基于IEC 61850標(biāo)準(zhǔn)的智能調(diào)度系統(tǒng)源端維護研究
本文選題:IEC + 61850; 參考:《西南交通大學(xué)》2017年碩士論文
【摘要】:目前,國內(nèi)電網(wǎng)系統(tǒng)正處于一個飛速發(fā)展階段,常規(guī)變電站自動化系統(tǒng)開始暴露出一些不足。二次設(shè)備彼此間互操作性差,變電站之間信息共享難以實現(xiàn),系統(tǒng)的可擴展能力薄弱等都成為制約智能電網(wǎng)發(fā)展的重要因素。這些問題的關(guān)鍵還在于變電站和調(diào)度中心各自獨立建模,使得彼此之間模型存在差異,難以實現(xiàn)無縫操作。針對這一現(xiàn)狀,展開了對智能調(diào)度系統(tǒng)源端維護技術(shù)的研究。本文首先對比分析了調(diào)度中心和變電站之間建模的差異,在現(xiàn)有的一些模型融合方法的基礎(chǔ)上,討論了調(diào)度中心采用IEC61850標(biāo)準(zhǔn)建模的可行性,并給出了一種基于IEC 61850標(biāo)準(zhǔn)的源端維護解決方案。在該方案中,首先給出了一種SCD文件篩選技術(shù),來解決不同調(diào)度中心對變電站模型信息需求不一致的問題。該技術(shù)對變電站配置描述文件(SCD)按電壓等級進行篩選,并剔除調(diào)度中心不關(guān)心的部分,生成新的帶指定電壓等級的SCD文件,并按需上送至調(diào)度中心。通過這種技術(shù),從變電站端解決了 SCD模型文件完整上傳占用網(wǎng)絡(luò)資源,增加調(diào)度中心工作量的問題。其次在實現(xiàn)源端維護的遠(yuǎn)動通信方面,采用了基于IEC61850標(biāo)準(zhǔn)的MMS+TCP/IP模型結(jié)構(gòu),給出了通信結(jié)構(gòu)及實現(xiàn)方法。該模型的優(yōu)勢在于采用MMS作為應(yīng)用層通信協(xié)議,網(wǎng)絡(luò)層和鏈路層采用TCP/IP協(xié)議,通過以太網(wǎng)傳輸,可以滿足源端維護對實時通信及模型傳輸?shù)囊。論文最后設(shè)計了驗證文中源端維護功能的仿真界面,給出源端維護的仿真流程,并在實驗室環(huán)境下以孟姜子站為例仿真驗證了該源端維護方法的可行性。全文著眼于源端維護技術(shù)的實現(xiàn)方法和過程,符合目前智能電網(wǎng)的發(fā)展方向,論文所研究的源端維護方法,以現(xiàn)有技術(shù)為基礎(chǔ),有較好的現(xiàn)實意義,對未來智能電網(wǎng)實現(xiàn)無縫通信也有一定的推動作用。
[Abstract]:At present, the domestic power grid system is in a rapid development stage, the conventional substation automation system began to expose some shortcomings. The poor interoperability of secondary equipment, the difficulty of information sharing among substations, and the weakness of the system's extensibility are the important factors restricting the development of smart grid. The key to these problems lies in the independent modeling of substation and dispatching center, which makes the models of substation and dispatching center different and difficult to operate seamlessly. In view of this situation, the source maintenance technology of intelligent scheduling system is studied. In this paper, the difference of modeling between dispatching center and substation is analyzed. On the basis of some existing model fusion methods, the feasibility of using IEC61850 standard to model dispatching center is discussed. A source-side maintenance solution based on IEC 61850 is presented. In this scheme, firstly, a SCD file filtering technique is presented to solve the problem that different dispatching centers need different substation model information. In this technique, the substation configuration description file is screened according to the voltage level, and the new SCD file with the specified voltage level is generated and sent to the dispatching center on demand by excluding the unconcerned part of the dispatching center. Through this technique, the problem of SCD model file upload and occupy network resource is solved from substation terminal, and the workload of dispatching center is increased. Secondly, the MMS TCP/IP model structure based on IEC61850 standard is