天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 科技論文 > 電氣論文 >

水電站群聯(lián)合調(diào)峰調(diào)度均勻逐步優(yōu)化方法

發(fā)布時間:2018-06-29 18:22

  本文選題:水電站群 + 調(diào)峰調(diào)度。 參考:《中國電機工程學(xué)報》2017年15期


【摘要】:由于受到系統(tǒng)規(guī)模逐年擴大、調(diào)度要求日趨精細和約束集合日漸龐雜等諸多因素影響,如何快速制定合理的發(fā)電調(diào)度計劃是水電站群聯(lián)合調(diào)度面臨的關(guān)鍵科學(xué)難題,集中體現(xiàn)在初始解的快速生成機制、決策空間的科學(xué)辨識模式以及行之有效的優(yōu)化調(diào)度方法等3個方面。為此,從工程實用化角度出發(fā),提出求解水電站群聯(lián)合調(diào)峰調(diào)度問題的均勻逐步優(yōu)化方法。該方法首先依據(jù)水電系統(tǒng)相鄰日運行工況估算各水電站可能發(fā)電能力,并由上游到下游依次采用切負荷方法來快速生成初始解;然后將多階段決策問題分解為若干兩階段子問題進行求解,并將均勻試驗設(shè)計耦入各階段決策變量集合的構(gòu)造工作,指導(dǎo)算法優(yōu)選少數(shù)富有代表性的決策變量,大幅減少運算量與存儲量,進而降低方法的計算復(fù)雜度;同時,在尋優(yōu)過程中將多重復(fù)雜運行約束統(tǒng)一集成至指定約束,以動態(tài)辨識可行搜索空間,進而降低算法的計算消耗。工程應(yīng)用結(jié)果表明,所提方法可快速獲得滿意調(diào)度結(jié)果,能夠切實服務(wù)于水電調(diào)度運行工作的開展。
[Abstract]:Due to the influence of many factors, such as the increasing scale of the system, the increasingly fine dispatching requirements and the increasingly complex set of constraints, how to quickly formulate a reasonable power generation dispatching plan is a key scientific problem faced by the joint operation of hydropower stations. It is mainly reflected in three aspects: the quick generation mechanism of initial solution, the scientific identification model of decision space and the effective optimal scheduling method. For this reason, from the point of view of engineering practicality, a uniform stepwise optimization method for solving the problem of joint peak-shaving operation of hydropower stations is proposed. In this method, the potential power generation capacity of hydropower stations is estimated according to the daily operating conditions of hydropower system, and the initial solution is generated quickly by load shedding method from upstream to downstream. Then the multi-stage decision problem is decomposed into several two-stage sub-problems, and the uniform test design is coupled into the set of decision variables to guide the algorithm to select a few representative decision variables. The computational complexity of the method is greatly reduced by reducing the amount of computation and storage, and at the same time, the multi-complex running constraints are integrated into the specified constraints in the optimization process to dynamically identify the feasible search space, thus reducing the computational cost of the algorithm. The engineering application results show that the proposed method can quickly obtain satisfactory dispatching results and can effectively serve the development of hydropower dispatching operation.
【作者單位】: 華中科技大學(xué)水電與數(shù)字化工程學(xué)院;大連理工大學(xué)水電與水信息研究所;
【基金】:國家自然科學(xué)基金項目(91547201,51210014) 國家重點基礎(chǔ)研究發(fā)展計劃項目(973項目)(2013CB035906)~~
【分類號】:TM73

【相似文獻】

相關(guān)期刊論文 前10條

1 崔清溪,王智中;用矩陣運算求解水電站群最優(yōu)裝機容量[J];長江水利教育;1993年02期

2 馬元s,

本文編號:2082956


資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2082956.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶0958b***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com