大唐同心賴家洼風(fēng)電場工程造價控制研究

發(fā)布時間:2018-10-19 19:26
【摘要】:隨著能源消耗速度的加快,不可再生能源供給日趨緊張。國家為改善能源結(jié)構(gòu),減輕節(jié)能減排的巨大壓力,保護(hù)環(huán)境,促進(jìn)可再生能源的開發(fā)利用,實現(xiàn)經(jīng)濟(jì)的可持續(xù)發(fā)展,制定了一系列鼓勵開發(fā)可再生能源的扶持政策。正是在這樣的大背景下,風(fēng)電迎來了發(fā)展的春天。風(fēng)電所具備的無污染、清潔、經(jīng)濟(jì)效益好等優(yōu)點對當(dāng)前社會發(fā)展來說十分重要,但是在正視風(fēng)電良性發(fā)展的同時,我們也要認(rèn)識到與火電、水電相比,風(fēng)力發(fā)電成本高、投入大,距離技術(shù)成熟還有很長的路要走。繼2015年核準(zhǔn)的陸上風(fēng)電項目實行標(biāo)桿電價降低0.02元/k Wh后,國家發(fā)改委2015年12月下發(fā)的《關(guān)于完善陸上風(fēng)電、光伏發(fā)電上網(wǎng)標(biāo)桿電價政策的通知》(發(fā)改價格[2015]3044號)中,明確2016年陸上風(fēng)電標(biāo)桿電價繼續(xù)下調(diào)0.01-0.02元/k Wh,同時2018年繼續(xù)下調(diào)0.02-0.03元/k Wh。電價補(bǔ)貼逐年減少已成為明確政策導(dǎo)向,這對降低風(fēng)電項目建設(shè)投資成本提出了更高要求。當(dāng)前,使風(fēng)電工程造價控制在一定范圍內(nèi),已成為風(fēng)電項目建設(shè)的一個關(guān)鍵點。所以,提高工程建設(shè)的技術(shù)水平和管理水平,保證質(zhì)量和工期的同時,科學(xué)合理的進(jìn)行造價控制,對我國風(fēng)電項目的開發(fā)建設(shè)具有重要意義。所謂工程造價控制管理,就是在工程建設(shè)的各個階段應(yīng)用先進(jìn)的組織措施、技術(shù)措施和經(jīng)濟(jì)措施,在優(yōu)化設(shè)計方案和建設(shè)方案的基礎(chǔ)上,把工程造價控制在合理的投資限額內(nèi),以最小的人、財、物力,獲得最好的經(jīng)濟(jì)效益和社會效益。在我國的風(fēng)電建設(shè)過程中,造價失控現(xiàn)象時有發(fā)生,工程造價概算超估算、預(yù)算超概算、決算超預(yù)算的現(xiàn)象嚴(yán)重影響著建設(shè)項目的效益。筆者通過閱讀大量的關(guān)于造價控制管理的研究文獻(xiàn),以造價控制管理相關(guān)理論為基礎(chǔ),結(jié)合相關(guān)的建筑經(jīng)濟(jì)學(xué)、計算機(jī)科學(xué)、系統(tǒng)論等理論知識,借鑒國內(nèi)外現(xiàn)有的關(guān)于風(fēng)電場工程建設(shè)項目造價控制的研究成果,對風(fēng)電場工程建設(shè)造價全過程進(jìn)行了科學(xué)嚴(yán)謹(jǐn)?shù)难芯糠治。本文通過闡述國內(nèi)外關(guān)于風(fēng)電場工程造價控制管理的研究現(xiàn)狀,以大唐同心賴家洼風(fēng)電項目工程為例,探討了其建設(shè)全過程造價控制管理中存在的不足,并分析了項目建設(shè)各個階段的造價預(yù)算,針對其中存在的問題,從影響風(fēng)電場工程造價控制管理因素的角度出發(fā)提出解決對策與保障措施。也期望通過對大唐同心賴家洼風(fēng)電項目工程的造價控制研究,能夠總結(jié)積累工程造價控制研究的方法,拓寬思路,為同類型的風(fēng)電場建設(shè)項目構(gòu)建科學(xué)、合理、有效的造價控制體系提供參考,提升風(fēng)電場建設(shè)項目的造價控制管理水平,降低工程投資的財務(wù)風(fēng)險。
[Abstract]:With the acceleration of energy consumption, the supply of non-renewable energy is becoming increasingly tight. In order to improve the energy structure, reduce the great pressure of energy saving and emission reduction, protect the environment, promote the development and utilization of renewable energy, and realize the sustainable development of economy, the state has formulated a series of supporting policies to encourage the development of renewable energy. It is in this context, wind power ushered in the spring of development. The advantages of wind power, such as no pollution, clean and good economic benefits, are very important to the current social development. However, while facing up to the benign development of wind power, we should also realize that compared with thermal power and hydropower, the cost of wind power generation is high. Big investment, there is still a long way to go from mature technology. Following the benchmark electricity price reduction of 0.02 yuan / k Wh for the onshore wind power project approved in 2015, the National Development and Reform Commission issued in December 2015 a notice on the improvement of the Land Wind Power, Photovoltaic Power Grid benchmark electricity Price Policy (Development and Reform Price [2015] 3044). It is clear that the benchmark price of land wind power in 2016 will continue to be reduced by 0.01-0.02 yuan / k Wh, and 0.02-0.03 yuan / k Wh. in 2018. The reduction of electricity price subsidies has become a clear policy direction, which puts forward higher requirements for reducing the investment cost of wind power projects. At present, the cost control of wind power project has become a key point of wind power project construction. Therefore, it is of great significance for the development and construction of wind power projects in our country to improve the technical level and management level of engineering construction, ensure the quality and duration of the project, and carry out the scientific and reasonable cost control at the same time. The so-called project cost control management means the application of advanced organizational, technical and economic measures in every stage of the project construction, and the control of the project cost within a reasonable investment limit on the basis of the optimization of the design scheme and the construction plan. With the smallest person, money, material resources, obtain the best economic and social benefits. In the process of wind power construction in our country, the phenomenon of out of control of construction cost occurs from time to time. The phenomenon of project cost estimate exceeding estimate, budget exceeding budget estimate and final account exceeding budget seriously affects the benefit of construction project. By reading a large number of research documents on cost control management, the author combines the relevant theories of building economics, computer science, system theory and so on, based on the theory of cost control management. Based on the existing research results of wind farm construction project cost control at home and abroad, this paper makes a scientific and rigorous research and analysis on the whole process of wind farm project construction cost. In this paper, the current situation of research on cost control management of wind farm project at home and abroad is expounded. Taking the project of Tongxin Lai Jiawa wind power project in Datang as an example, the shortcomings of cost control management in the whole process of construction are discussed. The cost budget of each stage of the project construction is analyzed. In view of the existing problems, the countermeasures and guarantee measures are put forward from the point of view of the factors affecting the control and management of the project cost of the wind farm. It is also expected that through the study of the cost control of the Tongxin Lai Jiawa wind power project in Datang, it will be able to sum up the research methods of the accumulated project cost control, broaden the thinking, and build a scientific and reasonable construction project for the same type of wind farm. The effective cost control system can improve the cost control management level of wind farm construction project and reduce the financial risk of project investment.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TM614;TU723.3

