代建制下保障房成本控制研究
本文選題:代建制 + 保障房; 參考:《東南大學》2017年碩士論文
【摘要】:近年以來國家和地方大力推行保障房建設,在巨大的建設任務之下單靠各級、各地政府的財力、人力和技術經(jīng)驗往往在短期內不能完成下達任務,傳統(tǒng)的政府直接建設模式己經(jīng)不能滿足現(xiàn)階段保障房投資建設的需求。目前政府開始借鑒國內外先進的建設模式,利用開發(fā)經(jīng)驗成熟的開發(fā)商和工程承包商進行項目代建,其成本雖總體受控,但影響工程成本的因素和問題頻現(xiàn),暴露出一些亟待解決的問題。本文采用定性分析與定量分析相結合的方法進行系統(tǒng)化研究,分析代建制保障房成本的現(xiàn)狀,并在傳統(tǒng)的時間維度和物質維度上,根據(jù)代建的特點和保障房的特點,引入代建制保障房的社會維度,結合相關項目的研究綜述,構建代建制下保障房成本控制問卷量表。本文通過對代建保障房和相關工程領域從業(yè)人員問卷調查和訪談,收集和整理數(shù)據(jù),應用SPSS因子分析,得到代建制下保障房成本控制的主要因子,分別是委托方因子F1、技術因子F2、溝通因子F3、合同管理因子F4、外界干擾因子F5、激勵因子F6。有助于在今后實踐管理中,各參建方管理有的放矢。本文對XX代建保障房項目進行回訪,進一步確認代建制保障房成本控制主要因子和征求相關解決措施和建議。在文獻研究和實證研究的基礎上,本文從組織措施、管理措施、技術措施、經(jīng)濟措施以及全壽命周期給予七個方面進行建議。期望能夠通過這些措施和建議有效控制代建制下保障房項目的成本。
[Abstract]:In recent years, the national and local governments have vigorously promoted indemnificatory apartment construction. Under the huge construction tasks, the financial, human and technical experience of local governments is often unable to complete the assigned tasks in a short period of time. The traditional government direct construction mode can not meet the demand of indemnificatory apartment investment. At present, the government has begun to draw lessons from the advanced construction models at home and abroad and use the developers and contractors with mature development experience to carry out the project construction. Although the cost of the project is generally controlled, the factors and problems affecting the cost of the project appear frequently. Some problems need to be solved. In this paper, the method of combining qualitative analysis with quantitative analysis is used to systematize the research, and the present situation of the cost of indemnificatory apartment is analyzed. In the traditional time dimension and material dimension, according to the characteristics of agent construction and the characteristics of indemnificatory apartment, This paper introduces the social dimension of agent indemnificatory apartment, and constructs the cost control questionnaire of indemnificatory apartment under agent system combined with the review of related projects. In this paper, through the questionnaire survey and interview of indemnificatory apartment and related engineering practitioners, the author collects and collates the data, and applies SPSS factor analysis to obtain the main factors of cost control of indemnificatory apartment under the agent construction system. They are fiduciary factor F1, technical factor F2, communication factor F3, contract management factor F4, external disturbance factor F5, incentive factor F6. Help in the future practice management, each party involved in the management targeted. This paper makes a return visit to XX agent indemnificatory apartment project, and further confirms the main factors of cost control of agent indemnificatory apartment and solicits relevant measures and suggestions. On the basis of literature research and empirical research, this paper gives seven suggestions from organizational measures, management measures, technical measures, economic measures and life cycle. Through these measures and suggestions, we hope to effectively control the cost of indemnificatory apartment project under agent system.
【學位授予單位】:東南大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:F299.23
【參考文獻】
相關期刊論文 前10條
1 林正敏;;廈門市保障性住房成本控制淺析[J];福建建筑;2015年01期
2 陳世山;;淺析我國保障性住房建設管理的新模式[J];廣西城鎮(zhèn)建設;2014年08期
3 張百勝;;安置房項目代建制的實踐與探討[J];工程建設與設計;2014年04期
4 王金清;;試論施工項目管理如何進一步優(yōu)化成本控制[J];城市建筑;2014年02期
5 李小靜;;施工項目成本控制技術方法探討[J];科技與企業(yè);2014年01期
6 周巍;牛艷艷;曲江泉;王云燕;;代建制在保障房建設中的應用研究[J];施工技術;2013年S2期
7 沈軍;俞曉鳴;程晉傳;;市政工程成本控制理論及方法研究[J];科技風;2013年23期
8 嵇建功;;建設單位工程項目成本管理研究——基于項目治理和內部控制視角[J];新會計;2013年11期
9 賈銘鈺;楊秀蕓;朱美潔;李招弟;;基于掙得進度的灰色Verhulst模型對工程工期的動態(tài)預測[J];北京城市學院學報;2013年05期
10 翟紅美;;施工項目成本控制存在的問題及對策[J];中小企業(yè)管理與科技(下旬刊);2013年10期
相關博士學位論文 前6條
1 方建;建設項目業(yè)主方組織文化、知識共享對項目績效的影響研究[D];同濟大學;2013年
2 吳仲兵;政府投資代建制項目監(jiān)管體系研究[D];北京交通大學;2013年
3 張桂蓉;企業(yè)—社區(qū)關系影響企業(yè)社區(qū)參與行為研究[D];中南大學;2013年
4 何旭東;基于利益相關者理論的工程項目主體行為風險管理研究[D];中國礦業(yè)大學;2011年
5 張國平;政府投資決策權研究[D];中國政法大學;2011年
6 尹琳琳;政府投資項目的投資控制問題研究[D];天津大學;2010年
相關碩士學位論文 前10條
1 劉平;云南建工集團保障房代建管理策略研究[D];云南大學;2014年
2 樊曦;基于代建制模式的保障性住房建設項目動態(tài)績效評價研究[D];重慶交通大學;2014年
3 胡寧;基于作業(yè)成本法的A企業(yè)成本控制研究[D];大連理工大學;2013年
4 李川;基于委托代理理論的政府投資項目代建制研究[D];重慶大學;2013年
5 李建明;基于價值工程的建設施工項目成本管理與控制研究[D];南昌大學;2012年
6 黃孝鵬;建筑工程施工項目成本風險管理研究[D];東北財經(jīng)大學;2012年
7 馬濤;基于代建模式的南京保障性住房投資控制研究[D];華中科技大學;2012年
8 龔關;保障性住房施工階段的成本控制研究[D];中南林業(yè)科技大學;2012年
9 鄭海玲;房地產(chǎn)項目成本控制過程與應用研究[D];天津大學;2012年
10 萬婷婷;造價控制在工程招投標階段的研究與應用[D];西安建筑科技大學;2012年
,本文編號:1937046
本文鏈接:http://sikaile.net/jingjifazhanlunwen/1937046.html