【摘要】:火電廠是一次能源耗費(fèi)大戶,為保證火電廠在同行業(yè)中的競爭力,適應(yīng)國家的可持續(xù)發(fā)展戰(zhàn)略要求,需要對發(fā)電企業(yè)的運(yùn)行特性以及優(yōu)化進(jìn)行深入研究。為此,本文以某電廠#8機(jī)組為研究對象,開展噴嘴配汽機(jī)組現(xiàn)場試驗(yàn)、動態(tài)特性建模、熱經(jīng)濟(jì)性分析以及配汽優(yōu)化等方面的相關(guān)工作。首先,進(jìn)行對象機(jī)組的現(xiàn)場試驗(yàn),包括汽機(jī)負(fù)荷階躍響應(yīng)試驗(yàn)、深度調(diào)峰試驗(yàn)以及快速調(diào)峰試驗(yàn),得到汽機(jī)不同負(fù)荷下調(diào)節(jié)閥的階躍響應(yīng)特性,同時在保證機(jī)組運(yùn)行安全的前提下通過快速升降負(fù)荷試驗(yàn)手動獲得了高速調(diào)峰時允許的最快升降負(fù)荷速率,為同類機(jī)組提供了參考,并為后續(xù)建模、調(diào)試及優(yōu)化工作提供試驗(yàn)數(shù)據(jù)。其次,基于APROS分析型支撐平臺,利用機(jī)組設(shè)計(jì)數(shù)據(jù)建立汽輪機(jī)及其熱力系統(tǒng)模型,并通過模型試驗(yàn)計(jì)算獲得的機(jī)組動態(tài)特性與現(xiàn)場特性試驗(yàn)的數(shù)據(jù)進(jìn)行對比,驗(yàn)證模型的可靠性。基于建立的APROS詳細(xì)計(jì)算模型,針對不同典型工況定量分析對機(jī)組經(jīng)濟(jì)性的影響因素,包括初壓、初溫和背壓,獲得各因素對功率和熱耗率的影響曲線以及修正曲線,為現(xiàn)場不同工況下的經(jīng)濟(jì)性分析提供參考。然后,通過詳細(xì)的變工況計(jì)算獲得調(diào)節(jié)閥的綜合流量系數(shù)曲線以及調(diào)節(jié)閥和調(diào)節(jié)級的組合特性曲線,建立了其理論計(jì)算模型,并基于理論計(jì)算模型對仿真模型進(jìn)行調(diào)節(jié)閥和調(diào)節(jié)級的調(diào)試,在以往重疊度研究的基礎(chǔ)上,將仿真模型計(jì)算數(shù)據(jù)與現(xiàn)場調(diào)節(jié)閥特性試驗(yàn)數(shù)據(jù)進(jìn)行對比驗(yàn)證仿真模型的可靠性。在此基礎(chǔ)上,聯(lián)合采用負(fù)荷和閥位的思想,對機(jī)組進(jìn)行配汽優(yōu)化研究,獲得機(jī)組多種配汽方式下的熱耗變化曲線,通過與現(xiàn)場實(shí)際運(yùn)行數(shù)據(jù)對比表明優(yōu)化的可行性,進(jìn)而得到機(jī)組最佳配汽方式和最優(yōu)初壓曲線,并建立了機(jī)組熱耗率隨主汽壓力變化的理論數(shù)學(xué)模型,其結(jié)論可用于指導(dǎo)機(jī)組現(xiàn)場試驗(yàn),為現(xiàn)場實(shí)際運(yùn)行曲線的進(jìn)一步優(yōu)化提供方向。針對對象機(jī)組背壓受季節(jié)影響大的問題,根據(jù)機(jī)組最佳配汽方式基于所建模型獲得機(jī)組最優(yōu)初壓曲線簇以及背壓對主汽壓力的邏輯修正參考曲線。最后,引進(jìn)先進(jìn)的螢火蟲智能優(yōu)化算法,探討了其與標(biāo)準(zhǔn)粒子群算法在解決不同優(yōu)化問題時的優(yōu)劣,根據(jù)機(jī)組配汽優(yōu)化前后獲得的煤耗特性曲線,驗(yàn)證螢火蟲算法相對于傳統(tǒng)算法在解決此類問題上的有效性,并根據(jù)電網(wǎng)調(diào)度要求在機(jī)組不同最快升降負(fù)荷速率的限制下計(jì)算獲得全廠的負(fù)荷經(jīng)濟(jì)分配方案。
[Abstract]:Thermal power plant is a major consumer of primary energy. In order to ensure the competitiveness of thermal power plants in the same industry and to meet the requirements of the national sustainable development strategy, the operation characteristics and optimization of power generation enterprises need to be studied in depth. In this paper, a power plant #8 unit as the research object, to carry out the nozzles steam distribution unit field test, dynamic characteristics modeling, thermal economic analysis and steam distribution optimization and other related work. The field test of the object unit including step response test of turbine load, deep peak-shaving test and fast peak-shaving test were carried out, and the step response characteristics of regulating valve under different loads were obtained. At the same time, under the premise of ensuring the operation safety of the unit, through the rapid lifting load test to manually obtain the fastest load rate allowed in the high speed peak-shaving, which provides a reference for the similar units, and for the subsequent modeling. Debugging and optimization work provides test data. Secondly, based on the APROS