北京地鐵8號(hào)線永定門(mén)外站深基坑水下開(kāi)挖變形特性研究
[Abstract]:With the development of urbanization, underground engineering, especially deep foundation pit engineering, is increasingly used in cities. In order to solve the new problems, more and more engineering methods have appeared one after another, and the development of foundation pit engineering has far exceeded its theoretical development. Whether these novel methods are reasonable or not and how to keep the balance between the safety and deformation of foundation pit and the economy of foundation pit in practice, it is necessary to carry on the thorough research. On the basis of previous researches on deep foundation pit engineering, this paper analyzes the deformation mechanism of foundation pit excavation, and summarizes the natural factors, design factors and construction factors of foundation pit deformation. Based on the deep foundation pit project of Yongdingmen Station in the third phase of Beijing Metro Line 8, the paper analyzes the site monitoring data such as ground subsidence, horizontal displacement of ground connection wall and internal support axial force. The deformation law of deep foundation pit is obtained under the support of ground-connected wall. The space-time effect of foundation pit deformation in this project is studied, and the characteristics of foundation pit deformation under different working conditions are analyzed. Combined with the particularity of this project, this paper analyzes the deformation characteristics of foundation pit under various new conditions, such as underwater excavation and bottom sealing, pumping and recharging of water in the pit, and obtains the deformation law of underwater excavation of foundation pit. Midas/GTS finite element numerical simulation software is used to model and analyze the actual engineering, and the simulation results are compared with the field monitoring data. The accuracy of the numerical simulation is verified and the deformation law of the foundation pit is analyzed more intuitively. Numerical simulation is used to verify the significant restraint effect of the partition wall on foundation pit deformation. On the basis of verifying the accuracy of numerical simulation, using the method of numerical simulation and single variable analysis, various factors affecting the deformation of the foundation pit are analyzed, and the thickness of the ground connecting wall and the depth of the embedded wall are studied. The influence of the wall layout on the deformation of the supporting structure and the optimization suggestions for the design of the ground connecting wall are put forward. Based on deformation monitoring, the m value of soil in foundation pit is back analyzed, and some suggestions for optimization of design parameters are put forward.
【學(xué)位授予單位】:中國(guó)地質(zhì)大學(xué)(北京)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類(lèi)號(hào)】:U231.3;TU473.2
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 段寶德;石滿(mǎn)菊;王劍;;水下開(kāi)挖施工監(jiān)控系統(tǒng)[J];現(xiàn)代測(cè)繪;2007年06期
2 皇甫澤華,朱翠民,秦建法;泥漿泵的改裝及其水下開(kāi)挖清淤試驗(yàn)與運(yùn)用[J];水利水電科技進(jìn)展;2001年04期
3 韓治國(guó);唐依偉;;淺談引水渠水下開(kāi)挖施工方法[J];水利天地;2007年07期
4 趙文亭;潘家口水庫(kù)小電站尾水池水下開(kāi)挖施工方法[J];水力發(fā)電;1996年12期
5 劉凱南;三峽工程導(dǎo)流明渠進(jìn)、出口段恢復(fù)水下開(kāi)挖[J];水利水電快報(bào);1997年15期
6 馮建林;陳世杰;崔志廣;;彭水水電站右岸下游邊坡水下開(kāi)挖技術(shù)[J];云南水力發(fā)電;2013年05期
7 肖欣,朱志堅(jiān),薛家富;導(dǎo)流明渠水下開(kāi)挖[J];中國(guó)三峽建設(shè);1997年09期
8 吳朝月;周慶科;;瑯琊山抽水蓄能電站下水庫(kù)出口明渠水下開(kāi)挖及圍堰拆除設(shè)計(jì)及施工[J];電力標(biāo)準(zhǔn)化與技術(shù)經(jīng)濟(jì);2007年06期
9 ;三、氣泡帷幕[J];氣泡帷幕深水爆破防護(hù)技術(shù)總結(jié);1976年S2期
10 李耀良;王理想;余振棟;袁芬;;超大面積港池基坑的陸上和水下開(kāi)挖施工技術(shù)[J];建筑施工;2008年10期
相關(guān)會(huì)議論文 前10條
1 崔文光;崔春霖;夏可風(fēng);;南水北調(diào)穿黃工程北岸豎井水下開(kāi)挖施工技術(shù)[A];地基基礎(chǔ)工程與錨固注漿技術(shù):2009年地基基礎(chǔ)工程與錨固注漿技術(shù)研討會(huì)論文集[C];2009年
2 崔文光;崔春霖;夏可風(fēng);;南水北調(diào)穿黃工程北岸豎井水下開(kāi)挖施工技術(shù)[A];2008中國(guó)水力發(fā)電論文集[C];2008年
3 師旭超;巴松濤;;基于支持向量機(jī)方法的深基坑變形預(yù)測(cè)[A];科技、工程與經(jīng)濟(jì)社會(huì)協(xié)調(diào)發(fā)展——河南省第四屆青年學(xué)術(shù)年會(huì)論文集(上冊(cè))[C];2004年
4 葉俊能;劉干斌;;寧波地區(qū)深基坑工程施工預(yù)警指標(biāo)及風(fēng)險(xiǎn)評(píng)估研究[A];運(yùn)營(yíng)安全與節(jié)能環(huán)保的隧道及地下空間建設(shè)第2屆學(xué)術(shù)研討會(huì)交流報(bào)告[C];2011年
5 張康;崔江余;;石家莊某深基坑變形數(shù)值分析[A];第十屆建構(gòu)筑物改造和病害處理學(xué)術(shù)研討會(huì)、第五屆工程質(zhì)量學(xué)術(shù)會(huì)議論文集[C];2014年
6 樓楠;胡玉祥;;基于非固定站模式的大型深基坑變形監(jiān)測(cè)[A];第二十一屆海洋測(cè)繪綜合性學(xué)術(shù)研討會(huì)論文集[C];2009年
7 王建華;徐中華;陳錦劍;王衛(wèi)東;;上海軟土地區(qū)深基坑連續(xù)墻的變形特性淺析[A];上海軟土地區(qū)深基坑技術(shù)新進(jìn)展研討會(huì)論文集[C];2005年
8 賈堅(jiān);;控制深基坑變形的坑內(nèi)加固技術(shù)研究[A];2004年度上海市土力學(xué)與巖土工程學(xué)術(shù)年會(huì)論文集[C];2004年
9 王建華;徐中華;陳錦劍;王衛(wèi)東;;上海軟土地區(qū)深基坑連續(xù)墻的變形特性淺析[A];上海軟土地深基坑技術(shù)新進(jìn)展研討會(huì)論文集[C];2005年
10 任旺瑜;王建秀;;基于混沌理論和模糊控制理論的深基坑變形預(yù)測(cè)研究[A];上海防災(zāi)救災(zāi)研究所20周年慶典會(huì)議研究短文集[C];2009年
相關(guān)重要報(bào)紙文章 前5條
1 晏明智 記者 曲倩影;地鐵1號(hào)線珠江路站正式開(kāi)挖基坑[N];南昌日?qǐng)?bào);2010年
2 本報(bào)記者 韓慶文 見(jiàn)習(xí)記者 任,
本文編號(hào):2342277
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/2342277.html