1000MW級機組接入220kV電網技術條件研究
發(fā)布時間:2018-06-17 22:38
本文選題:MW級機組 + kV電網 ; 參考:《電網與清潔能源》2016年09期
【摘要】:隨著負荷和網架的發(fā)展,近年來負荷中心的1 000 MW級機組電力就近消納的趨勢越來越明顯,但1 000 MW級接入220 kV電網目前還處于探索階段,缺乏實際運行經驗。研究1 000 MW級機組接入220 kV電網的積極效用和對電網運行的影響,尋找限制接入的主要因素;將制約因素轉換為對系統(tǒng)短路容量和機組接入距離的要求,在同一個坐標系內利用圖解法進行分析。結果較為直觀地體現了各因素的不同影響效力。以上海某220 kV電網為例,提出開展1 000 MW級機組接入220 kV電網試點的設想,得出了在某些典型供電分區(qū)內1 000 MW機組接入220 kV電網的主要技術條件。
[Abstract]:With the development of load and grid, in recent years, it is more and more obvious that the power of 1 000 MW units in the load center is getting closer and lower. However, it is still in the exploration stage for 1 000 MW to connect to 220 kV power network, and it is lack of practical operation experience. This paper studies the positive utility of 1 000 MW units connecting to 220 kV power network and its influence on the operation of the network, finds out the main factors restricting the access, and converts the restrictive factors into the requirements for the short circuit capacity of the system and the access distance of the units. In the same coordinate system, the graphic method is used to analyze. Results the effects of different factors were reflected intuitively. Taking a 220 kV power network in Shanghai as an example, this paper puts forward a tentative idea of connecting 1 000 MW units to 220 kV power network, and obtains the main technical conditions for 1 000 MW units to connect to 220 kV power network in some typical power supply zones.
【作者單位】: 國網上海市電力公司;中國電力工程顧問集團華東電力設計院有限公司;
【基金】:國家自然基金資助項目(51307104)~~
【分類號】:TM732
【相似文獻】
相關期刊論文 前10條
1 ;我國將建1200MW超超臨界燃煤發(fā)電機組[J];上海電力;2009年02期
2 黃立;;20MW貫流式水輪發(fā)電機運行研究[J];科技創(chuàng)新導報;2012年29期
3 佟瑞新,李日新;登封電廠55MW雙水內冷汽輪發(fā)電機技術特點、安裝及運行[J];電站系統(tǒng)工程;1996年05期
4 ;全國電力行業(yè)在我省舉辦技能大比武——全國電力行業(yè)200 MW、300 MW火電機組機、爐、電運行值班員及300 MW集控值班員技能競賽在南京隆重舉行[J];江蘇電機工程;2001年03期
5 馬元s,
本文編號:2032734
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2032734.html
最近更新
教材專著