analytical support platform, the steam turbine and its thermodynamic system model are established by using the unit design data. The reliability of the model is verified by comparing the dynamic characteristics of the unit with the field characteristic test data. Based on the established APROS detailed calculation model. According to the influence factors of quantitative analysis on unit economy in different typical working conditions, including initial pressure, initial temperature and back pressure, the influence curves and correction curves of various factors on power and heat consumption rate were obtained. Then the comprehensive flow coefficient curve and the combined characteristic curve of regulating valve and regulating stage are obtained by detailed calculation of variable working conditions. The theoretical calculation model is established, and the simulation model is debugged based on the theoretical calculation model. Based on the previous research of overlap degree, the adjustment valve and the regulating stage of the simulation model are debugged. The reliability of the simulation model is verified by comparing the simulation model calculation data with the field control valve characteristic test data. On this basis, combined with the idea of load and valve position, the steam distribution optimization of the unit is studied. The change curves of heat consumption under various steam distribution modes are obtained, and the feasibility of optimization is proved by comparing with the actual operation data, and then the optimal steam distribution mode and the optimal initial pressure curve are obtained. The theoretical mathematical model of the heat consumption rate with the main steam pressure is established, and the conclusions can be used to guide the field test of the unit. It provides the direction for the further optimization of the actual operation curve on the spot, aiming at the problem that the back pressure of the object unit is greatly affected by the season. According to the optimal steam distribution mode of the unit, the optimal initial pressure curve cluster of the unit and the logical modified reference curve of the back pressure to the main steam pressure are obtained based on the established model. Finally, the advanced intelligent optimization algorithm of firefly is introduced. The advantages and disadvantages of PSO and PSO in solving different optimization problems are discussed, and the coal consumption characteristic curves before and after steam distribution optimization are obtained. The effectiveness of the firefly algorithm in solving this kind of problem is verified compared with the traditional algorithm, and the economic load distribution scheme of the whole plant is obtained according to the requirements of the power grid dispatching under the limitation of the different fastest load rate of the unit.