used to realize the remote communication of source terminal maintenance, and the communication structure and implementation method are given. The advantage of this model is that it uses MMS as application layer communication protocol, network layer and link layer adopt TCP/IP protocol and transmit through Ethernet, which can meet the requirements of source side maintenance for real-time communication and model transmission. Finally, the simulation interface is designed to verify the function of source maintenance in the paper, and the simulation flow of source maintenance is given. The feasibility of the method is verified by the example of Meng Jiang Zi Station in laboratory. The full text focuses on the realization method and process of source-end maintenance technology, which is in line with the development direction of smart grid at present. The source-end maintenance method studied in this paper is based on the existing technology and has good practical significance. The future smart grid to achieve seamless communication also has a certain role in promoting.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TM76;TM73
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 謝曉華;;淺談供水企業(yè)調(diào)度中心的建設(shè)及其展望[J];計算機光盤軟件與應(yīng)用;2013年12期
2 朱曉龍 ,丁海祥;“江蘇京滬”調(diào)度中心組織員工學(xué)習(xí)《條例》[J];交通企業(yè)管理;2003年01期
3 張磊;勵剛;汪德星;李建華;曹路;王斌;葛朝強;;華東電網(wǎng)高級調(diào)度中心建設(shè)一期實踐綜述[J];華東電力;2009年06期
4 計丹光;;城市電網(wǎng)抵抗災(zāi)難能力的提高[J];江蘇電機工程;2006年01期
5 潘繼雄;禹仲明;胡傳豹;;搭建計量調(diào)度中心 提升負(fù)控實用化[J];大眾用電;2012年04期
6 郁薛春;;美國聯(lián)合電力公司調(diào)度中心簡介[J];上海電力;1998年06期
7 方波;石恒初;;關(guān)愛和激勵是人才成長的催化劑[J];云南電業(yè);2010年11期
8 王治華;;安全運營中心及其在調(diào)度中心二次系統(tǒng)中的應(yīng)用[J];電力系統(tǒng)自動化;2007年22期
9 ;天津電網(wǎng)備用調(diào)度中心通過驗收[J];東北電力技術(shù);2011年07期
10 涂舸;李純;;曖昧與復(fù)調(diào)——四川投資集團調(diào)度中心[J];建筑與文化;2012年01期
相關(guān)會議論文 前3條
1 鄭家麒;;談煤氣調(diào)度中心的功能和作用[A];2004全國能源與熱工學(xué)術(shù)年會論文集(2)[C];2004年
2 趙喜成;;白龍江流域調(diào)度中心建設(shè)的思考[A];全國大中型水電廠技術(shù)協(xié)作網(wǎng)第十屆(2013年)年會論文集[C];2013年
3 陳飛;丁士明;蔣亞坤;;調(diào)度中心管理信息大區(qū)硬件基礎(chǔ)架構(gòu)設(shè)計[A];2010年云南電力技術(shù)論壇論文集(文摘部分)[C];2010年
相關(guān)重要報紙文章 前10條
1 本報記者 黃穎;一個電話方便叫車 我市擬建出租車調(diào)度中心[N];成都日報;2009年
2 王佳;浙江備用調(diào)度中心啟用[N];國家電網(wǎng)報;2010年
3 王博邋宋巍;沈陽調(diào)度中心上半年動火施工創(chuàng)佳績[N];石油管道報;2008年
4 林海宇;華東公司高級調(diào)度中心建設(shè)啟動[N];國家電網(wǎng)報;2008年
5 記者劉一民;調(diào)度中心走到“上游”除隱患[N];華北電力報;2010年
6 記者 王莉;攀枝花局調(diào)度中心:全力以赴 夯實基礎(chǔ)[N];西南電力報;2008年
7 記者 張揚;川電調(diào)度中心安全周期創(chuàng)全國之最[N];西南電力報;2001年
8 通訊員 李慶;四川南充備用調(diào)度中心試運營[N];中國電力報;2008年
9 記者 徐華南;白城引嫩入白調(diào)度中心落成[N];長春日報;2009年
10 通訊員 王佳;浙江備用調(diào)度中心正式啟用[N];中國電力報;2010年
相關(guān)碩士學(xué)位論文 前3條
1 李東陽;基于IEC 61850標(biāo)準(zhǔn)的智能調(diào)度系統(tǒng)源端維護研究[D];西南交通大學(xué);2017年
2 王亞洲;兗礦集團多媒體調(diào)度中心的研究與設(shè)計[D];西安科技大學(xué);2011年
3 鄧團飛;基于Cortex A8的AGV系統(tǒng)研究[D];杭州電子科技大學(xué);2015年
,本文編號:1826337
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/1826337.html