水利工程PPP項目合同柔性調(diào)節(jié)機制研究
發(fā)布時間:2018-01-25 09:11
本文關(guān)鍵詞: 水利工程PPP項目 合同再談判 風(fēng)險傳遞 合同柔性 柔性調(diào)節(jié)機制 出處:《水電能源科學(xué)》2017年11期 論文類型:期刊論文
【摘要】:PPP項目實施過程中,政府和社會資本就未約定風(fēng)險責(zé)任的風(fēng)險事件或非預(yù)期風(fēng)險事件的責(zé)任分擔(dān)進行再談判是不可避免的。在細(xì)化項目運作流程的基礎(chǔ)上,結(jié)合水利工程PPP項目的專業(yè)特點,分析了水利工程PPP項目的合同柔性,構(gòu)建了水利工程PPP項目合同9種柔性調(diào)節(jié)機制,對合同結(jié)構(gòu)不完備和外部環(huán)境影響造成的風(fēng)險進行再分擔(dān),確保PPP項目的順利實施。研究成果可為水利工程PPP項目合同執(zhí)行提供理論參考。
[Abstract]:In the process of PPP project implementation, it is inevitable for the government and social capital to renegotiate the responsibility sharing of the risk event or the unexpected risk event, which is not stipulated in the risk responsibility, and on the basis of the refinement of the project operation process. Combined with the specialty characteristics of PPP project of water conservancy project, the contractual flexibility of PPP project of water conservancy project is analyzed, and nine flexible adjustment mechanisms of PPP project contract of water conservancy project are constructed. The risk caused by incomplete contract structure and external environment is reshared to ensure the smooth implementation of PPP project. The research results can provide a theoretical reference for the implementation of PPP project contract in water conservancy project.
【作者單位】: 華北水利水電大學(xué)水利學(xué)院;華北水利水電大學(xué)管理與經(jīng)濟學(xué)院;
【基金】:國家自然科學(xué)基金項目(51709116) 華北水利水電大學(xué)博士研究生創(chuàng)新基金項目(2014120108) 2016年度河南省軟科學(xué)研究計劃項目 河南省高等學(xué)校重點科研項目計劃(17B570003)
【分類號】:F283;F426.91
【正文快照】: 1引言PPP項目實施過程中,當(dāng)未約定風(fēng)險責(zé)任的風(fēng)險事件或非預(yù)期風(fēng)險事件發(fā)生時,政府和社會資本需通過協(xié)商確定該類風(fēng)險事件的責(zé)任分擔(dān),這就涉及到在原有PPP項目合同基礎(chǔ)上進行合同再談判。目前,關(guān)于PPP項目再談判的研究較多,如De Brux Julie[1]指出特許經(jīng)營合同再談判可幫助公