1000MW核電蒸汽發(fā)生器管子管板焊接
發(fā)布時(shí)間:2018-09-15 06:21
【摘要】:管子管板焊接是核電站一回路主設(shè)備蒸汽發(fā)生器制造過(guò)程中的關(guān)鍵工序,管子管板焊接質(zhì)量直接影響著蒸汽發(fā)生器的使用壽命和制造進(jìn)度。分別對(duì)二代改進(jìn)型壓水堆和三代壓水堆1000MW蒸汽發(fā)生器管子管板焊接工藝進(jìn)行介紹,比較了RCC-M規(guī)范和ASME規(guī)范對(duì)管子管板焊接要求的異同,針對(duì)焊接過(guò)程中出現(xiàn)的問(wèn)題,分析了缺陷產(chǎn)生的根本原因,對(duì)焊接參數(shù)重新進(jìn)行優(yōu)化,同時(shí)加強(qiáng)了焊接過(guò)程控制,得到了質(zhì)量穩(wěn)定、焊縫形狀和尺寸均滿足設(shè)計(jì)要求的焊接接頭。
[Abstract]:Tube-plate welding is a key process in the manufacture of steam generator for primary circuit equipment of nuclear power station. The welding quality of tube plate has a direct impact on the service life and manufacturing progress of steam generator. This paper introduces the welding technology of the second generation improved PWR and the third generation PWR 1000MW steam generator, compares the differences and similarities between the RCC-M specification and the ASME code for the tube-plate welding requirements, and aims at the problems in the welding process. The fundamental causes of the defects are analyzed, the welding parameters are optimized again, and the welding process control is strengthened to obtain the welded joints with stable quality and the shape and size of the weld meet the design requirements.
【作者單位】: 上海電氣核電設(shè)備有限公司;上海核電裝備焊接及檢測(cè)工程技術(shù)研究中心;
【基金】:上海市科委項(xiàng)目(14DZ2250300)
【分類號(hào)】:TM623;TL353.13
[Abstract]:Tube-plate welding is a key process in the manufacture of steam generator for primary circuit equipment of nuclear power station. The welding quality of tube plate has a direct impact on the service life and manufacturing progress of steam generator. This paper introduces the welding technology of the second generation improved PWR and the third generation PWR 1000MW steam generator, compares the differences and similarities between the RCC-M specification and the ASME code for the tube-plate welding requirements, and aims at the problems in the welding process. The fundamental causes of the defects are analyzed, the welding parameters are optimized again, and the welding process control is strengthened to obtain the welded joints with stable quality and the shape and size of the weld meet the design requirements.
【作者單位】: 上海電氣核電設(shè)備有限公司;上海核電裝備焊接及檢測(cè)工程技術(shù)研究中心;
【基金】:上海市科委項(xiàng)目(14DZ2250300)
【分類號(hào)】:TM623;TL353.13
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;我國(guó)將建1200MW超超臨界燃煤發(fā)電機(jī)組[J];上海電力;2009年02期
2 黃立;;20MW貫流式水輪發(fā)電機(jī)運(yùn)行研究[J];科技創(chuàng)新導(dǎo)報(bào);2012年29期
3 佟瑞新,李日新;登封電廠55MW雙水內(nèi)冷汽輪發(fā)電機(jī)技術(shù)特點(diǎn)、安裝及運(yùn)行[J];電站系統(tǒng)工程;1996年05期
4 ;全國(guó)電力行業(yè)在我省舉辦技能大比武——全國(guó)電力行業(yè)200 MW、300 MW火電機(jī)組機(jī)、爐、電運(yùn)行值班員及300 MW集控值班員技能競(jìng)賽在南京隆重舉行[J];江蘇電機(jī)工程;2001年03期
5 馬元s,
本文編號(hào):2244037
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2244037.html
最近更新
教材專著