總承包項(xiàng)目前期決策和風(fēng)險(xiǎn)管理
發(fā)布時(shí)間:2018-05-07 17:59
本文選題:前期決策 + 風(fēng)險(xiǎn); 參考:《電力勘測(cè)設(shè)計(jì)》2017年02期
【摘要】:項(xiàng)目前期決策階段是決定總承包項(xiàng)目成功與否的關(guān)鍵環(huán)節(jié)。為提高決策的成功率,控制項(xiàng)目可能存在的風(fēng)險(xiǎn),應(yīng)當(dāng)建立合適的組織架構(gòu),輔以深化、細(xì)致、全面的前期決策工作,采用科學(xué)的風(fēng)險(xiǎn)控制流程,加強(qiáng)風(fēng)險(xiǎn)的預(yù)控,才能為項(xiàng)目實(shí)現(xiàn)預(yù)期目標(biāo)和提高項(xiàng)目實(shí)施效率提供可靠保障。
[Abstract]:The decision-making stage is the key to the success of the general contracting project. In order to improve the success rate of decision making and control the possible risk of the project, we should set up an appropriate organizational structure, be supplemented by a deep, meticulous and comprehensive pre-decision-making work, adopt a scientific risk control process, and strengthen the pre-control of the risk. Only then can the project achieve the desired goal and improve the project implementation efficiency to provide reliable guarantee.
【作者單位】: 中國(guó)電力工程顧問(wèn)集團(tuán)華東電力設(shè)計(jì)院有限公司;
【分類號(hào)】:F282
【相似文獻(xiàn)】
相關(guān)期刊論文 前1條
1 蘇和;;淺析中小學(xué)建設(shè)項(xiàng)目前期決策階段投資控制[J];價(jià)值工程;2014年09期
相關(guān)碩士學(xué)位論文 前3條
1 王守俊;建筑工程項(xiàng)目投標(biāo)前期決策分析研究[D];西安建筑科技大學(xué);2009年
2 姜山;影院建設(shè)項(xiàng)目前期決策策劃研究[D];清華大學(xué);2013年
3 楊傳軍;項(xiàng)目前期決策行為特性研究[D];西南石油學(xué)院;2005年
,本文編號(hào):1857906
本文鏈接:http://sikaile.net/jingjifazhanlunwen/1857906.html
最近更新
教材專著