500kV輸變電工程項目后評價實證研究
[Abstract]:The reverse distribution of energy resources and load centers is the main feature of China's energy industry layout. In order to optimize China's energy Internet construction, it is necessary to adhere to the power construction as the center. It is necessary to establish large-capacity and long-distance energy transmission channels to ensure the power supply of load centers in central and Eastern China. Based on the theory of post-evaluation and the construction content of power transmission and transformation projects, this paper studies the post-evaluation of power supply companies'construction of power transmission and transformation projects, and accumulates post-evaluation for large-scale construction of power transmission and transformation projects in China. In this paper, the construction process of 500 kV transmission and transformation project is analyzed in detail, from the pre-project evaluation, project construction evaluation, project financial evaluation and project sustainability evaluation. The evaluation index system of 500 kV power transmission and transformation project is constructed from four aspects of price, which ensures the rationality of each index and expounds its calculation process. The weight is determined by entropy weight method according to the importance of the index and the different emphases, and the 500 kV power transmission and transformation project is established by fuzzy comprehensive evaluation method according to the relationship between the indexes. The empirical study takes a 500kV power transmission and transformation project as an example, builds an evaluation system combining with the actual completion and commissioning of the project and the meaning of each index, and verifies the accuracy of the model according to the actual project management and control process. The standard system and evaluation model provide reference for similar post evaluation of power grid construction projects.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TM72
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 繆蕓;繆翼軍;陳紅坤;胡畔;;基于模糊層次分析法與支持向量機的變壓器風(fēng)險評估[J];現(xiàn)代電力;2014年06期
2 孫莉芬;朝發(fā)樹;張萌;陳波;;基于南方電網(wǎng)某局中介項目集的項目管理后評價研究[J];項目管理技術(shù);2014年11期
3 王玲;李效臻;;輸變電技改項目后評價指標(biāo)與方法[J];電網(wǎng)與清潔能源;2014年07期
4 張振安;曾仲;柳瑞禹;朱全勝;;基于系統(tǒng)論的電網(wǎng)企業(yè)技改項目評價指標(biāo)體系構(gòu)建[J];科技和產(chǎn)業(yè);2014年07期
5 劉宇彬;劉建華;;基于層次分析法和熵權(quán)法的電網(wǎng)風(fēng)險評估[J];電力科學(xué)與工程;2013年11期
6 孫海玲;李旭偉;;大型基礎(chǔ)設(shè)施可持續(xù)發(fā)展能力評價體系的構(gòu)建[J];統(tǒng)計與決策;2013年16期
7 尹鵬;楊仁樹;丁日佳;王文博;;基于熵權(quán)法的房地產(chǎn)項目建筑質(zhì)量評價[J];技術(shù)經(jīng)濟(jì)與管理研究;2013年03期
8 程啟月;;評測指標(biāo)權(quán)重確定的結(jié)構(gòu)熵權(quán)法[J];系統(tǒng)工程理論與實踐;2010年07期
9 董軍;蔣雪;;輸電項目評價研究現(xiàn)狀綜述[J];華東電力;2010年03期
10 金雪蓮;閆敏;馬源良;;項目后評價理論在電力項目中的應(yīng)用[J];青海電力;2009年02期
相關(guān)碩士學(xué)位論文 前10條
1 呂學(xué)賓;日照巨峰500kV輸變電工程項目質(zhì)量管理研究[D];華北電力大學(xué)(北京);2016年
2 于青濤;臨沂巨峰500kV輸變電工程項目后評價研究[D];華北電力大學(xué)(北京);2016年
3 黃曉娟;基于多目標(biāo)層次分析法的輸變電項目后評價體系研究[D];華北電力大學(xué);2014年
4 邢聞;揚州西500kV輸變電工程項目計劃、風(fēng)險分析與后評價研究[D];南京郵電大學(xué);2014年
5 張星海;城西500kV線路工程項目經(jīng)濟(jì)效益后評價研究[D];華北電力大學(xué);2014年
6 王春艷;電網(wǎng)建設(shè)項目后評價指標(biāo)體系研究[D];廣西大學(xué);2013年
7 劉立軒;基于多層次模糊評價法的內(nèi)蒙古電網(wǎng)工程項目后評價研究[D];內(nèi)蒙古科技大學(xué);2012年
8 孫越;水利建設(shè)項目后評價研究[D];山西財經(jīng)大學(xué);2009年
9 張建明;輸變電工程項目經(jīng)濟(jì)效益后評價研究[D];華北電力大學(xué)(北京);2008年
10 柴中華;電力項目后評價理論、方法及應(yīng)用研究[D];河海大學(xué);2007年
,本文編號:2177506
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2177506.html