元寶山供電公司農(nóng)網(wǎng)改造工程項(xiàng)目進(jìn)度管理研究

發(fā)布時(shí)間:2018-07-23 18:40
【摘要】:農(nóng)村電網(wǎng)升級(jí)改造工程施工往往由當(dāng)?shù)仉娏κ┕て髽I(yè)進(jìn)行,施工較為便利,但同時(shí)由于施工企業(yè)缺乏管理,人員素質(zhì)冗雜,工程進(jìn)度難以控制。再加上投資量大,建設(shè)周期長(zhǎng),且點(diǎn)多面廣,難度更為加大。隨著農(nóng)村電網(wǎng)升級(jí)改造工程深度加深和改造規(guī)模日益擴(kuò)大,國(guó)家對(duì)于項(xiàng)目管理要求也越來(lái)越嚴(yán)格,總公司下發(fā)的各種考核指標(biāo)都對(duì)項(xiàng)目進(jìn)度管理提出了更高要求。本文以項(xiàng)目進(jìn)度管理的基本理論為基礎(chǔ),以國(guó)網(wǎng)元寶山區(qū)供電公司2015年農(nóng)村電網(wǎng)升級(jí)改造項(xiàng)目為研究對(duì)象,從項(xiàng)目管理成熟理論(包括進(jìn)度計(jì)劃、網(wǎng)絡(luò)計(jì)劃、進(jìn)度控制和項(xiàng)目變更控制)出發(fā),對(duì)國(guó)網(wǎng)元寶山區(qū)供電公司農(nóng)村電網(wǎng)升級(jí)改造工程項(xiàng)目進(jìn)度管理問(wèn)題進(jìn)行分析。最后,在對(duì)國(guó)網(wǎng)元寶山區(qū)供電公司2015年農(nóng)村電網(wǎng)升級(jí)工程基本情況介紹的基礎(chǔ)上,分別運(yùn)用工程項(xiàng)目進(jìn)度計(jì)劃、網(wǎng)絡(luò)計(jì)劃技術(shù)、項(xiàng)目進(jìn)度控制管理和項(xiàng)目變更及控制管理對(duì)國(guó)網(wǎng)元寶山區(qū)供電公司2015年農(nóng)村電網(wǎng)升級(jí)改造中的三個(gè)部分:10kV配電線路、10kV排灌和低壓綜合臺(tái)區(qū)改造工程分別進(jìn)行分析研究,以提高農(nóng)村電網(wǎng)改造升級(jí)項(xiàng)目進(jìn)度管理的科學(xué)性和有效性,提高項(xiàng)目進(jìn)度管理理論和技術(shù)方法在農(nóng)村電網(wǎng)改造項(xiàng)目中的應(yīng)用效能。針對(duì)農(nóng)村電網(wǎng)改造周期長(zhǎng)、面積廣、管理難度大等特點(diǎn),本文在分析元寶山區(qū)農(nóng)村電網(wǎng)改造項(xiàng)目進(jìn)度管理特殊性的基礎(chǔ)上,運(yùn)用網(wǎng)絡(luò)計(jì)劃進(jìn)度圖,WBS(工作結(jié)構(gòu)分解)等,提高了農(nóng)村電網(wǎng)改造升級(jí)項(xiàng)目進(jìn)度管理的科學(xué)性和有效性。提出"進(jìn)度全面控制"理念,以前饋控制、實(shí)時(shí)控制作為元寶山農(nóng)村電網(wǎng)改造工程進(jìn)度管理控制的雙重保障,為元寶山項(xiàng)目的管理提供了可供參考的依據(jù),也可作為其他類(lèi)似實(shí)際工程的參考。
[Abstract]:The construction of rural power grid upgrading project is usually carried out by the local electric power construction enterprise, which is more convenient, but at the same time, because of the lack of management of the construction enterprise, the quality of the personnel is miscellaneous, the progress of the project is difficult to control. Plus large amount of investment, long construction cycle, and a wide range of points, more difficult. With the deepening of the rural power grid upgrading and upgrading project and the increasing scale of the transformation, the country is more and more strict to the project management requirements, the head office issued a variety of assessment indicators have put forward higher requirements for project schedule management. This paper is based on the basic theory of project schedule management, taking the project of rural power grid upgrading and upgrading of Yuanbaoshan District Power supply Company of National Network in 2015 as the research object, from the mature theory of project management (including schedule plan, network plan, etc. Proceeding from schedule control and project change control, this paper analyzes the project schedule management of the rural power grid upgrading project of Yuanbaoshan District Power supply Company. Finally, on the basis of introducing the basic situation of the rural power grid upgrade project in 2015 of Yuanbaoshan District Power supply Company of National Power Network, the project schedule and network planning technology are used respectively. The project schedule control management and project change and control management respectively analyze and study the three parts of the rural power grid upgrade and renovation of Yuanbaoshan District Power supply Company in 2015, namely, 10 kV drainage and irrigation of 10 kV distribution line and reconstruction project of low voltage integrated platform area. In order to improve the scientific and effective management of rural power grid upgrading project schedule management and improve the application efficiency of project schedule management theory and technology method in rural power grid transformation project. Based on the analysis of the particularity of the schedule management of the rural power grid reconstruction project in Yuanbaoshan District, this paper applies the network plan schedule diagram to analyze the characteristics of the rural power grid reconstruction project, such as long period, wide area and great difficulty in management, and so on, using WBS (work structure decomposition), etc. It improves the scientific and effective management of rural power grid upgrading project schedule management. This paper puts forward the idea of "overall progress control", which takes feedforward control and real-time control as the double guarantee of schedule management control of Yuanbaoshan rural power grid renovation project, and provides a reference basis for the management of Yuanbaoshan project. It can also be used as a reference for other similar practical projects.
【學(xué)位授予單位】:天津工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類(lèi)號(hào)】:TU722;TM727.1

