  幾乎所有公共基礎(chǔ)設(shè)施項(xiàng)目的主要目標(biāo)都是開發(fā)一種有效且高效的項(xiàng)目質(zhì)量產(chǎn)品,以滿足合法用戶的需求和期望。建造行業(yè)是促進(jìn)地區(qū)經(jīng)濟(jì)和社會(huì)可持續(xù)發(fā)展的關(guān)鍵部門之一。目前,許多發(fā)達(dá)國家和發(fā)展中國家都采用社區(qū)發(fā)展機(jī)制,旨在促進(jìn)經(jīng)濟(jì)增長,提高生活質(zhì)量及當(dāng)?shù)厣鐓^(qū)的社會(huì)福利。然而,建造行業(yè)項(xiàng)目延期的問題目前是一個(gè)全球性現(xiàn)象,在巴基斯坦大多數(shù)的基礎(chǔ)設(shè)施項(xiàng)目都會(huì)延期,且項(xiàng)目成功率很低,特別是公共基礎(chǔ)設(shè)施項(xiàng)目。項(xiàng)目的發(fā)起來自于社區(qū)的需求,為了實(shí)現(xiàn)社區(qū)的需求和效益,主要利益相關(guān)者的基本目標(biāo)就是在預(yù)計(jì)的時(shí)間和預(yù)算內(nèi)完成項(xiàng)目,并達(dá)到預(yù)期的質(zhì)量目標(biāo)。因此,識(shí)別關(guān)鍵的延期因素并探討這些因素如何影響當(dāng)?shù)厣鐓^(qū)至關(guān)重要。此外,了解計(jì)劃和決策制定過程中的社區(qū)參與情況,以更好地執(zhí)行公共基礎(chǔ)設(shè)施項(xiàng)目也很有必要。然而,現(xiàn)有研究缺乏公共基礎(chǔ)設(shè)施項(xiàng)目延期對(duì)當(dāng)?shù)厣鐓^(qū)的影響的關(guān)注,以及巴基斯坦公共建設(shè)行業(yè)中社區(qū)參與對(duì)政府支持、組織創(chuàng)新和項(xiàng)目成功實(shí)踐的中介影響的實(shí)證分析。因此,本研究提出公共項(xiàng)目的延期會(huì)對(duì)當(dāng)?shù)厣鐓^(qū)的社會(huì)經(jīng)濟(jì)效益產(chǎn)生不利影響,社區(qū)參與在組織創(chuàng)新和政府支持影響項(xiàng)目成功中起重要的中介作用。該觀點(diǎn)的實(shí)證支持來自于從巴基斯坦當(dāng)?shù)厣鐓^(qū)和公共...

