W河綜合治理項目的融資研究
發(fā)布時間:2019-04-08 17:29
【摘要】:一直以來,水利在我國經(jīng)濟建設中扮演著十分重要的角色,是國家治國安邦的戰(zhàn)略重點。洞庭湖是長江中下游重要的防洪蓄洪湖泊,位于洞庭湖的W河地區(qū)防災減災的任務十分繁重,為改善其周邊生態(tài)環(huán)境特啟動了專項規(guī)劃工作。水利建設是其重中之重,而融資問題又是水利建設的關鍵所在。W河綜合治理項目融資在融資體制方面還存在一定的問題亟待解決。面對后金融危機時期全球經(jīng)濟增長乏力、國內(nèi)經(jīng)濟發(fā)展增長趨緩的水利項目建設新形勢,積極探索和創(chuàng)新水利項目融資模式,是當前水利發(fā)展面臨的一項艱巨任務。 本文從水利建設項目融資現(xiàn)狀入手,首先介紹了水利項目的特點及經(jīng)濟評價相關理論知識,通過綜合國內(nèi)外一些水利建設融資案例,歸納總結了目前W河綜合治理項目的融資現(xiàn)狀和存在的項目繁多、投資規(guī)模大、建設期長、投資不可逆等問題。在W河綜合治理項目經(jīng)有關部門核定批復的初步設計報告的概預算基礎上,擬定了項目融資方案并對方案的財務可行性、經(jīng)濟評價以及風險因素進行了較為細致地分析,論證了融資方案的可行性,為W河綜合治理項目融資方案提供了科學的依據(jù),有針對性的從長遠和發(fā)展角度為W河綜合治理的融資提供科學可持續(xù)發(fā)展的對策與建議。最后,對水利項目融資的未來發(fā)展提出了展望,以期推動洞庭湖區(qū)水利項目建設融資新的體制機制建立,促進水利建設融資方式逐步實現(xiàn)和進入良好運行狀態(tài),構建生態(tài)文明的生態(tài)經(jīng)濟區(qū)。
[Abstract]:Water conservancy has been playing a very important role in the economic construction of our country, and it is the strategic focus of the state to govern the country. Dongting Lake is an important flood control and flood storage lake in the middle and lower reaches of the Yangtze River. The task of disaster prevention and mitigation in W River area located in Dongting Lake is very onerous. Special planning work has been initiated to improve its surrounding ecological environment. Water conservancy construction is the most important and financing problem is the key to water conservancy construction. There are still some problems to be solved in the financing system of W river comprehensive management project. In the face of the weak global economic growth in the post-financial crisis period, the new situation of water conservancy project construction with the domestic economic growth slowing down, actively exploring and innovating the financing mode of water conservancy projects is an arduous task facing the current water conservancy development. Starting with the present situation of water conservancy construction project financing, this paper first introduces the characteristics of water conservancy project and the relevant theoretical knowledge of economic evaluation, and through the synthesis of some domestic and foreign financing cases of water conservancy construction, This paper summarizes the current financing situation and existing problems of W River comprehensive management projects, such as large scale of investment, long construction period, irreversible investment and so on. On the basis of the budget estimate of the preliminary design report approved and approved by the departments concerned, the project financing scheme is drawn up and the financial feasibility, economic evaluation and risk factors of the project are analyzed in detail. This paper demonstrates the feasibility of the financing scheme, provides a scientific basis for the financing scheme of the W River comprehensive management project, and provides scientific and sustainable development countermeasures and suggestions for the W River comprehensive management financing from the perspective of long-term and development. Finally, the future development of water conservancy project financing is prospected in order to promote the establishment of a new system and mechanism of water conservancy project construction financing in Dongting Lake area, and to promote the gradual realization and entry into a good operation state of water conservancy project financing mode. Construct ecological economic zone of ecological civilization.
【學位授予單位】:中南大學
【學位級別】:碩士
【學位授予年份】:2013
【分類號】:F406.72;F426.91
本文編號:2454770
[Abstract]:Water conservancy has been playing a very important role in the economic construction of our country, and it is the strategic focus of the state to govern the country. Dongting Lake is an important flood control and flood storage lake in the middle and lower reaches of the Yangtze River. The task of disaster prevention and mitigation in W River area located in Dongting Lake is very onerous. Special planning work has been initiated to improve its surrounding ecological environment. Water conservancy construction is the most important and financing problem is the key to water conservancy construction. There are still some problems to be solved in the financing system of W river comprehensive management project. In the face of the weak global economic growth in the post-financial crisis period, the new situation of water conservancy project construction with the domestic economic growth slowing down, actively exploring and innovating the financing mode of water conservancy projects is an arduous task facing the current water conservancy development. Starting with the present situation of water conservancy construction project financing, this paper first introduces the characteristics of water conservancy project and the relevant theoretical knowledge of economic evaluation, and through the synthesis of some domestic and foreign financing cases of water conservancy construction, This paper summarizes the current financing situation and existing problems of W River comprehensive management projects, such as large scale of investment, long construction period, irreversible investment and so on. On the basis of the budget estimate of the preliminary design report approved and approved by the departments concerned, the project financing scheme is drawn up and the financial feasibility, economic evaluation and risk factors of the project are analyzed in detail. This paper demonstrates the feasibility of the financing scheme, provides a scientific basis for the financing scheme of the W River comprehensive management project, and provides scientific and sustainable development countermeasures and suggestions for the W River comprehensive management financing from the perspective of long-term and development. Finally, the future development of water conservancy project financing is prospected in order to promote the establishment of a new system and mechanism of water conservancy project construction financing in Dongting Lake area, and to promote the gradual realization and entry into a good operation state of water conservancy project financing mode. Construct ecological economic zone of ecological civilization.
【學位授予單位】:中南大學
【學位級別】:碩士
【學位授予年份】:2013
【分類號】:F406.72;F426.91
【參考文獻】
相關期刊論文 前10條
1 陳鵬;;我國政府財政投融資研究[J];才智;2010年08期
2 王麗;;淺談水利工程管理單位資金管理[J];中國城市經(jīng)濟;2011年23期
3 陳鵬;;財政投融資研究綜述[J];財經(jīng)政法資訊;2009年06期
4 陳瑜;陳曉紅;;區(qū)域生態(tài)現(xiàn)代化評價指標及實證研究[J];系統(tǒng)工程;2010年04期
5 趙瑾璐;趙倩倩;;PPP-BASED BOT模式在我國市政公用事業(yè)改革中的應用及實證分析——以蘭州威立雅水務集團合作項目為例[J];甘肅理論學刊;2011年03期
6 王廣深;;美國水利融資制度及其啟示[J];管理現(xiàn)代化;2012年01期
7 程聯(lián)濤;;水利投融資政策成效分析及對策研究——基于我國部分省份的考察[J];貴州社會科學;2012年06期
8 李華;;組建企業(yè)集團推進水利企業(yè)發(fā)展的思考[J];海河水利;2012年02期
9 蔡靖方,劉國炳;武漢城市經(jīng)濟圈規(guī)劃的初步設想[J];華中師范大學學報(自然科學版);2005年02期
10 李俠;;地方政府投融資平臺的風險成因與規(guī)范建設[J];經(jīng)濟問題探索;2010年02期
,本文編號:2454770
本文鏈接:http://sikaile.net/jingjilunwen/kuaiji/2454770.html
最近更新
教材專著