錦和一品小區(qū)項(xiàng)目進(jìn)度計(jì)劃與控制研究
[Abstract]:Construction industry is an important pillar industry in the development of our national economy, which has made important contribution to promoting economic and social development and improving people's livelihood. China is in the new era of urbanization and vigorous development of the background of construction engineering projects in the management of higher requirements. Project schedule management level relates to the project duration, quality, capital investment and the interests of all parties. Project schedule planning and control is a very important part of construction project management. The project schedule is the first step of the project management. Making a reasonable project schedule can make the project construction achieve a good balance between the cost and the construction period, which is conducive to the implementation of the project construction. The project schedule control is the control method of whether the project construction can be completed according to the project plan, which is of great significance to the completion of the project goal. This article takes Shangcheng County brocade and Yi Pin small area project as the case object. Firstly, this paper studies and analyzes the theory of project schedule and project schedule control in the theory of construction project management, studies the principles, methods, steps and optimization of project schedule planning, and completes the formulation of project plan. Then in the implementation of the project according to the project plan to control the progress of the project, according to the actual situation in the construction process of the project to adopt various control methods to ensure the progress of the project according to the project plan, Ensure that the project can avoid delays and ultimately be completed at guaranteed cost and quality. I hope the work of this paper can help to improve the level of project management in the construction industry, and provide reference for the implementation of other projects.
【學(xué)位授予單位】:湖北工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TU722
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張建明;劉俊勇;;電力系統(tǒng)建設(shè)項(xiàng)目進(jìn)度3D可視化關(guān)鍵技術(shù)[J];電力自動(dòng)化設(shè)備;2010年06期
2 佘立中;溫冉;;大型集群工程進(jìn)度管理的復(fù)雜性分析與對(duì)策研究[J];施工技術(shù);2009年05期
3 蒲欣;李紀(jì)珍;;西方公司研發(fā)項(xiàng)目管理流程在中國(guó)的適應(yīng)性研究——朗訊(中國(guó))研發(fā)中心的案例分析[J];科學(xué)學(xué)與科學(xué)技術(shù)管理;2008年08期
4 王幼松;陳漢云;申立銀;張雁;;政府建設(shè)工程超期超支問(wèn)題的關(guān)鍵因素分析[J];建筑經(jīng)濟(jì);2008年07期
5 李雪淋;王卓甫;劉曉平;毛建平;;基于向量評(píng)價(jià)遺傳算法的工程項(xiàng)目多目標(biāo)優(yōu)化[J];水運(yùn)工程;2007年11期
6 廖勇;;淺談洪家渡電站建設(shè)項(xiàng)目的進(jìn)度控制與管理[J];職業(yè)圈;2007年02期
7 劉曉峰;陳通;張連營(yíng);;基于微粒群算法的工程項(xiàng)目質(zhì)量、費(fèi)用和工期綜合優(yōu)化[J];土木工程學(xué)報(bào);2006年10期
8 趙延軍;王曉鳴;;房地產(chǎn)開(kāi)發(fā)項(xiàng)目的效用決策模型研究[J];華中科技大學(xué)學(xué)報(bào)(城市科學(xué)版);2006年01期
9 孟憲海 ,次仁頓珠 ,趙啟;EPC總承包模式與傳統(tǒng)模式之比較[J];國(guó)際經(jīng)濟(jì)合作;2004年11期
10 張連營(yíng),王亮,呂文學(xué);網(wǎng)絡(luò)計(jì)劃的模糊分析[J];天津大學(xué)學(xué)報(bào);2004年02期
,本文編號(hào):2316686
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/2316686.html