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 江眺;水利水電工程設(shè)計階段的造價控制[J];安徽建筑;2001年06期

2 王家勝;談造價控制在工程設(shè)計中的作用[J];工程建設(shè)與檔案;2003年03期

3 沈浮;《建設(shè)工程施工合同》中有關(guān)造價控制條款的闡析[J];有色冶金設(shè)計與研究;2003年02期

4 王瑞研;造價控制——公路工程的“重頭戲”[J];黑龍江交通科技;2005年05期

5 陳新華,賴兆平;高速公路建設(shè)造價控制探討[J];廣東公路交通;2005年03期

6 李平;;淺談設(shè)計階段的造價控制[J];廣東建材;2006年08期

7 洪亮;;淺談如何加強(qiáng)設(shè)計階段的造價控制[J];廣東建材;2007年01期

8 冀業(yè);劉鎖鐵;宋艷霞;;建設(shè)工程材料的造價控制[J];科技情報開發(fā)與經(jīng)濟(jì);2007年15期

9 毛俊輝;;淺析工程項目全過程的造價控制[J];廣東建材;2007年09期

10 周慧樸;;談監(jiān)理在施工階段的造價控制[J];山西建筑;2007年30期

相關(guān)會議論文 前10條

1 郭錫斌;;醫(yī)院工程管理與造價控制[A];2010’全國醫(yī)院建設(shè)大會——貴州省醫(yī)院建設(shè)與發(fā)展專題研討會會刊[C];2010年