【學(xué)位授予單位】:東南大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TM621
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;移動機(jī)組最佳負(fù)荷規(guī)范的計(jì)算[J];糧油加工與食品機(jī)械;1981年02期
2 焦會良;上安電廠~#1機(jī)組負(fù)荷受阻原因分析[J];河北電力技術(shù);1999年04期
3 王忠元,柯建新;實(shí)施機(jī)組運(yùn)行優(yōu)化管理的經(jīng)驗(yàn)[J];華東電力;2000年01期
4 楊勇平,劉彤,郭民臣,劉文義;關(guān)于火電機(jī)組性能評價指標(biāo)的探討[J];中國電機(jī)工程學(xué)報;2000年02期
5 劉紅,蘇同春,姚軍;合肥二電廠2×350MW機(jī)組協(xié)調(diào)控制[J];電站系統(tǒng)工程;2003年04期
6 王維軍;王時雨;;機(jī)組閥門試驗(yàn)中負(fù)荷擺動及之后閥門打不開的原因[J];華北電力技術(shù);2005年12期
7 黃衛(wèi)劍;陳世和;;600MW機(jī)組快速減負(fù)荷試驗(yàn)成功的分析[J];廣東電力;2007年03期
8 楊印廷;張國棟;;330MW機(jī)組RB功能分析[J];電力科學(xué)與工程;2008年05期
9 李宏;劉衛(wèi)國;李泉;;600MW機(jī)組RB邏輯的分析與優(yōu)化[J];浙江電力;2008年06期
10 劉歡迎;宋和斌;姜瑞紅;;一起機(jī)組跳閘事件的分析及對策[J];江西電力;2008年03期
相關(guān)會議論文 前10條
1 范秋香;;600MW機(jī)組SIS系統(tǒng)的應(yīng)用[A];2010年全國發(fā)電廠熱工自動化專業(yè)會議論文集[C];2010年
2 劉蕊;曹海波;萬新福;;姚電公司600MW機(jī)組節(jié)能降耗綜合治理[A];全國火電600MWe級機(jī)組能效對標(biāo)及競賽第十四屆年會論文集[C];2010年
3 任福俊;扎永強(qiáng);吳濤;;耗差分析系統(tǒng)在200MW機(jī)組運(yùn)行優(yōu)化對標(biāo)管理中的應(yīng)用[A];全國火電100-200MW級機(jī)組技術(shù)協(xié)作會2009年年會論文集[C];2009年
4 袁珍亮;王祿偉;;200MW機(jī)組節(jié)能降耗綜合分析[A];全國火電200MW級機(jī)組協(xié)作會第22屆年會論文集[C];2004年
5 楊印廷;張國棟;;330MW機(jī)組RB功能的淺析[A];全國火電大機(jī)組(300MW級)競賽第37屆年會論文集[C];2008年
6 金新榮;;從運(yùn)行角度談燃煤機(jī)組節(jié)能降耗[A];全國火電100MW級機(jī)組技術(shù)協(xié)作會第6屆年會論文集[C];2007年
7 肖慧峰;孫瑞;肖伯樂;茅冬春;張泉林;莊清泉;;短時間區(qū)間最優(yōu)意義的機(jī)組負(fù)荷在線經(jīng)濟(jì)分配[A];2004電站自動化信息化學(xué)術(shù)技術(shù)交流會議論文集[C];2004年
8 朱慶玉;;丹東電廠350MW機(jī)組優(yōu)化運(yùn)行的研究與實(shí)踐[A];全國火電大機(jī)組(300MW級)競賽第38屆年會論文集[C];2009年
9 錢忠文;俞基安;;加強(qiáng)機(jī)組長周期高負(fù)荷連續(xù)運(yùn)行特點(diǎn)的研究,確保機(jī)組穩(wěn)發(fā)滿發(fā)[A];全國火電大機(jī)組(600MW級)競賽第8屆年會論文集[C];2004年
10 ;600MW機(jī)組高級控制系統(tǒng)優(yōu)化方案研究與應(yīng)用[A];全國火電大機(jī)組(600MW級)競賽第十二屆年會論文集(下冊)[C];2008年
相關(guān)重要報紙文章 前10條
1 薛卿 鄭瑞霞;定洲電廠1號機(jī)組健步走完“168”[N];華北電力報;2004年
2 金二學(xué);姚孟發(fā)電多措并舉扭虧為贏[N];中國電力報;2010年
