焦坪礦區(qū)某井田綜采覆巖導(dǎo)水裂隙帶高度研究
發(fā)布時間:2018-05-01 17:28
本文選題:導(dǎo)水裂隙帶 + 經(jīng)驗公式 ; 參考:《煤礦安全》2015年S1期
【摘要】:為了研究在綜放開采條件下覆巖導(dǎo)水裂隙帶高度的發(fā)展規(guī)律,以焦坪礦一盤區(qū)1418工作面為地質(zhì)原型,應(yīng)用經(jīng)驗公式計算并結(jié)合現(xiàn)場實測數(shù)據(jù)、計算機(jī)數(shù)值模擬(FLAC3D有限差分軟件和UDEC離散元軟件)和物理相似材料模擬實驗方法,對工作面4-2號煤層采動后造成的覆巖變形破壞情況進(jìn)行分析,并對導(dǎo)水裂隙帶發(fā)育高度進(jìn)行預(yù)測。研究表明:該礦1418工作面綜放開采巨厚煤層覆巖導(dǎo)水裂隙帶高度為采厚的近26倍。
[Abstract]:In order to study the development law of the height of the overburden water conductivity fissure zone under the condition of fully mechanized caving mining, taking 1418 face in the first section of Jiaoping Coal Mine as the geological prototype, the empirical formula is used to calculate and combine with the field measured data. Computer numerical simulation, FLAC3D finite difference software and UDEC discrete element software) and physical similar material simulation experiment method are used to analyze the deformation and failure of overburden rock caused by mining coal seam 4-2. The height of the fracture zone is predicted. The study shows that the height of the overburden rock permeability fissure zone in fully mechanized caving mining of 1418 face is nearly 26 times as high as the mining thickness.
【作者單位】: 中煤科工集團(tuán)西安研究院有限公司;陜西省煤礦水害防治技術(shù)重點(diǎn)實驗室;西安科技大學(xué)地質(zhì)與環(huán)境學(xué)院;
【分類號】:TD745
【參考文獻(xiàn)】
相關(guān)期刊論文 前7條
1 陳榮華;白海波;馮梅梅;;綜放面覆巖導(dǎo)水裂隙帶高度的確定[J];采礦與安全工程學(xué)報;2006年02期
2 戴露;譚海樵;胡戈;;綜放開采條件下導(dǎo)水裂隙帶發(fā)育規(guī)律探測[J];煤礦安全;2009年03期
3 高喜才;伍永平;;特厚煤層富水覆巖采動裂隙動態(tài)分布特征模擬研究[J];煤礦安全;2011年03期
4 涂敏;潘謝礦區(qū)采動巖體裂隙發(fā)育高度的研究[J];煤炭學(xué)報;2004年06期
5 仇圣華;楊志錫;劉光照;曹福輝;劉猛;褚衍江;;煤層開采后覆巖導(dǎo)水裂隙帶高度的模擬研究[J];煤礦安全;2013年06期
6 劉s,
本文編號:1830385
本文鏈接:http://sikaile.net/kejilunwen/anquangongcheng/1830385.html
最近更新
教材專著