風(fēng)電齒輪箱快速更換工藝方案研究及應(yīng)用
[Abstract]:In recent years, the wind power industry in China has been developed rapidly, and the installed capacity of wind turbines is increasing day by day. With the increase of operation time of wind turbine, the failure rate of wind turbine during its life is also increasing gradually. Gearbox is the core component of the main transmission chain of double-feed wind turbine. After its failure, due to the limitation of unit spatial structure and its own structure and other factors, the maintenance of gearbox is mainly to adopt the maintenance mode of the main transmission chain as a whole. This scheme has complex process, high technical level requirements for operators, and occupies a large number of maintenance equipment, and the maintenance cycle is long. As a result, enterprises are facing huge pressure on maintenance costs. In order to solve the above problems, this paper takes two kinds of dual-feed wind turbines, 1.5MW and 1.0MW, as the research object, and puts forward the process scheme of rapid replacement of gearbox based on the analysis of unit structure. Through theoretical calculation and practice, it is proved that the scheme is safe and reliable, the operation of process equipment is simple, it can meet the actual engineering needs, and at the same time effectively shorten the maintenance cycle of gearbox, which not only saves the maintenance cost of gearbox for manufacturers, but also recovers the loss of power generation caused by fault shutdown for wind power owners, which has good economic benefits. The process scheme design of rapid replacement of double-feed wind turbine gearbox is mainly based on the consideration of the safety of wind turbine system. Based on the establishment of 1.5MW unit model by GLBladed software, the safety of the process scheme is evaluated, and the influence of gearbox replacement on unit load is analyzed in detail. The strength check and simulation of the key components of the unit are carried out by ANSYS Workbench numerical simulation method. Finally, according to the load calculation results and the unit structure, the process equipment in the scheme is designed and manufactured. The above analysis conclusions can guide the process of gearbox replacement in the air and compile the process documents of gearbox replacement. This scheme has been successfully applied to the replacement operation of 1.5MW unit gearbox in a wind farm in Ningxia.
【學(xué)位授予單位】:寧夏大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TM315
【參考文獻】
相關(guān)期刊論文 前9條
1 王明軍;郭雅克;梅國剛;;某風(fēng)電場齒輪箱損壞及原因分析[J];東方汽輪機;2016年04期
2 李輝;胡姚剛;李洋;楊東;梁媛媛;歐陽海黎;蘭涌森;;大功率并網(wǎng)風(fēng)電機組狀態(tài)監(jiān)測與故障診斷研究綜述[J];電力自動化設(shè)備;2016年01期
3 胡仕明;蔣偉節(jié);曹維鼐;;風(fēng)電機組齒輪箱健康管理探究[J];風(fēng)能;2015年11期
4 胡仕明;梅國剛;;1.5MW雙饋型風(fēng)電機組現(xiàn)場更換齒輪箱方案[J];風(fēng)能;2014年10期
5 黃文怡;梁波;;風(fēng)力發(fā)電機傳動系統(tǒng)檢查及維護技術(shù)[J];黑龍江科學(xué);2014年08期
6 趙文;;風(fēng)力發(fā)電技術(shù)的發(fā)展及發(fā)電機組齒輪箱的研究[J];中國高新技術(shù)企業(yè);2014年20期
7 王輝;李曉龍;王罡;向東;融亦鳴;;大型風(fēng)電齒輪箱的失效問題及其設(shè)計制造技術(shù)的國內(nèi)外現(xiàn)狀分析[J];中國機械工程;2013年11期
8 范有雄;吳元祥;胡翠萍;;鎖緊聯(lián)接傳動的脹套設(shè)計[J];機械傳動;2013年03期
9 孫黎;王春秀;;基于ANSYS的大型風(fēng)電機組齒輪箱的低速軸有限元分析[J];機械設(shè)計與制造;2009年05期
相關(guān)會議論文 前1條
1 王明軍;王大偉;崔博;;風(fēng)電機組齒輪箱損壞及防護措施[A];中國農(nóng)機工業(yè)協(xié)會風(fēng)能設(shè)備分會《風(fēng)能產(chǎn)業(yè)》(2014年第9期)[C];2014年
相關(guān)博士學(xué)位論文 前4條
1 谷玉海;大型風(fēng)電機組齒輪箱早期故障診斷技術(shù)與系統(tǒng)研究[D];機械科學(xué)研究總院;2016年
2 宋磊;雙饋異步風(fēng)電機組狀態(tài)監(jiān)測與故障診斷系統(tǒng)的研究[D];華北電力大學(xué);2015年
3 韓花麗;風(fēng)電機組載荷建模及仿真優(yōu)化研究[D];重慶大學(xué);2015年
4 何偉;湍流風(fēng)場模擬與風(fēng)力發(fā)電機組載荷特性研究[D];華北電力大學(xué);2013年
相關(guān)碩士學(xué)位論文 前5條
1 王騰超;基于振動監(jiān)測的風(fēng)電機組滾動軸承故障診斷應(yīng)用研究[D];燕山大學(xué);2016年
2 常城;大型風(fēng)電機組運行特性分析及狀態(tài)監(jiān)測研究[D];華北電力大學(xué);2016年
3 周玉俊;兆瓦級風(fēng)力機組載荷計算與整機動力學(xué)分析[D];新疆大學(xué);2015年
4 孫曉偉;風(fēng)電機組齒輪箱故障模式與影響分析[D];華北電力大學(xué);2014年
5 郭健;風(fēng)力發(fā)電機整機性能評估與載荷計算的研究[D];大連理工大學(xué);2003年
,本文編號:2502197
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2502197.html