3 張志紅 通訊員 盛建華;老機(jī)組煥發(fā)新活力[N];中國電力報;2009年
4 丁芳;節(jié)水增發(fā)電 減碳兩千萬[N];東北電力報;2010年
5 記者 王方遒;哈產(chǎn)三峽首臺國產(chǎn)化機(jī)組并入國網(wǎng)[N];哈爾濱日報;2007年
6 通訊員 雷霞;喜河水電搶抓洪尾促增發(fā)[N];中國電力報;2011年
7 車志榮 任洋;三道措施把關(guān) 全員參與有保證[N];中國電力報;2004年
8 朱晶晶 記者 鄒偉軍;九江電廠上半年發(fā)電量同比超發(fā)3.21億千瓦時[N];九江日報;2014年
9 本報記者 牛彥君;從“欠產(chǎn)”到“超產(chǎn)”[N];甘肅日報;2006年
10 記者 徐鑫;華能營口電廠扭虧為盈[N];遼寧日報;2009年
相關(guān)博士學(xué)位論文 前10條
1 趙軍;太陽能輔助燃煤機(jī)組發(fā)電技術(shù)與政策研究[D];華北電力大學(xué);2015年
2 卓旭升;亞臨界燃煤機(jī)組動態(tài)建模及非線性控制應(yīng)用研究[D];華中科技大學(xué);2008年
3 王惠杰;基于混合模型的機(jī)組狀態(tài)重構(gòu)及運(yùn)行優(yōu)化研究[D];華北電力大學(xué)(河北);2009年
4 靳濤;火電機(jī)組反向建模方法的研究[D];華北電力大學(xué)(北京);2011年
5 龐昌樂;拖拉機(jī)作業(yè)機(jī)組仿真系統(tǒng)控制策略和模糊綜合控制的研究[D];中國農(nóng)業(yè)大學(xué);2002年
6 李利平;火電機(jī)組節(jié)能在線分析與智能運(yùn)行優(yōu)化方法研究[D];華北電力大學(xué)(河北);2007年
7 宗伯華;拖拉機(jī)自動變速及作業(yè)機(jī)組綜合控制研究[D];中國農(nóng)業(yè)大學(xué);2004年
8 安宏文;大容量火電機(jī)組調(diào)峰運(yùn)行的軸系振動特性分析[D];華北電力大學(xué);2014年
9 王瑋;火電機(jī)組冷端系統(tǒng)建模與節(jié)能優(yōu)化研究[D];華北電力大學(xué)(北京);2011年
10 張叢林;水—火—風(fēng)互補(bǔ)發(fā)電系統(tǒng)的容量優(yōu)化配置問題研究[D];天津大學(xué);2012年
相關(guān)碩士學(xué)位論文 前10條
1 孫澤洋;蒸汽噴射器熱力學(xué)解析及其在火電機(jī)組變工況節(jié)能改造中的應(yīng)用[D];華北電力大學(xué);2015年
2 陳超;大唐國際陡河發(fā)電廠No.4機(jī)組協(xié)調(diào)控制系統(tǒng)分析與改造設(shè)計(jì)[D];華北電力大學(xué);2015年
3 胡文杰;火電機(jī)組耗差分析及軟件系統(tǒng)開發(fā)[D];華北電力大學(xué);2015年
4 王雨;唐熱300MW機(jī)組冷端優(yōu)化研究[D];華北電力大學(xué);2015年
5 吳旋;600MW燃煤機(jī)組降低NO_x調(diào)整及技術(shù)改進(jìn)[D];華北電力大學(xué);2015年
6 王建剛;火電機(jī)組冷端系統(tǒng)運(yùn)行優(yōu)化的研究[D];上海電力學(xué)院;2015年
7 莊偉;超臨界機(jī)組協(xié)調(diào)控制系統(tǒng)分析及預(yù)測控制策略研究[D];上海發(fā)電設(shè)備成套設(shè)計(jì)研究院;2015年
8 王嘉寅;超600℃等級超超臨界機(jī)組汽溫控制技術(shù)研究[D];上海交通大學(xué);2014年
9 高巨賢;660MW超臨界機(jī)組協(xié)調(diào)控制系統(tǒng)的設(shè)計(jì)及優(yōu)化[D];華北電力大學(xué);2015年
10 王會;1000MW機(jī)組爐內(nèi)燒偏問題的診斷和燃燒、控制優(yōu)化研究[D];華北電力大學(xué);2015年
,本文編號:1377157
本文鏈接:http://sikaile.net/kejilunwen/dianlilw/1377157.html