芮城縣電網(wǎng)規(guī)劃
[Abstract]:Power grid planning is an important part of economic and social development planning. A scientific, economical and reasonable power network planning can not only guide the future construction and development of the power grid, improve the power supply capacity and reliability of the power system, but also meet the needs of people's daily life and economic and social development. And can achieve good economic and social benefits. At the same time, the changes of energy structure and power consumption structure, the rapid growth of power load and the continuous improvement of power supply reliability, also put forward a lot of new challenges to power network planning. Based on the current historical power consumption data of Ruicheng County, this paper grasps the historical load through data analysis. Based on the historical load data of recent years, the basic grey forecasting model is used to estimate the predicted annual load, and the validity of the forecasting model is compared with the actual value. According to the economic development of Ruicheng County, this paper uses the power consumption method, the load density method, the time series fitting and the basic grey model to forecast and analyze the future industrial and residential electricity consumption in Ruicheng County. And combined with the distribution network status of the overall distribution network planning. Firstly, from the analysis of the maximum load of electricity consumption and the future planning year of Ruicheng County, it can be concluded that the high-voltage power station can not meet the needs of the current urban residents and economic development in Ruicheng County, so it is necessary to speed up the investment in the construction of the high-voltage power station. According to the future development of Ruicheng County and the situation of electricity consumption, this paper puts forward the plan of grid planning and renovation in Ruicheng County. Substation distribution planning, from the previous 10 high-voltage power station area, to 13 high-voltage power station area. According to the geographical environment, it is decided to add the corresponding facilities such as Yangcheng Substation, Chaijian Substation, Guren Substation and so on. Secondly, according to Ruicheng County 110kV substation planning layout, in Bateshan, Dongcun construction 35kV substation 2. Through the construction of high-voltage substation, it can effectively enhance the