SECC公司ABC監(jiān)理項(xiàng)目人力資源管理研究
[Abstract]:The ABC hydropower station is located in the west of Conakry, the capital of the Republic of Guinea in West Africa. The government of the Republic of Guinea has commissioned a well-known multinational general contracting enterprise in China to build it under the "Design-Purchasing-Construction" contract model. Entrusted by the general contractor, SECC supervises the construction quality, progress, safety and civilization during the construction period within the scope of contract authorization. The ABC supervision project is the first foreign project undertaken by SECC after the strategy of expanding overseas market. To fully demonstrate the strength of SECC engineering project management, to continuously improve the general contractor's satisfaction, to train a group of people with international engineering project management experience, and to lay a good foundation for the development of overseas market, are the management objectives to be realized by ABC supervision project. In the face of different construction environment and different project management mode, there was a passive situation of team members in the initial stage of entry, which fully exposed the project management system of SECC Company. Project management experience and comprehensive quality of staff are extremely incompatible with the needs of the project. The most urgent task of project management is to stimulate the potential of team members, improve the overall quality of all members of the team, and change the passive situation quickly. This study combines the project management theory with the management practice of ABC supervision project, using the methods of literature analysis, investigation and summary, to study the human resource management of ABC supervision project. First of all, this paper introduces the background, research content, research significance and research ideas. Second, through consulting a large number of theoretical and applied research documents related to project human resources management, this paper reviews the relevant contents of project management, project human resources management, incentive, performance management and so on. This paper expounds the general situation of SECC Company and its ABC supervision project. Fourth, from the point of view of project manager, this paper constructs the employee incentive mechanism of ABC supervision project from the four dimensions of employee demand guarantee, work goal guidance, behavior constraint and performance management, and focuses on designing employee performance management scheme. Finally, through the practice of continuous improvement of incentive mechanism, and put forward their own views and suggestions. The purpose of this paper is to guide the practice of ABC supervision project management with project management theory, and to promote the overall realization of the project management goal. At the same time, it looks forward to providing reference for SECC company's subsequent foreign projects, and providing some ideas for the study of human resource management of similar supervision projects.
【學(xué)位授予單位】:電子科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:F426.61;F272.92
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李繼庭;;對(duì)工程監(jiān)理項(xiàng)目存在風(fēng)險(xiǎn)的探討[J];廣東科技;2007年05期
2 石磊;;通過貫標(biāo)全面推進(jìn)工程監(jiān)理項(xiàng)目的管理[J];河北建筑工程學(xué)院學(xué)報(bào);2008年02期
3 馬文龍;;現(xiàn)代企業(yè)管理模式下對(duì)監(jiān)理項(xiàng)目負(fù)責(zé)人的幾點(diǎn)要求[J];建設(shè)監(jiān)理;2011年04期
4 ;福建泉州:工程監(jiān)理項(xiàng)目全程網(wǎng)上招投標(biāo)[J];中國(guó)招標(biāo);2012年49期
5 張玲;;運(yùn)用成本預(yù)算方法確定監(jiān)理項(xiàng)目承包額度[J];湖南水利水電;2006年01期
6 高莉;;建設(shè)監(jiān)理項(xiàng)目部人性化管理初探[J];中小企業(yè)管理與科技(下旬刊);2009年07期
7 許鑫佳;;建設(shè)監(jiān)理項(xiàng)目部人性化管理初探[J];黑龍江科技信息;2010年19期
8 郭春;;抓好工程監(jiān)理項(xiàng)目部建設(shè)是監(jiān)理企業(yè)實(shí)現(xiàn)持續(xù)發(fā)展的必由之路[J];天津經(jīng)濟(jì);2010年09期
9 ;施工與監(jiān)理·監(jiān)理項(xiàng)目篇[J];建設(shè)科技;2010年24期
10 張丹;;淺談監(jiān)理企業(yè)監(jiān)理項(xiàng)目風(fēng)險(xiǎn)與防范對(duì)策[J];施工技術(shù);2010年S2期
相關(guān)重要報(bào)紙文章 前10條
1 特約通訊員 王成林 通訊員 屈吉平;“萬瑞”萬榮監(jiān)理項(xiàng)目部嚴(yán)把工程質(zhì)量關(guān)[N];運(yùn)城日?qǐng)?bào);2011年
2 孫常長(zhǎng);中標(biāo)晉城煤層氣開發(fā)工程監(jiān)理項(xiàng)目[N];中煤地質(zhì)報(bào);2007年
3 記者 劉萍;我省監(jiān)理項(xiàng)目順利通過驗(yàn)收[N];河北日?qǐng)?bào);2010年
4 合肥虹橋公路橋梁工程監(jiān)理有限責(zé)任公司 陳小虎邋宋治明;淺談監(jiān)理項(xiàng)目管理[N];巢湖日?qǐng)?bào);2008年
5 記者 顧今;上!皠(chuàng)建示范監(jiān)理項(xiàng)目部活動(dòng)”監(jiān)理企業(yè)簽約大會(huì)舉行[N];建筑時(shí)報(bào);2011年
6 嚴(yán)鴻華;貫徹落實(shí)監(jiān)理工作守則 深入開展“示范監(jiān)理項(xiàng)目部”活動(dòng)[N];建筑時(shí)報(bào);2012年
7 記者 李壽利 通訊員 孫李軍;陜西局中標(biāo)塔吉克斯坦煤礦勘探監(jiān)理項(xiàng)目[N];中煤地質(zhì)報(bào);2012年
8 北京鐵城建設(shè)監(jiān)理有限責(zé)任公司 邵福元;管理有奇道 創(chuàng)新展風(fēng)采[N];中華建筑報(bào);2008年
9 林 華;正確定位 準(zhǔn)確切入[N];建筑時(shí)報(bào);2005年
10 記者 張?jiān)破斟逋ㄓ崋T 葛志栓;大慶采八首批產(chǎn)能區(qū)塊投產(chǎn)[N];中國(guó)石油報(bào);2008年
相關(guān)碩士學(xué)位論文 前6條
1 吳敏;SECC公司ABC監(jiān)理項(xiàng)目人力資源管理研究[D];電子科技大學(xué);2014年
2 劉淑妮;工程監(jiān)理項(xiàng)目風(fēng)險(xiǎn)的可拓評(píng)價(jià)與研究[D];西安建筑科技大學(xué);2010年
3 馬明軍;淺析監(jiān)理項(xiàng)目中的組織結(jié)構(gòu)和溝通問題[D];廣西大學(xué);2005年
4 楊溪;油氣輸送鋼管駐廠監(jiān)理項(xiàng)目管理系統(tǒng)研究與設(shè)計(jì)[D];西安石油大學(xué);2013年
5 肖剛;建設(shè)監(jiān)理項(xiàng)目風(fēng)險(xiǎn)管理研究[D];南京理工大學(xué);2007年
6 羅建偉;淺析項(xiàng)目監(jiān)理項(xiàng)目的動(dòng)作模式[D];西南交通大學(xué);2003年
,本文編號(hào):2381103
本文鏈接:http://sikaile.net/jingjilunwen/gongyejingjilunwen/2381103.html