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 趙星星;;做好農(nóng)網(wǎng)升級(jí)改造工程進(jìn)度管理的幾點(diǎn)措施[J];科技傳播;2013年19期

2 韓玉海;;輸變電工程項(xiàng)目風(fēng)險(xiǎn)監(jiān)控及風(fēng)險(xiǎn)應(yīng)對(duì)策略研究[J];山東工業(yè)技術(shù);2013年07期

3 董大偉;徐千;;配網(wǎng)工程項(xiàng)目的過(guò)程管理[J];科技傳播;2012年20期

4 朱安樂(lè);;10kV配電網(wǎng)工程項(xiàng)目施工管理[J];科技風(fēng);2012年11期

5 辛偉平;;淺談10kV及以下農(nóng)網(wǎng)升級(jí)改造工程的標(biāo)準(zhǔn)化建設(shè)[J];廣東科技;2012年07期

6 徐哲;王黎黎;;基于關(guān)鍵鏈技術(shù)的項(xiàng)目進(jìn)度管理研究綜述[J];北京航空航天大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2011年02期

7 趙振宇;呂乾雷;;項(xiàng)目進(jìn)度控制的雙邊緩沖區(qū)方法研究[J];工程管理學(xué)報(bào);2010年05期

8 聶淑萍;高建民;;項(xiàng)目進(jìn)度管理在國(guó)防科研項(xiàng)目管理中的應(yīng)用探析[J];國(guó)防技術(shù)基礎(chǔ);2008年07期

9 郭志鑫;王麗娟;;企業(yè)多項(xiàng)目進(jìn)度管理研究[J];商場(chǎng)現(xiàn)代化;2007年29期

10 姚強(qiáng);;進(jìn)度控制和質(zhì)量控制在建筑施工中的作用與關(guān)系[J];四川建筑;2006年02期

,

本文編號(hào):2140290

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2140290.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶bbd4e***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com