high-voltage load capacity of Ruicheng County. The T-, 蟺 hybrid structure in the double chain is recommended as the target grid on the circuit. Through the implementation of the above planning and transformation program, to meet the future Ruicheng County industrial and residential electricity demand. Finally, according to the characteristics of Ruicheng county power grid construction, the measures to improve the power quality level of Ruicheng County are put forward. From the point of view of technology and management, this paper discusses the methods of short circuit, line loss and reliability control in order to improve the power quality of Ruicheng County.
【學(xué)位授予單位】:燕山大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2016
【分類號(hào)】:TM715
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張文淵;淺談小城鎮(zhèn)建設(shè)中的電網(wǎng)規(guī)劃[J];農(nóng)業(yè)機(jī)械化與電氣化;2000年05期
2 孫金華;試談廠網(wǎng)分開(kāi)后的電網(wǎng)規(guī)劃[J];山東電力技術(shù);2000年04期
3 于會(huì)萍,劉繼東,程浩忠,陳章潮,馬則良;電網(wǎng)規(guī)劃方案的成本效益分析與評(píng)價(jià)研究[J];電網(wǎng)技術(shù);2001年07期
4 吳耀文,詹智紅;強(qiáng)化電網(wǎng)規(guī)劃 夯實(shí)穩(wěn)定基礎(chǔ)[J];湖北電力;2002年04期
5 陳光英;縣城電網(wǎng)規(guī)劃淺議[J];農(nóng)村電工;2003年03期
6 張運(yùn)洲;我國(guó)電網(wǎng)規(guī)劃與發(fā)展中的幾個(gè)具體問(wèn)題(英文)[J];Electricity;2003年04期
7 李新中,萬(wàn)衛(wèi);江西500kV電網(wǎng)規(guī)劃調(diào)整研究[J];江西電力;2005年03期
8 王吉權(quán);趙玉林;;電網(wǎng)規(guī)劃的研究方法及特點(diǎn)[J];農(nóng)村電氣化;2006年02期
9 蔡麗寧;;莆田電網(wǎng)規(guī)劃分析[J];農(nóng)村電工;2006年03期
10 陸立民;;加強(qiáng)電網(wǎng)裕度分析 做好電網(wǎng)規(guī)劃[J];供用電;2006年02期
相關(guān)會(huì)議論文 前10條
1 邊昱鵬;任定虎;;曲靖地區(qū)電網(wǎng)規(guī)劃支撐系統(tǒng)的設(shè)計(jì)開(kāi)發(fā)[A];2010年云南電力技術(shù)論壇論文集(優(yōu)秀論文部分)[C];2010年
2 吳琳;劉文哲;崔榮花;;一種電網(wǎng)規(guī)劃方案評(píng)價(jià)的方法[A];山東電機(jī)工程學(xué)會(huì)2012年度學(xué)術(shù)年會(huì)論文集[C];2012年
3 趙建寧;鄭外生;張虹;肖玲;錢(qián)紋;錢(qián)迎春;周俊東;沈建濤;張立;趙爽;;云南電網(wǎng)規(guī)劃技術(shù)設(shè)計(jì)原則的相關(guān)問(wèn)題論述[A];2008年云南電力技術(shù)論壇論文集[C];2008年
4 戚軼敏;;從美加大停電談電網(wǎng)規(guī)劃的重要性[A];首屆長(zhǎng)三角科技論壇——能源科技分論壇論文集[C];2004年
5 楊琳;;淺談電網(wǎng)規(guī)劃與電力設(shè)計(jì)對(duì)電網(wǎng)安全的考慮[A];山東電機(jī)工程學(xué)會(huì)第五屆供電專業(yè)學(xué)術(shù)交流會(huì)論文集[C];2008年
6 姜吉平;;市場(chǎng)競(jìng)爭(zhēng)環(huán)境下地區(qū)電網(wǎng)規(guī)劃的思考[A];山東電機(jī)工程學(xué)會(huì)第五屆供電專業(yè)學(xué)術(shù)交流會(huì)論文集[C];2008年
7 姜吉平;;市場(chǎng)競(jìng)爭(zhēng)環(huán)境下地區(qū)電網(wǎng)規(guī)劃的思考[A];山東電機(jī)工程學(xué)會(huì)第十二屆優(yōu)秀論文匯編[C];2011年
8 張聰;王濤;張寧;孫鵬;;人工智能優(yōu)化算法在電網(wǎng)規(guī)劃中的研究與應(yīng)用[A];山東電機(jī)工程學(xué)會(huì)2012年度學(xué)術(shù)年會(huì)論文集[C];2012年