【文章頁數(shù)】:157 頁

【學(xué)位級(jí)別】:博士

【文章目錄】:
Abstract
摘要
Table of Major Symbols and Units
1 Introduction
    1.1 Research Objectives
    1.2 Research Questions
        1.2.1 Research Question 1
        1.2.2 Research Question 2
        1.2.3 Research Question 3
    1.3 Significance of the Study
    1.4 Research Scope and Limitation
2 Literature Review
    2.1 Infrastructure Project
        2.1.1 Economic/Physical Infrastructure Project
        2.1.2 Social Infrastructure Project
    2.2 Public Construction Industry
        2.2.1 Pakistan Public Construction Industry
        2.2.2 Project Plan and Development Process
        2.2.3 Project Approval Process
    2.3 The Role of Infrastructure for Socio-Economic Development
        2.3.1 The Rural Context of Public Infrastructure Development
    2.4 Prior Research on Causes and Effect of Project Delay
    2.5 Community Participation and Project Success
    2.6 Stakeholder Theory as a Theoretical Perspective
    2.7 Theoretical Framework of the Study
3 Research Methodology
    3.1 Research Philosophy and Paradigm
    3.2 Population Area and Sample
    3.3 Data Collection Process
    3.4 Data Collection Method
4 Analysis of Causes of Delay in Public Sector Infrastructure Projects
    4.1 Introduction
    4.2 Objectives of the Study
    4.3 Research Methodology
    4.4 Data Analysis
        4.4.1 Ranking of the Critical Delaying Factors
        4.4.2 Spearman's Rank Correlation
    4.5 Research Findings and Results
        4.5.1 General Characteristics of Respondents
        4.5.2 Ranking of Critical Delaying Factors
        4.5.3 Top Eight Most Critical Delaying Factors from Owners' View
        4.5.4 Top Eight Most Critical Delaying Factors from Contractors' View
        4.5.5 Top Eight Most Critical Delaying Factors from Combined View
        4.5.6 Analysis and Ranking of Overall Results by Delay Causes Groups
    4.6 Comparison of Owners' and Contractors' Views
    4.7 Discussion of Results
        4.7.1 Difficulties in Financing Project by Contractor
        4.7.2 Delay in Progress Payments
        4.7.3 Dispute on Land Usage
        4.7.4 Improper Project Feasibility Study
        4.7.5 Award Project to Lowest Bid Price
        4.7.6 Extreme Weather Conditions
        4.7.7 Inadequate Contractor Experience
        4.7.8 Insufficient Data Collection and Survey Before Design
    4.8 Comparison of Delay Factors of some Selected Asian Countries
    4.9 Conclusion and Recommendations
        4.9.1 Further Recommendations
    4.10 Chapter Summary
5 The Impact of Public Infrastructure Project Delay on the Community: A LocalCommunity Perspective
    5.1 Introduction
        5.1.1 Importance and Benefits of Infrastructure Projects
        5.1.2 Previous Studies on the Causes and Effects of Project Delays
    5.2 Research Methodology
    5.3 Research Data
        5.3.1 Primary List of Community Influencing Factors
        5.3.2 Questionnaire Design
        5.3.3 Population and Sample Size
        5.3.4 Data Reliability
    5.4 Data Analysis
        5.4.1 Economic-Related Factors
        5.4.2 Social-Related Factors
        5.4.3 Overall Ranking
        5.4.4 T-Test
        5.4.5 One-Way ANOVA
    5.5 Discussion
    5.6 Conclusion
    5.7 Chapter Summary
6 Public Construction Industries' Project Success Via Government Support andOrganizational Innovativeness:The Mediating Role of Community Participation
    6.1 Introduction
        6.1.1 Community Participation
        6.1.2 Project Success
        6.1.3 Government Support
        6.1.4 Organizational Innovativeness
    6.2 Model Hypothesis
        6.2.1 Government Support and Project Success
        6.2.2 Organizational Innovativeness and Project Success
        6.2.3 Government Support and Community Participation
        6.2.4 Organizational Innovativeness and Community Participation
        6.2.5 Community Participation and Project Success
        6.2.6 The Mediating Role of Community Participation
    6.3 Research Methodology
        6.3.1 Questionnaire Design
        6.3.2 Sample and Data Collection
    6.4 Analysis and Results
        6.4.1 Measurement Instrument and Construct Measures
        6.4.2 Non-Response Bias Test
        6.4.3 Model Assessment
    6.5 Discussion
    6.6 Conclusion
    6.7 Chapter Summary
7 Summary and Conclusion
    7.1 Theoretical Contribution
    7.2 Practical Contribution
    7.3 Limitation of Research
        7.3.1 For Research Question 1
        7.3.2 For Research Question 2
        7.3.3 For Research Question 3
    7.4 Recommendation for Future Research
Abstract of Innovative Points
References
Appendices
Research Projects and Publications during PhD Period
Acknowledgement
Dedication
Curriculum Vitae



本文編號(hào):3868102

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/jingjifazhanlunwen/3868102.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶bcc06***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com
亚洲综合天堂一二三区| 午夜传媒视频免费在线观看| 欧美美女视频在线免费看| 欧美午夜不卡在线观看| 成人国产激情福利久久| 国产麻豆精品福利在线| 一二区不卡不卡在线观看| 我想看亚洲一级黄色录像| 丰满人妻少妇精品一区二区三区| 国产精品欧美在线观看| 婷婷亚洲综合五月天麻豆| 国产美女网红精品演绎| 午夜亚洲少妇福利诱惑| 少妇福利视频一区二区| 国产极品粉嫩尤物一区二区| 欧美成人国产精品高清| 欧美精品久久99九九| 91香蕉视频精品在线看| 天海翼精品久久中文字幕| 国产精品福利精品福利| 国产情侣激情在线对白| 国产毛片av一区二区三区小说| 亚洲熟女诱惑一区二区| 国产欧美性成人精品午夜| 偷拍洗澡一区二区三区| 日木乱偷人妻中文字幕在线| 亚洲夫妻性生活免费视频| 日本深夜福利视频在线| 欧美黑人暴力猛交精品| 日韩精品视频免费观看| 日韩人妻欧美一区二区久久| 国产水滴盗摄一区二区| 国产欧美一区二区三区精品视| 欧美日韩在线第一页日韩| 国产精品推荐在线一区| 国产精品二区三区免费播放心 | 亚洲国产一级片在线观看| 91精品视频免费播放| 麻豆国产精品一区二区三区| 亚洲综合激情另类专区老铁性| 空之色水之色在线播放|