BY公司特高壓變電站工程項(xiàng)目組織優(yōu)化研究
[Abstract]:In the face of the new situation of UHV substation construction, it is found that most of the documents are related to UHV engineering technology, and the project management of UHV substation. In particular, there is little research on organization. Moreover, there are many problems in the substation project organization of BY Company, which lack the template to be used for reference, so it is urgent to study and solve the existing problems in the substation project organization of .by company. The problem of single and inflexible organizational structure can not reflect the present situation of complex organizational structure and can not be used as a guide to engineering construction. In the engineering construction, the procedure and responsibility of solving the problem are confused, which leads to the decrease of the efficiency of the organization. In the face of the new situation of more units involved in the construction, the project faces a large number of communication and coordination problems to be solved. The objectives of each functional department are not unified, all have their own objectives, there is a situation of their own. In different stages of the project, the organizational structure of the project is different and needs to be adjusted from time to time. Different internal organizational structures that may exist in different specialties within the organization should be specifically optimized. The division of powers and responsibilities is unclear. Substation engineering staff mobility, how to do a good job in the management of new personnel is a problem. The management span and level are not dynamically adjusted according to the project scale. There are some problems in the organization of UHV substation project organization in by Company. Faced with these problems, BY company UHV substation project organization needs to be optimized. This article starts with the theory, uses the literature search method, grasps the current domestic and foreign related research achievement, carries on the systematic comb to the engineering project organization related theory, the project management theory, the project organization structure theory, the organization operation mechanism. In order to understand the actual situation of the project organization, to understand the environment, the industry trend, the current situation of the company, and the specific environment faced by BY Company through investigation and communication, The concrete problems encountered in UHV substation project management are summarized and summarized. This paper analyzes the causes of the problems in the existing project management, and puts forward the optimization objectives of the project organization from four aspects: the project organization authority, the structure, the communication and coordination, and the encouragement. According to the proposed objectives, the strategy of project organization optimization for UHV substation is formulated, the project organization is optimized and implemented, the organization suitable for the project is found out, and the operation effect of the new project organization is evaluated. Taking the WF1000 KV substation as an example, the project organization of the substation is optimized to make the organization structure suitable for the construction project of the existing substation project. The detailed design of the organization structure in the fine aspects of the organization operation makes the operation mode of the organization more clear. For the first time, the new organizational structure form is combined and applied to the small organizational structure of the construction team. The proposed optimization path and method can be solved in the face of new organizational problems, which can be used for reference to more UHV substations in the future, and also to the optimization of the organizational structure of conventional substations.
【學(xué)位授予單位】:山東大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TM63
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 屈麟;劉貴富;;電力通信工程項(xiàng)目管理組織優(yōu)化分析[J];中國(guó)高新技術(shù)企業(yè);2016年21期
2 黃治國(guó);;試析建筑工程管理的優(yōu)化措施[J];科技展望;2016年01期
3 王奎淘;;特高壓電網(wǎng)工程建設(shè)管理模式研究[J];化工管理;2015年26期
4 楊波峰;;一種基于項(xiàng)目成本的組織績(jī)效模式初探[J];價(jià)值工程;2015年14期
5 童紀(jì)新;王琳;馬晶晶;;高新技術(shù)項(xiàng)目組織集成創(chuàng)新研究[J];管理現(xiàn)代化;2015年02期
6 佘健俊;李梅;陳禮靖;;IPD模式下工程項(xiàng)目組織溝通管理研究[J];煤炭工程;2015年02期
7 謝洪濤;張普偉;;項(xiàng)目組織中交易型領(lǐng)導(dǎo)對(duì)員工績(jī)效的影響——領(lǐng)導(dǎo)替代的調(diào)節(jié)作用[J];系統(tǒng)管理學(xué)報(bào);2015年01期
8 張昊;;工程項(xiàng)目組織的團(tuán)隊(duì)建設(shè)研究[J];建設(shè)監(jiān)理;2014年09期
9 王慧;;施工組織設(shè)計(jì)對(duì)建設(shè)工程項(xiàng)目成本的影響[J];價(jià)值工程;2014年16期
10 何清華;羅嵐;李永奎;韓翔宇;;工程項(xiàng)目組織集成對(duì)項(xiàng)目績(jī)效的影響路徑[J];同濟(jì)大學(xué)學(xué)報(bào)(自然科學(xué)版);2014年01期
相關(guān)博士學(xué)位論文 前2條
1 段志成;工程項(xiàng)目管理標(biāo)準(zhǔn)化作用機(jī)理研究[D];天津大學(xué);2012年
2 李默;工程施工企業(yè)項(xiàng)目組合優(yōu)選與組織模式研究[D];山東科技大學(xué);2011年
,本文編號(hào):2248477
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2248477.html