9 麻常輝;馬濤;武乃虎;蔣哲;張丹丹;;輸電網(wǎng)規(guī)劃中不確定性因素的處理方法[A];2013年中國(guó)電機(jī)工程學(xué)會(huì)年會(huì)論文集[C];2013年
10 白朝果;;新形勢(shì)下電網(wǎng)規(guī)劃工作思考[A];華東六省一市電機(jī)工程(電力)學(xué)會(huì)輸配電技術(shù)研討會(huì)2002年年會(huì)山東電機(jī)工程學(xué)會(huì)交流論文集[C];2002年
相關(guān)重要報(bào)紙文章 前10條
1 本報(bào)評(píng)論員;大規(guī)劃 引領(lǐng)電網(wǎng)科學(xué)發(fā)展[N];國(guó)家電網(wǎng)報(bào);2010年
2 川渲;四川公司電網(wǎng)規(guī)劃中心揭牌成立[N];華中電力報(bào);2010年
3 李永強(qiáng);“十二五”電網(wǎng)規(guī)劃不能再拖了[N];中國(guó)能源報(bào);2013年
4 朱杰 劉斌鋒 楊凱;邵陽(yáng)電網(wǎng)規(guī)劃評(píng)估項(xiàng)目投資連續(xù)四年超十億元[N];邵陽(yáng)日?qǐng)?bào);2014年
5 ;電網(wǎng)規(guī)劃與建設(shè)(14)[N];中國(guó)電力報(bào);2001年
6 記者 朱明奎;積極創(chuàng)造條件 確保電網(wǎng)規(guī)劃和建設(shè)順利實(shí)施[N];民族日?qǐng)?bào);2009年
7 武勁松 常義仁;電網(wǎng)規(guī)劃與城市發(fā)展規(guī)劃對(duì)接[N];華東電力報(bào);2011年
8 記者 王永珍 通訊員 郭清梅;首批22個(gè)改革試點(diǎn)鎮(zhèn)將啟用全新電網(wǎng)規(guī)劃[N];福建日?qǐng)?bào);2011年
9 通訊員 張雅添;安康“十一五”電網(wǎng)規(guī)劃得到市政府高度肯定[N];安康日?qǐng)?bào);2006年
10 記者 吳棉 特約記者 許環(huán)峰 通訊員 吳乾標(biāo);文昌重新修編電網(wǎng)規(guī)劃[N];海南日?qǐng)?bào);2010年
相關(guān)博士學(xué)位論文 前10條
1 謝敏;電力市場(chǎng)環(huán)境下輸電網(wǎng)規(guī)劃建模及求解方法研究[D];華中科技大學(xué);2005年
2 劉思革;基于風(fēng)險(xiǎn)評(píng)估理論的輸電網(wǎng)絡(luò)擴(kuò)展規(guī)劃研究[D];上海交通大學(xué);2009年
3 楊麗徒;空間分析與電網(wǎng)規(guī)劃理論的研究[D];解放軍信息工程大學(xué);2004年
4 王一;電力市場(chǎng)環(huán)境下的多目標(biāo)輸電網(wǎng)優(yōu)化規(guī)劃方法研究[D];上海交通大學(xué);2008年
5 屈剛;考慮網(wǎng)絡(luò)輸電能力的多目標(biāo)輸電網(wǎng)規(guī)劃方法研究[D];上海交通大學(xué);2009年
6 付蓉;市場(chǎng)環(huán)境下基于阻塞激勵(lì)機(jī)制的輸電網(wǎng)擴(kuò)展規(guī)劃[D];東南大學(xué);2005年
7 田建偉;智能工程在智能輸電網(wǎng)規(guī)劃不確定性問(wèn)題建模中的應(yīng)用[D];北京交通大學(xué);2012年
8 湯紅衛(wèi);基于GIS的農(nóng)村電網(wǎng)規(guī)劃方法的研究[D];中國(guó)農(nóng)業(yè)大學(xué);2001年
9 李f ;市場(chǎng)機(jī)制下電網(wǎng)規(guī)劃研究[D];天津大學(xué);2009年
10 范宏;基于二層規(guī)劃方法的輸電網(wǎng)擴(kuò)展規(guī)劃研究[D];上海交通大學(xué);2008年
相關(guān)碩士學(xué)位論文 前10條
1 崔艷妍;電網(wǎng)規(guī)劃綜合評(píng)價(jià)方法研究與應(yīng)用[D];天津大學(xué);2008年
2 李渝;輸電網(wǎng)規(guī)劃方案經(jīng)濟(jì)評(píng)價(jià)方法的研究[D];華北電力大學(xué)(北京);2007年
3 段天琪;考慮風(fēng)電接入不確定性的電網(wǎng)規(guī)劃[D];東南大學(xué);2015年
4 董謙;芮城縣電網(wǎng)規(guī)劃[D];燕山大學(xué);2016年
5 侯智子;電網(wǎng)規(guī)劃綜合評(píng)價(jià)方法的研究[D];昆明理工大學(xué);2016年
6 黃心;基于概率盒理論的電網(wǎng)規(guī)劃方案中指標(biāo)不確定性建模研究[D];昆明理工大學(xué);2016年
7 司懷偉;基于概率盒的電網(wǎng)規(guī)劃靈敏度分析[D];昆明理工大學(xué);2016年
8 劉洋均;基于概率盒理論的電網(wǎng)規(guī)劃指標(biāo)相關(guān)性分析及融合方法的研究[D];昆明理工大學(xué);2016年
9 張永祥;哈爾濱市公共服務(wù)視角下的地區(qū)電網(wǎng)規(guī)劃研究[D];哈爾濱工業(yè)大學(xué);2016年
10 羅陽(yáng)百;基于CIM/E的BPA模型拼接研究[D];華北電力大學(xué)(北京);2016年
,本文編號(hào):2319694
本文鏈接:http://sikaile.net/jingjilunwen/jiliangjingjilunwen/2319694.html