;2008年11期

5 陸佳政;蔣正龍;雷紅才;張紅先;彭繼文;李波;方針;;湖南電網(wǎng)2008年冰災(zāi)事故分析[J];電力系統(tǒng)自動(dòng)化;2008年11期

6 邢毅;曾奕;盛戈v

本文編號(hào):1520509


資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/dianlilw/1520509.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶c56e0***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com