遼寧電網(wǎng)風電接納能力研究
本文關鍵詞:遼寧電網(wǎng)風電接納能力研究 出處:《華北電力大學》2015年碩士論文 論文類型:學位論文
更多相關文章: 風力發(fā)電 風電接納能力 調(diào)峰 并網(wǎng)風電
【摘要】:面對日益增長的能源需求與日益減少的化石能源儲量,加之減排帶來的壓力,發(fā)展新的清潔能源成了當務之急。在眾多新能源中,以目前技術水平,風電是最有可能大規(guī)模應用的新能源。但是風力發(fā)電存在波動性和不確定性,大規(guī)模應用必將會對電網(wǎng)安全運行帶來隱患。因此,計算電網(wǎng)的風電接納能力成了電源規(guī)劃一個迫切需要解決的問題。本文首先介紹了風力發(fā)電的原理、風電并網(wǎng)運行的技術規(guī)范。通過對遼寧風資源、風力發(fā)展現(xiàn)狀的分析,確定遼寧發(fā)展風電有自己得天獨厚的條件。在分析影響風電接納能力因素的基礎上,提出了考慮電網(wǎng)調(diào)峰約束的風電接納能力模型。結合遼寧電網(wǎng)的電源結構、負荷特性,計算了遼寧電網(wǎng)的風電接納能力。結合遼寧電網(wǎng)的實際情況,仿真分析了抽水儲能電站容量、供熱機組比例和負荷峰谷差對風電接納能力的影響。結果表明為了增加風電接納能力,遼寧電網(wǎng)可以增加抽水儲能電站的容量、減少供熱機組的占比以電制熱代替熱電廠供熱、實施峰谷分時電價以及電動汽車有序充電控制。最后在相對安全的原則下,為了更近一步挖掘電網(wǎng)的風電接納能力,提出了在電網(wǎng)調(diào)節(jié)困難的時候允許限制部分風電出力的風電接納能力計算方法。該方法允許在電網(wǎng)調(diào)節(jié)困難時刻限制部分風電出力,從而提高風電裝機容量,進而增加在電網(wǎng)非困難時期的風力發(fā)電量。算例分析表明,新的計算方法可以大幅度提高風電在電網(wǎng)中規(guī)劃容量。雖然在電網(wǎng)調(diào)峰困難時期限制部分風電出力,但全時段來看,風電發(fā)電量較之前有大幅度提升。
[Abstract]:In the face of increasing energy demand and decreasing fossil energy reserves, combined with the pressure of emission reduction, the development of new clean energy has become an urgent task. Wind power is the most likely large-scale application of new energy, but wind power has volatility and uncertainty, large-scale application will inevitably bring hidden dangers to the safe operation of the grid. The calculation of the wind power acceptance capacity of the power grid has become an urgent problem to be solved. Firstly, this paper introduces the principle of wind power generation, the technical specifications of wind power grid operation. Through the wind resources in Liaoning Province. Based on the analysis of the current situation of wind power development, it is determined that Liaoning has its own unique conditions for wind power development. A wind power capacity model considering peak load regulation constraints is proposed. Combined with the power supply structure and load characteristics of Liaoning power network, the wind power acceptance capacity of Liaoning power network is calculated, and the actual situation of Liaoning power network is considered. The effects of capacity of pumping energy storage power station, ratio of heating unit and load peak and valley difference on wind power acceptance capacity are analyzed by simulation. The results show that Liaoning power network can increase the capacity of pumping energy storage power station in order to increase the capacity of wind power plant. In order to reduce the proportion of heating units, electric heating instead of thermal power plant heating, the implementation of peak-valley time-sharing price and electric vehicle charging control orderly. Finally, under the principle of relative safety. In order to further explore the wind power grid acceptance capacity. In this paper, a calculation method of wind power capacity is proposed, which can limit the output capacity of part of wind power when it is difficult to adjust the power grid, which allows to limit the output capacity of part of wind power in the difficult time of power grid regulation, thus increasing the installed capacity of wind power generation. The example analysis shows that the new calculation method can greatly improve the capacity of wind power in the power network, although some wind power generation is limited in the difficult period of peak regulation. But all-time point of view, wind power generation has a substantial increase than before.
【學位授予單位】:華北電力大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TM614
【相似文獻】
相關期刊論文 前10條
1 劉曉賢;;對銀南電網(wǎng)開展“六復核”工作的探討[J];寧夏電力;2004年03期
2 陳彥鋒;;創(chuàng)新電網(wǎng)安全經(jīng)濟運行的對策[J];中國高新技術企業(yè);2007年15期
3 林森;;2008年3月華東電網(wǎng)電網(wǎng)運行總體情況[J];華東電力;2008年04期
4 ;電網(wǎng)運行培訓部[J];山東電力高等?茖W校學報;2010年02期
5 吳敏;;冰凍威脅電網(wǎng)安全 廣西電網(wǎng)調(diào)度中心積極防控[J];廣西電業(yè);2011年01期
6 姜瑞峰;;加強電網(wǎng)運行維護安全工作的措施[J];農(nóng)村電氣化;2013年06期
7 蒙定中;大電網(wǎng)與大機組的協(xié)調(diào)(一)[J];電力系統(tǒng)自動化;1986年05期
8 ;提高認識、狠抓落實,,努力開創(chuàng)我局電網(wǎng)運行工作的新局面──張惠清總工程師在青海電網(wǎng)運行工作會議上的總結講話[J];青海電力;1996年03期
9 諸兵;;淺談電網(wǎng)運行技術的優(yōu)化[J];科技與企業(yè);2013年24期
10 唐長春;;電網(wǎng)運行中自動化程度的探究[J];電子技術與軟件工程;2013年23期
相關會議論文 前10條
1 ;全國電網(wǎng)運行與控制標準化技術委員會成立[A];《電站信息》2009年第1期[C];2009年
2 閔勇;魯宗相;喬穎;徐飛;;風電從“并網(wǎng)”到“融入”大電網(wǎng)運行的轉變[A];2010年電力系統(tǒng)自動化學術研討會論文集[C];2010年
3 韓自奮;;甘肅電網(wǎng)氣象信息服務系統(tǒng)應用功能探討[A];水電站梯級調(diào)度及自動控制技術研討會論文集[C];2008年
4 吳琛;李玲芳;張丹;張杰;程e