2 高林紅;;建筑工程的造價控制與管理探討[A];2013年7月建筑科技與管理學(xué)術(shù)交流會論文集[C];2013年

3 尹琳琳;彭龍仕;王秀娜;;風(fēng)險管理視角下海纜敷設(shè)工程的造價控制[A];電網(wǎng)工程造價管理優(yōu)秀論文[C];2011年

4 李延濱;;淺析住宅建設(shè)的造價控制[A];現(xiàn)代建設(shè)工程應(yīng)用技術(shù)學(xué)術(shù)交流會論文集[C];2009年

5 彭凌;;淺談高校房屋設(shè)施維修改造項目的造價控制[A];機(jī)遇與挑戰(zhàn)——北京高校后勤物業(yè)管理研究論文集[C];2003年

6 馮松;王波;王兵;;工程建設(shè)全過程的造價控制[A];土木工程建造管理:2008年遼寧省土木建筑學(xué)會建筑施工專業(yè)委員會論文集[C];2008年

7 謝立君;;建筑安裝工程施工過程中的造價控制[A];土木工程建造管理:2007年遼寧省土木建筑學(xué)會建筑施工專業(yè)委員會論文集[C];2007年

8 商偉江;;監(jiān)理工程師進(jìn)行造價控制的要點[A];河南省土木建筑學(xué)會2008年學(xué)術(shù)交流會論文集[C];2008年

9 林瑛;;水利工程施工階段的造價控制探討[A];2013年7月建筑科技與管理學(xué)術(shù)交流會論文集[C];2013年

10 董擁軍;宋繼紅;;探析建設(shè)項目的造價管理控制[A];河南省土木建筑學(xué)會2010年學(xué)術(shù)研討會論文集[C];2010年

相關(guān)重要報紙文章 前10條

1 浙江宏成建設(shè)集團(tuán)有限公司 沈昆明 趙永樂 樓賽婷;造價控制應(yīng)貫穿工程全過程[N];建筑時報;2013年

2 胡俊霞 董毅;北京公司強(qiáng)化電網(wǎng)工程現(xiàn)場造價控制[N];國家電網(wǎng)報;2008年

3 辛鳳云;淺談公路造價控制與管理[N];中華建筑報;2006年

4 上海沖佳電力工程安裝有限公司 俞軍;工程施工中的造價控制[N];建筑時報;2013年

5 成龍建設(shè)集團(tuán)有限公司 吳錦宏;也談工程施工階段的造價控制[N];建筑時報;2011年

6 王曉娟 山西省晉中市水利建筑工程總公司;淺談水利工程的造價控制[N];晉中日報;2011年

7 李瑾瑜;淺論房地產(chǎn)開發(fā)項目的造價控制[N];建筑時報;2004年

8 邱磊 陳存恩 范文龍;優(yōu)化設(shè)計與造價控制[N];建筑時報;2007年

9 浙江舜元建設(shè)有限公司 邵渭標(biāo)邋徐光新 劉風(fēng)華;工程施工中的造價控制[N];建筑時報;2007年

10 ;工程項目全過程的造價控制和管理[N];財會信報;2011年

相關(guān)碩士學(xué)位論文 前10條

1 鄒英;碼頭工程設(shè)計階段造價控制評價方法研究[D];大連理工大學(xué);2015年

2 郝然;政府投資中小型項目的造價管理與控制研究[D];大連理工大學(xué);2015年

3 葛建平;EP業(yè)主單位工程建設(shè)項目造價控制研究[D];北京理工大學(xué);2015年

4 劉雙果;黎托公司長沙高鐵站安置房項目造價控制研究[D];湖南大學(xué);2015年

5 戴曉倩;西安市園林綠化工程造價控制的應(yīng)用研究[D];西安建筑科技大學(xué);2015年

6 馬瑤;變電站工程前期造價控制及其在X工程的應(yīng)用[D];山東大學(xué);2016年

7 越光平;大唐同心賴家洼風(fēng)電場工程造價控制研究[D];吉林大學(xué);2017年

8 王戎;代理業(yè)主造價控制的研究與應(yīng)用[D];重慶大學(xué);2006年

9 黨勝利;沈陽工程學(xué)院新校區(qū)建設(shè)造價控制研究[D];吉林大學(xué);2009年

10 袁春林;設(shè)計階段工程造價咨詢單位的造價控制研究[D];重慶大學(xué);2008年

,

本文編號:2282135

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2282135.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶61d7e***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com